Violations at 404 Howard Avenue
Brooklyn, NY 11233 · BBL 3-01451-0042 · Back to the property
HPD housing violations
The newest 50 of 77 HPD violations. The city keeps the complete history.
- CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet, 4th story
Oct 6, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 2nd apartment from west at north
Oct 6, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 2nd apartment from west at north
Oct 6, 2026 · Apt 4B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide ready access to buildings heating system observed door to basement lock at time of inspection at boiler room
Sep 25, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Sep 25, 2026 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ...hinge at fire door at bulkhead to the roof , 4th story
Sep 10, 2026
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the ...floor at compactor closet, 4th story
Sep 10, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet, 4th story
Sep 10, 2026
Open — Nov certified on time - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective heavy duty lock at building entrance door
Feb 24, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 2nd apartment from south at west
Feb 11, 2026 · Apt 3B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective baseboard radiator at east wall in the 1st room from north located at apt 3c, 3rd story, 1st apartment from north at east
Feb 1, 2026 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective lower sash interior glass pane at 2nd window from north at east in the 3rd room from north located at apt 3c, 3rd story, 1st apartment from north at east
Feb 1, 2026 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at lower sash and 2nd window from north in the 3rd room from north located at apt 3c, 3rd story, 2nd apartment from north at east
Jan 22, 2026 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet, 1st story
Oct 8, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet, 4th story
Oct 8, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet, 3rd story
Oct 8, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet, 2nd story
Oct 8, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls in the bathroom located at apt 3c, 3rd story
Sep 8, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective electricial light fixture at ceiling in the 4th room from north located at apt 3c, 3rd story
Sep 8, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the 2nd room from north located at apt 3c, 3rd story
Sep 8, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame at compactor door at compactor closet, 3rd story
Feb 22, 2025
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
Feb 22, 2025 · Apt 3B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
Feb 22, 2025 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3b, 3rd story, 2nd apartment from west at north
Feb 22, 2025 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 10, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 4th story, 1st apartment from south at west
Jan 10, 2025 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 2nd apartment from south at west
Dec 7, 2024 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at north at boiler room, 1st story
Dec 3, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 2nd room from north located at apt 4a, 4th story, 1st apartment from south at west
Dec 3, 2024 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 2nd room from north located at apt 4a, 4th story, 1st apartment from south at west
Dec 3, 2024 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at west wall in the 4th room from north located at apt 3a, 3rd story, 1st apartment from south at west
Jan 9, 2024 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 4th room from north located at apt 3a, 3rd story, 1st apartment from south at west
Jan 9, 2024 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective calking around bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west
Aug 28, 2023 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all wall in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Aug 28, 2023 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Aug 28, 2023 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Aug 28, 2023 · Apt 3A
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of vermin flies in the entire apartment located at apt 3c, 3rd story, 1st apartment from south at west
Aug 23, 2022 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall and east wall in the bathroom located at apt 1a, 1st story, 11th apartment from south at west
Aug 11, 2022 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 2nd room from north at west located at apt 1a, 1st story, 11th apartment from south at west
Aug 11, 2022 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 11th apartment from south at west
Aug 11, 2022 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 4th room from east located at apt 3, 1st story, 1st apartment from south at west
Jul 2, 2022 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from east located at apt 3, 1st story, 1st apartment from south at west
Jul 2, 2022 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation door frame at entrance in the 4th room from east located at apt 3, 1st story, 1st apartment from south at west
Jul 2, 2022 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls and ceiling in the 1st room from east located at apt 3, 1st story, 1st apartment from south at west
Jul 2, 2022 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... approx 10 sq.ft at west wall, approx 5 sq.ft at north wall, approx 5 sq.ft at south wall and approx 10 sq.ft at ceilng in the bathroom located at apt 3, 1st story, 1st apartment from south at west
Jul 2, 2022 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the east wall in the kitchen located at apt 3, 1st story, 1st apartment from south at west
Jul 2, 2022 · Apt 3
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective electrical light fixtures at ceiling at public hall stairs, 1st story
Jun 24, 2022
Closed — Violation dismissed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination the ceiling light in the public hall at 4th, 2nd and 1st stories
Apr 22, 2022
Closed — Violation dismissed
DOB building violations
2 DOB violations, newest first.
- Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Feb 16, 1999
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 16, 1991
Vpw*-violation unserved ecb-work without permit-dismissed
ECB violations
2 ECB violations, newest first.
- Class - 2
Failure to comply with commissioner's order contained in summons #39083341h issued on 04/10/2023, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Jan 29, 2025 · Penalty $3,125
Resolve - Class - 3
Boiler indirect hot water tank is leaking;correct violation and submit the certificate of correction
Apr 10, 2023 · Penalty $500
Active