1410 Lincoln Place
Brooklyn, NY 11213BBL 3-01391-0021Map
Owner of record: Inez Idlett
1410 Lincoln Place is a two-family home built in 1910 in Brooklyn, 11213. It has 2 residential units across 2 floors. The owner of record is Inez Idlett. HPD has recorded 91 housing violations here, most recently on March 3, 2023. 36 of the 50 most recent violations are still open.
- HPD violations
- 91
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 58
Available now in this building
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 91
- BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 3, 2023 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures . in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 3, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 3, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Jan 24, 2023 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Jan 24, 2023 · Apt 1
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at the ceiling and electrical outlet at the south wall in the kitchen located at apt 1, 1st story
Apr 18, 2022 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of household items obstructing egress at scuttle ladder at closet at private hallway located at apt 2, 2nd story
Apr 18, 2022 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective acoustic tiles at the ceiling in the 5th room from north located at apt 2, 2nd story
Apr 18, 2022 · Apt 2
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at the ceiling in the kitchen located at apt 2, 2nd story
Apr 18, 2022 · Apt 2
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... at the south wall approx. 18 sq.ft, the east wall approx. 20 sq.ft, the west wall approx. 7 sq.ft and the north wall approx. 1 sq.ft. in the bathroom located at apt 2, 2nd story
Apr 18, 2022 · Apt 2
Open — Notice of issuance sent to tenant
Show 40 more ↓
- BHazardous
Repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 2, 2nd story
Apr 18, 2022 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of electric extension cord from outlet at north wall to kitchen appliances across floor at south wall in the kitchen located at apt 1, 1st story
Apr 18, 2022 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of scalding hotwater exceeding the maximum temperature of 130 degrees at all fixtures. in the entire apartment located at apt 1, 1st story
Apr 18, 2022 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective metal cornice at building front
Apr 18, 2022
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at the ceiling and electrical outlets at the north and south walls in the 5th room from north located at apt 1, 1st story
Apr 18, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling at the private hallway in front of the bathroom located at apt 1, 1st story
Apr 18, 2022 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the private hallway in front of the bathroom located at apt 1, 1st story
Apr 18, 2022 · Apt 1
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 29, 2022
Open — Info nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 1, 1st story
Mar 10, 2022 · Apt 1
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures light fixtures at ceiling and outlets at all walls in the kitchen located at apt 1, 1st story
Mar 10, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the private hallway located at apt 1, 1st story
Mar 10, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets hot water fixture at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Mar 10, 2022 · Apt 2
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures light fixture at ceiling and all wall outlets in the 5th room from north at west located at apt 2, 2nd story, 1st apartment from east at south
Mar 10, 2022 · Apt 2
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures light fixture at ceiling and all wall outlets in the 4th room from north located at apt 2, 2nd story, 1st apartment from east at south
Mar 10, 2022 · Apt 2
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures light fixtures at ceiling and all wall outlets in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Mar 10, 2022 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story
Oct 28, 2021 · Apt 1
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the debris throughout at cellar
Oct 28, 2021
Open — Nov sent out - CImmediately hazardous
Cleanse and disinfect to the satisfaction of this department after removing the water throughtout at cellar
Oct 28, 2021
Closed — Violation closed - BHazardous
Properly repair the broken or defective outlet at west wall in the 4th room from east located at apt 1, 1st story
Oct 28, 2021 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures throughout at cellar
Oct 28, 2021
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at stove in the kitchen located at apt 1, 1st story
Oct 28, 2021 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story
Oct 28, 2021 · Apt 2
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective door at entrance in the 1st room from north located at apt 2, 2nd story
Oct 8, 2021 · Apt 2
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... at east , south and west walls. approx 20 sq ft in the bathroom located at apt 2, 2nd story original violation 14618558 issued 08-oct-21 has been upgraded to class c per administrative code §27-2017.3a(5)(a) or (b).
Oct 8, 2021 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective [ inoperative ] electrical light fixture at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Oct 8, 2021 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective acoustical tiles at ceiling in the 5th room from north at east located at apt 2, 2nd story
Oct 8, 2021 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective acoustical tiles at ceiling in the 3rd room from north located at apt 2, 2nd story
Oct 8, 2021 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2, 2nd story
Oct 8, 2021 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at shower stall in the bathroom located at apt 2, 2nd story
Oct 8, 2021 · Apt 2
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at east , south and west walls. approx 20 sq ft in the bathroom located at apt 2, 2nd story
Oct 8, 2021 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story
Oct 8, 2021 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective [ inoperative ] electrical light fixture at ceiling in the kitchen located at apt 2, 2nd story
Oct 8, 2021 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Oct 8, 2021 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the broken or defective [ inoperative ] electrical switch at east wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Oct 8, 2021 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective [ rotted ] wood floor in the 6th room from north located at apt 1, 1st story, 1st apartment from east at south
Oct 8, 2021 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly secure the loose sink to counter top in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Oct 8, 2021 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective [ inoperative ] electrcal light fixture at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Oct 8, 2021 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the 6th room from north located at apt 1, 1st story, 1st apartment from east at south
Oct 8, 2021 · Apt 1
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at south wall in the 1st room from north located at apt 1, 1st story, 1st apartment from east at south
Oct 8, 2021 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective [ inoperative ] electrical outlet at south wall in the 5th room from north at east located at apt 1, 1st story, 1st apartment from east at south
Oct 8, 2021 · Apt 1
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 2
Respondent was issued rca on 01/025/23 for green mountain boiler inoperatable. failed to provide access to determine if the condition was corrected., maintain boiler
Mar 22, 2024 · Penalty $1,562
Resolve
Complaints
- Plumbing
Bathtub/shower
Mar 2, 2023 · Apt 12
Close - Water leak
Heavy flow
Mar 2, 2023 · Apt 12
Close - Heat/hot water
Entire building
Mar 2, 2023 · Apt 12
Close - Heat/hot water
Entire building
Jan 23, 2023 · Apt BLDG
Close - Water leak
Heavy flow
Nov 5, 2022 · Apt 12
Close - Electric
No lighting
Apr 15, 2022 · Apt 1
Close - Water leak
Heavy flow
Apr 15, 2022 · Apt 1
Close - Heat/hot water
Apartment only
Apr 15, 2022 · Apt 1
Close - Electric
No lighting
Dec 15, 2021 · Apt 2
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt 1AND2
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Oct 29, 2021 · Apt 1
Close - Door/window
Door
Oct 6, 2021 · Apt 1
Close - Plumbing
Basin/sink
Oct 6, 2021 · Apt 1
Close - Flooring/stairs
Floor
Oct 6, 2021 · Apt 1
Close - Heat/hot water
Entire building
Oct 6, 2021 · Apt 1
Close - Electric
Power outage
Oct 6, 2021 · Apt 1
Close - Water leak
Damp spot
Oct 6, 2021 · Apt 1
Close - Plumbing
Bathtub/shower
Oct 6, 2021 · Apt 1
Close - Heat/hot water
Entire building
Oct 6, 2021 · Apt 1
Close - Paint/plaster
Ceiling
Oct 6, 2021 · Apt 1
Close - Appliance
Refrigerator
Oct 6, 2021 · Apt 1
Close - Electric
No lighting
Oct 6, 2021 · Apt 1
Close - Door/window
Door frame
Oct 6, 2021 · Apt 1
Close - Electric
Power outage
Oct 6, 2021 · Apt 1
Close - Heat/hot water
Entire building
Sep 9, 2021 · Apt 1AND2
Close - Paint/plaster
Ceiling
Sep 9, 2021 · Apt 1AND2
Close - Electric
Power outage
Sep 9, 2021 · Apt 1AND2
Close - General
Cooking gas
Sep 9, 2021 · Apt 1AND2
Close - Electric
No lighting
Sep 9, 2021 · Apt 1AND2
Close - Door/window
Door frame
Sep 9, 2021 · Apt 1AND2
Close - Appliance
Refrigerator
Sep 9, 2021 · Apt 1AND2
Close - Flooring/stairs
Floor
Sep 9, 2021 · Apt 1AND2
Close - Plumbing
Basin/sink
Sep 9, 2021 · Apt 1AND2
Close - Plumbing
Bathtub/shower
Jul 26, 2021 · Apt 1
Close - Electric
No lighting
Jul 26, 2021 · Apt 1
Close - Plumbing
Basin/sink
Jul 26, 2021 · Apt 1
Close - Unsanitary condition
Pests
Jul 26, 2021 · Apt 1
Close - Flooring/stairs
Floor
Jul 26, 2021 · Apt 1
Close - Unsanitary condition
Mold
Jun 14, 2021 · Apt 1
Close - Paint/plaster
Ceiling
Jun 14, 2021 · Apt 1
Close - Water leak
Damp spot
Jun 14, 2021 · Apt 1
Close - Water leak
Slow leak
Jun 14, 2021 · Apt 1
Close - Electric
Outlet/switch
Jun 14, 2021 · Apt 1
Close - Electric
No lighting
Jun 14, 2021 · Apt 1
Close - Electric
Power outage
Jun 14, 2021 · Apt 1
Close - Electric
Wiring
Jun 14, 2021 · Apt 1
Close - Appliance
Refrigerator
Feb 18, 2021 · Apt 2
Close - Heat/hot water
Entire building
Feb 1, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2021 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 25, 2021 · Apt 1A
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 26, 2026 | $1,220,000 | Two family dwellings | 2 |
Building details
- Building type
- Two-family home (B3)
- Year built
- 1910
- Floors
- 2
- Residential units
- 2
- Building area
- 2,332 ft²
- Lot area
- 2,908 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 41
- Block / lot
- 1391 / 21
- Assessed value
- $59,760
- Landmark / historic district
- No
Questions about 1410 Lincoln Place
Who owns 1410 Lincoln Place?
The owner of record in NYC Department of City Planning PLUTO data is Inez Idlett.
Does 1410 Lincoln Place have violations?
Yes. NYC HPD has recorded 91 housing violations at this property.
Is 1410 Lincoln Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1410 Lincoln Place built?
City records list 1910 as the year it was built.
How many apartments are in 1410 Lincoln Place?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.
