roofy

Violations at 414 Howard Avenue

Brooklyn, NY 11233 · BBL 3-01451-0048 · Back to the property

HPD housing violations

25 HPD violations, newest first.

  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 1st story, 1st apartment from south at west

    Oct 17, 2026 · Apt 3B

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 8, 2026

    Closed — Violation dismissed
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the private hallway located at apt 3b, 3rd story, 1st apartment from north at east

    Mar 31, 2026 · Apt 3B

    Closed — Violation dismissed
  • ANon-hazardous

    Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the private hallway located at apt 3b, 3rd story, 1st apartment from north at east

    Mar 31, 2026 · Apt 3B

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4a, 4th story, 1st apartment from south at west

    Dec 10, 2025 · Apt 4A

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Dec 10, 2025 · Apt 4A

    Closed — Violation dismissed
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Dec 10, 2025 · Apt 4A

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Dec 10, 2025 · Apt 4A

    Open — Nov sent out
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at window recess at east wall in the 1st room from east located at apt 3b, 3rd story, 1st apartment from north at east

    Dec 6, 2025 · Apt 3B

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 13, 2025

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Apr 14, 2025 · Apt 4A

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 4a, 4th story, 1st apartment from south at west

    Feb 14, 2025 · Apt 4A

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Feb 14, 2025 · Apt 4A

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Feb 14, 2025 · Apt 4A

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east

    Feb 14, 2025 · Apt 3B

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east

    Feb 14, 2025 · Apt 3B

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east

    Feb 14, 2025 · Apt 3B

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at basement

    Feb 11, 2025

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the smoke detector defective in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west

    Feb 11, 2025 · Apt 2A

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west

    Feb 11, 2025 · Apt 2A

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west

    Feb 11, 2025 · Apt 2A

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west

    Feb 11, 2025 · Apt 2A

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinge at fire door leading to stairs at public hall, 2nd story

    Dec 4, 2024

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches at cellar

    Jun 8, 2020

    Closed — Violation closed
  • BHazardous

    Abate the infestation consisting of vermin (flies) at cellar

    Jun 8, 2020

    Closed — Violation closed

DOB building violations

11 DOB violations, newest first.

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations

8 ECB violations, newest first.

  • Class - 2

    Hw circulator bearing assemblies not turned so oil cups are in the upright position+ lubricated- pump wires exposed-tekmar pump sequencer defect-hw temperature gauge leaking-combustion air duct 1/2 clogged-base

    Apr 24, 2020 · Penalty $3,125

    Active
  • Class - 1

    3303.3,obstruction of sidewalk end street q/o dot permit.note:@ the time of insp const work in progress.i observed concrete truck crossing sidewalk performing const operation upon review of const documents i ob

    Dec 13, 2014 · Penalty $1,600

    Resolve
  • Class - 1

    3307.5.2,flag persons.note:@ the time of insp const workin progress.i observed concrete truck crossing sidewalk performing concrete pouring operation.@ exp 2.i also observed pedestrians avoiding const operation

    Dec 13, 2014 · Penalty $1,600

    Resolve
  • Class - 1

    3307.6.25 areas to be protected.note:@ time of my insp.construction work in progress,i observed that walkway that lead from the street to an entrance or exit into or out of the bldg under construction was not p

    Jul 15, 2014 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations.note:@ the time of my insp.construction work in progress of 4 story residential bldg that was approx.42'from ground level.i observ

    Jul 15, 2014 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. bc 3314.5. scaffold platforms not fully planked. at the time of my inspection construction work in progress. i observed workers using scaffold and platform not fully planked. in danger of slipping and

    Dec 7, 2013 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to institute/maintain safety measures or temp construction - no guard rails or toe board - at the time of my inspection construction work in progress. i observed 6 workers on top of supported scaffold

    Dec 7, 2013 · Penalty $1,200

    Resolve
  • Class - 1

    Use of supported scaffold w/o a scaffold user certificate. at the timeof my inspection, 6 workers on site using supported pipe scaffold on the main flr of the bldg to form ring beam. on request for scaffold

    Dec 7, 2013 · Penalty $1,600

    Resolve