2182 Atlantic Avenue
Brooklyn, NY 11233BBL 3-01433-0038Map
Owner of record: 2182 Atlantic Holdings LLC
2182 Atlantic Avenue is a walk-up apartment building built in 1910 in Brooklyn, 11233. It has 16 residential units across 4 floors. The owner of record is 2182 Atlantic Holdings LLC. HPD has recorded 316 housing violations here, most recently on October 7, 2026. 12 of the 50 most recent violations are still open.
- HPD violations
- 316
- DOB violations
- 15
- ECB violations
- 7
- HPD complaints
- 409
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 316
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner unit protrunding over 6 beyond window sillat 2nd story balcony at building front at fire escape
Oct 7, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestbule door. at public hall, 1st story
Oct 7, 2026
Open — Violation will be reinspected - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 2b, 2nd story, 2nd apartment from south at west
Sep 23, 2026 · Apt 2B
Open — Civ14 mailed - CImmediately hazardous
Properly repair or replace the broken or defective sink in the kitchenette located at apt 2b, 2nd story, 2nd apartment from south at west
Sep 23, 2026 · Apt 2B
Closed — Violation closed - ANon-hazardous
Refit upper and lower sash at the north window in the kitchenette located at apt 2b, 2nd story, 2nd apartment from south at west
Aug 10, 2026 · Apt 2B
Open — Civ14 mailed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north at center located at apt 2b, 2nd story, 2nd apartment from south at west
Aug 10, 2026 · Apt 2B
Open — Civ14 mailed - BHazardous
M/d law abate the nuisance consisting of garbage cans stored under drop ladder at building front creating a hazard at fire escape
Aug 10, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st story
Aug 10, 2026
Closed — Violation closed - ANon-hazardous
Refit the lower sash at the 1st window from west at north wall in the 1st room from north at west located at apt 2b, 2nd story, 2nd apartment from south at west
Aug 10, 2026 · Apt 2B
Open — Civ14 mailed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 2b, 2nd story, 2nd apartment from south at west
Aug 10, 2026 · Apt 2B
Open — Civ14 mailed
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 2nd apartment from south at west
Aug 10, 2026 · Apt 2B
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenette located at apt 2b, 2nd story, 2nd apartment from south at west
Aug 10, 2026 · Apt 2B
Open — Civ14 mailed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at , yard
May 27, 2026
Open — Defect letter issued - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at , yard at northwest
May 7, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at public hall, 1st story
May 7, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective intercom system in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
May 7, 2026 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the foyer located at apt 2d, 2nd story, 1st apartment from north at east
Dec 22, 2025 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door leading from west yard at boiler room, 1st story
Dec 22, 2025
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 2d, 2nd story, 1st apartment from north at east
Dec 22, 2025 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2d, 2nd story, 1st apartment from north at east
Dec 22, 2025 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east and north walls in the bathroom located at apt 2d, 2nd story, 1st apartment from north at east
Dec 22, 2025 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wal and ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from north at east
Dec 22, 2025 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from north at east
Dec 22, 2025 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east
Dec 22, 2025 · Apt 2D
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east
Dec 22, 2025 · Apt 2D
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Dec 22, 2025
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at west yard yard
Dec 22, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Dec 22, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Replace with new the missing cover plate for junction box at east wall of water heater closet in the 1st room from north at center located at apt 2b, 2nd story, 1st apartment from south at west
Dec 10, 2025 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 3; in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Dec 10, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
Dec 10, 2025 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Properly secure the loose metal strip at floor in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
Dec 10, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
Dec 10, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Refit the upper and lower sashes at the north window in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
Dec 10, 2025 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall
Apr 17, 2025
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall
Apr 17, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at all walls at vestibule , 1st story
Apr 17, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective with fire retardant materials at all walls and ceiling at vestibule , 1st story
Apr 17, 2025
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at vestibule , 1st story
Apr 17, 2025
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at vestibule , 1st story
Apr 17, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at vestibule at public hall, 1st story
Mar 8, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at vestibule at public hall, 1st story
Mar 8, 2025
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Mar 8, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective glass pane at building entrance door at public hall, 1st story
Mar 8, 2025
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the stairs and landings at vestibule at public hall, 1st story
Mar 8, 2025
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall stairs, 3rd story
Nov 16, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Nov 16, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at celing at public hall, 1st story
Nov 16, 2024
Closed — Violation closed
DOB building violations · 15
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 21, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed
Show 5 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 7
- Class - 1
Observed large amount of garbage blocking passageway from rear of building to front from buildings alleyway at exposure 4 side., remove obstruction
Mar 31, 2026 · Penalty $2,500
Active - Class - 2
Observe sever split ductless untils installed and exposure 3 and 4 no permits for electrical connection to system on record for this work., obtain all permits
Mar 31, 2026 · Penalty $1,250
Active - Class - 1
10,41c,51.50-boiler is leaking front & rear,fire chamber doors front & rear open no (baskets) &bolts.*repair all hazardous conditions immediatelty & call dob 212-393-2784 too lift cease use or (dcr)*.
Dec 18, 2017 · Penalty $1,000
Active - Class - 3
Failure to maintain bldg in code compliant manner.note:in unit #2a bathroom shower,tiles fell/falling off walls revealing a hole 18"x18"in wall.plaster fell from hole in kitchen ceiling(3"dia).rem:repair/replac
Sep 5, 2012 · Penalty $500
Active - Non-hazardous
Exit passage: required width decreased by obstruction. note: at rear fire escape blocked by make shift garden with plants, flower pots and chicken wire. remedy: remove obstruction.
Aug 25, 2005 · Penalty $180
Active - Non-hazardous
Use of prohibited door. note at interior courtyard a steel gate was installed. remedy: remove illegal gate.
Aug 25, 2005 · Penalty $350
Active - Non-hazardous
Failure to maintain building-hazardous-defect noted: at front of building missing, broken and rotting handrail and railing leading to interior court yard creating trip hazard to court yard stair well with an
Aug 25, 2005
Resolve
Complaints
- Unsanitary condition
Mold
Oct 23, 2026 · Apt 2B
Open - Flooring/stairs
Floor
Oct 23, 2026 · Apt 2B
Open - Door/window
Window frame
Oct 23, 2026 · Apt 2B
Open - Unsanitary condition
Pests
Oct 23, 2026 · Apt 2B
Open - Heat/hot water
Entire building
Oct 8, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Oct 8, 2026 · Apt 1B
Close - Plumbing
Basin/sink
Sep 21, 2026 · Apt 2B
Close - Plumbing
Basin/sink
Sep 21, 2026 · Apt 2B
Close - Paint/plaster
Door/frame
Aug 24, 2026 · Apt 2B
Close - Paint/plaster
Wall
Aug 24, 2026 · Apt 2B
Close
Show 40 more ↓
- Plumbing
Basin/sink
Aug 21, 2026 · Apt 2B
Close - Electric
Lighting
Aug 21, 2026 · Apt 2B
Close - Unsanitary condition
Mold
Aug 21, 2026 · Apt 2B
Close - Paint/plaster
Ceiling
Aug 21, 2026 · Apt 2B
Close - Door/window
Window frame
Aug 21, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Aug 21, 2026 · Apt 2B
Close - General
Ventilation system
Aug 21, 2026 · Apt 2B
Close - Safety
Fire escape
Aug 21, 2026 · Apt 2B
Close - Paint/plaster
Wall
Aug 21, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Aug 21, 2026 · Apt 2B
Close - Door/window
Window frame
Aug 5, 2026 · Apt 2B
Close - Paint/plaster
Wall
Aug 5, 2026 · Apt 2B
Close - Paint/plaster
Ceiling
Aug 5, 2026 · Apt 2B
Close - Water leak
Slow leak
Aug 5, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Aug 5, 2026 · Apt 2B
Close - Flooring/stairs
Floor
Aug 5, 2026 · Apt 2B
Close - Paint/plaster
Wall
Aug 5, 2026 · Apt 2B
Close - Plumbing
Basin/sink
Aug 5, 2026 · Apt 2B
Close - Unsanitary condition
Mold
Aug 5, 2026 · Apt 2B
Close - Door/window
Window frame
Jul 22, 2026 · Apt 2B
Close - Paint/plaster
Ceiling
Jul 22, 2026 · Apt 2B
Close - Flooring/stairs
Floor
Jul 22, 2026 · Apt 2B
Close - Water leak
Heavy flow
Jul 22, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Apr 9, 2026 · Apt 1B
Close - Heat/hot water
Apartment only
Mar 13, 2026 · Apt 1B
Close - Door/window
Window frame
Feb 27, 2026 · Apt 1D
Close - Appliance
Electric/gas range
Dec 16, 2025 · Apt 2D
Close - Electric
Power outage
Dec 16, 2025 · Apt 2D
Close - Heat/hot water
Apartment only
Dec 16, 2025 · Apt 2D
Close - Door/window
Window frame
Dec 9, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 2B
Close - Flooring/stairs
Floor
Dec 9, 2025 · Apt 2B
Close - Unsanitary condition
Garbage/recycling storage
Nov 19, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 19, 2025 · Apt BLDG
Close - Plumbing
Basin/sink
Nov 17, 2025 · Apt 2B
Close - Flooring/stairs
Floor
Nov 17, 2025 · Apt 2B
Close - Paint/plaster
Wall
Nov 17, 2025 · Apt 2B
Close - Plumbing
Bathtub/shower
Nov 17, 2025 · Apt 2B
Close - Door/window
Window frame
Nov 17, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Oct 23, 2025 · Apt 1D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1910
- Floors
- 4
- Residential units
- 16
- Building area
- 17,000 ft²
- Lot area
- 5,000 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 41
- Block / lot
- 1433 / 38
- Assessed value
- $597,150
- Landmark / historic district
- No
HPD registration #313242, last renewed Jul 1, 2025.
Questions about 2182 Atlantic Avenue
Who owns 2182 Atlantic Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2182 Atlantic Holdings LLC.
Does 2182 Atlantic Avenue have violations?
Yes. NYC HPD has recorded 316 housing violations at this property.
Is 2182 Atlantic Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2182 Atlantic Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 2182 Atlantic Avenue?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.