roofy

1366 St Johns Place

Brooklyn, NY 11213BBL 3-01384-0015Map

Owner of record: St. Johns Holdings 2015 LLC

1366 St Johns Place is a walk-up apartment building built in 1925 in Brooklyn, 11213. It has 8 residential units across 4 floors. The owner of record is St. Johns Holdings 2015 LLC. HPD has recorded 346 housing violations here, most recently on January 13, 2026. 13 of the 50 most recent violations are still open.

HPD violations
346
DOB violations
24
ECB violations
6
HPD complaints
287

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jan 13, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 346

  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6, 3rd story, 1st apartment from south at west

    Jan 13, 2026 · Apt 6

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system locked door at boiler room

    Jan 13, 2026

    Closed — Violation dismissed
  • B

    Provide a safe and adequate supply of electric service to the fixtures electric at fixtures at ceiling in the kitchen located at apt 8, 4th story, 1st apartment from south at west

    Oct 21, 2024 · Apt 8

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 8, 4th story, 1st apartment from south at west

    Oct 21, 2024 · Apt 8

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 8, 4th story, 1st apartment from south at west

    Oct 21, 2024 · Apt 8

    Closed — Violation dismissed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the 4th room from north located at apt 8, 4th story, 1st apartment from south at west

    Oct 21, 2024 · Apt 8

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color window stool in the kitchen located at apt 3, 2nd story, 1st apartment from north at east

    Aug 28, 2024 · Apt 3

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    Jul 29, 2024 · Apt 3

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3, 2nd story, 1st apartment from north at east

    Jul 29, 2024 · Apt 3

    Open — Not complied with
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 3, 2nd story, 1st apartment from north at east

    Jul 29, 2024 · Apt 3

    Open — Not complied with
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from north, the 5th room from north, the kitchen , the 1st room from north located at apt 3, 2nd story, 1st apartment from north at east

    Jul 29, 2024 · Apt 3

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    Jul 29, 2024 · Apt 3

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    Jul 29, 2024 · Apt 3

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3, 2nd story, 1st apartment from north at east

    Jul 29, 2024 · Apt 3

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 12, 2024

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective entrance door in the bathroom located at apt 8, 4th story, 1st apartment from south at west

    Apr 12, 2024 · Apt 8

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 11, 2024

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 1 in the 2nd room from north at west located at apt 6, 3rd story, 1st apartment from south at west

    Feb 10, 2023 · Apt 6

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6, 3rd story, 1st apartment from south at west

    Feb 10, 2023 · Apt 6

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6, 3rd story, 1st apartment from south at west

    Feb 10, 2023 · Apt 6

    Open — Notice of issuance sent to tenant
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 6, 3rd story, 1st apartment from south at west

    Feb 10, 2023 · Apt 6

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures [no gas supply to gas ranges in the kitchenette located at apt 6, 3rd story, 1st apartment from south at west

    Feb 10, 2023 · Apt 6

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of missing metal cap at disconnected radiator supply line at south wall in the 2nd room from north at west located at apt 6, 3rd story, 1st apartment from south at west

    Feb 10, 2023 · Apt 6

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 6, 3rd story, 1st apartment from south at west

    Feb 10, 2023 · Apt 6

    Closed — Violation dismissed
  • C

    Properly secure the loose wood tread 1st from bottom up , at public hall stairs, 2nd story

    Feb 10, 2023

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective at bulkhead to the roof

    Oct 15, 2022

    Closed — Violation closed
  • B

    Remove the illegal fastening lockedable slide bolt with eyes capable of been pad lock at door leading to cellar , 1st story

    Aug 13, 2022

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system locked door at basement

    Aug 13, 2022

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 1st story, 1st apartment from east at south

    Aug 13, 2022 · Apt 2

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 2, 1st story, 1st apartment from east at south

    Jun 14, 2022 · Apt 2

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st riser at west in the kitchen located at apt 6, 3rd story, 1st apartment from south at west

    Mar 5, 2022 · Apt 6

    Open — Nov sent out
  • B

    Repair the broken or defective connection at waste pipe in the kitchen located at apt 6, 3rd story, 1st apartment from south at west

    Mar 5, 2022 · Apt 6

    Closed — Violation closed
  • C

    Remove all obstructions and repair all defects in at sink in the kitchen located at apt 6, 3rd story, 1st apartment from south at west

    Mar 5, 2022 · Apt 6

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt 6, 3rd story, 1st apartment from south at west

    Mar 5, 2022 · Apt 6

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 6, 3rd story, 1st apartment from south at west

    Mar 5, 2022 · Apt 6

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6, 3rd story, 1st apartment from south at west

    Mar 5, 2022 · Apt 6

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 6, 3rd story, 1st apartment from south at west

    Mar 5, 2022 · Apt 6

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective plaster ceiling at public hall stairs, 1st story

    Dec 2, 2021

    Closed — Violation closed
  • B

    Repair the broken or defective connection waste line at sink in the kitchen located at apt 6, 3rd story, 1st apartment from south at west

    Aug 26, 2021 · Apt 6

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 3; in the entire apartment located at apt 8, 4th story, apartment at west

    Aug 18, 2021 · Apt 8

    Closed — Violation dismissed
  • C

    Replace with new the missing 3 balusters(3) at stair balustrade at public hall, 2nd story

    Jun 7, 2021

    Closed — Violation closed
  • B

    Replace with new the missing wood baluster( 1)at balustrade at public hall stairs, 4th story

    Jun 7, 2021

    Closed — Violation closed
  • C

    Repair the leaky and/or defective faucets ,.at wash basin in the bathroom located at apt 8, 4th story, 1st apartment from south at west

    Jun 7, 2021 · Apt 8

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 8, 4th story, 1st apartment from south at west

    Jun 7, 2021 · Apt 8

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire stopping material at ceiling south at cellar

    May 4, 2021 · Apt BLDG

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall, west wall in the kitchen located at apt 8, 4th story, 1st apartment from south at west

    May 2, 2021 · Apt 8

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall in the 5th room from north located at apt 8, 4th story, 1st apartment from south at west

    May 2, 2021 · Apt 8

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from north located at apt 8, 4th story, 1st apartment from south at west

    May 2, 2021 · Apt 8

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north located at apt 8, 4th story, 1st apartment from south at west

    May 2, 2021 · Apt 8

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... approx 12 sq ft at the south wall and west wall in the 5th room from north located at apt 8, 4th story, 1st apartment from south at west

    May 2, 2021 · Apt 8

    Open — First no access to re- inspect violation

DOB building violations · 24

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 18, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
Show 14 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - active

ECB violations · 6

  • Class - 2

    At time of inspection observed front entry door no closing properly., repair and/or replace

    May 1, 2023

    Resolve
  • Class - 2

    Unapproved/unsafe/unsuitable electrical,equipment,apparatus,materials,devices,appliances or wiring in use. the use of bx armour cable in a wet location on the outside front of the bldg. rem: comply w/ ec code.

    Apr 26, 2018 · Penalty $400

    Resolve
  • Class - 1

    Reissue#35322306m failure to maintain bldg walls or appurtenances. noted: at front side(right)yellow sign fabric ripped off & exposing electrical & framing to the elements. remedy: maintain exterior walls.

    Apr 18, 2018 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to maintain bldg walls or appurtenances. noted: observed 1 sign fabric ripped off & exposing electrical & framing to the elements. remedy: maintain exterior wall.

    Mar 10, 2018 · Penalty $625

    Resolve
  • Class - 2

    Work w/o permit. noted: at time of inspection 2 signs one(ots tax services)12'wide x 5'height also another sign w/the fabris ripped off. remedy: obtain all required permit.

    Jan 23, 2018 · Penalty $800

    Resolve
  • Class - 1

    Failure to maintain bldg wall or appurtenances. noted: at time of inspection 1 sign fabric ripped off & exposing electrical & framing to toe elements. remedy: maintain exterior bldg walls.

    Jan 23, 2018 · Penalty $1,000

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 17, 2026 · Apt BLDG

    Close
  • Electric

    No lighting

    Oct 17, 2026 · Apt BLDG

    Open
  • Electric

    No lighting

    May 22, 2026 · Apt 4

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 22, 2026 · Apt 4

    Close
  • Plumbing

    Water supply

    May 22, 2026 · Apt 4

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 21, 2026 · Apt BLDG

    Close
  • Electric

    No lighting

    May 21, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    May 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 20, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Plumbing

    Water supply

    Mar 11, 2026 · Apt 4

    Close
  • Plumbing

    Radiator

    Mar 11, 2026 · Apt 4

    Close
  • Water leak

    Heavy flow

    Feb 2, 2026 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Feb 2, 2026 · Apt 3

    Close
  • Plumbing

    Radiator

    Feb 2, 2026 · Apt 3

    Close
  • Paint/plaster

    Radiator

    Feb 2, 2026 · Apt 3

    Close
  • Paint/plaster

    Cabinet

    Feb 2, 2026 · Apt 3

    Close
  • Paint/plaster

    Wall

    Feb 2, 2026 · Apt 3

    Close
  • Water leak

    Slow leak

    Feb 2, 2026 · Apt 3

    Close
  • Heat/hot water

    Entire building

    Jan 12, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 26, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2024 · Apt BLDG

    Close
  • Water leak

    Slow leak

    Jul 29, 2024 · Apt 3

    Close
  • Water leak

    Heavy flow

    Jul 21, 2024 · Apt 3

    Close
  • General

    Signage missing

    Jan 25, 2024 · Apt BLDG

    Close
  • Door/window

    Door

    Aug 10, 2023 · Apt 8

    Close
  • Unsanitary condition

    Pests

    Mar 1, 2023 · Apt 7

    Close
  • Paint/plaster

    Wall

    Feb 25, 2023 · Apt 4

    Close
  • Unsanitary condition

    Pests

    Feb 25, 2023 · Apt 4

    Close
  • Unsanitary condition

    Pests

    Feb 9, 2023 · Apt 6

    Close
  • Door/window

    Door

    Feb 9, 2023 · Apt BLDG

    Close
  • Safety

    Fire escape

    Feb 9, 2023 · Apt BLDG

    Close
  • Safety

    Carbon monoxide detector

    Feb 9, 2023 · Apt 7

    Close
  • Safety

    Smoke detector

    Feb 9, 2023 · Apt 7

    Close
  • Appliance

    Electric/gas range

    Feb 9, 2023 · Apt 6

    Close
  • Plumbing

    Toilet

    Feb 9, 2023 · Apt 6

    Close
  • Safety

    Fire escape

    Feb 9, 2023 · Apt 8

    Close
  • Unsanitary condition

    Pests

    Feb 9, 2023 · Apt 6

    Close
  • Door/window

    Door

    Feb 9, 2023 · Apt 6

    Close
  • Electric

    Lighting

    Feb 9, 2023 · Apt 6

    Close
  • Plumbing

    Radiator

    Feb 9, 2023 · Apt 6

    Close
  • Safety

    Window guard broken/missing

    Feb 9, 2023 · Apt 6

    Close
  • Plumbing

    Basin/sink

    Feb 9, 2023 · Apt 8

    Close
  • Unsanitary condition

    Pests

    Feb 9, 2023 · Apt 8

    Close
  • Unsanitary condition

    Pests

    Jan 30, 2023 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Jan 30, 2023 · Apt 3

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Aug 12, 2022 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2022 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Jun 14, 2022 · Apt 6

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1925
Floors
4
Residential units
8
Building area
7,600 ft²
Lot area
2,542 ft²
Zoning
R6
Community board
308
Council district
35
Block / lot
1384 / 15
Assessed value
$510,750
Landmark / historic district
No

HPD registration #300295, last renewed Sep 3, 2025.

Questions about 1366 St Johns Place

Who owns 1366 St Johns Place?

The owner of record in NYC Department of City Planning PLUTO data is St. Johns Holdings 2015 LLC.

Does 1366 St Johns Place have violations?

Yes. NYC HPD has recorded 346 housing violations at this property.

Is 1366 St Johns Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1366 St Johns Place built?

City records list 1925 as the year it was built.

How many apartments are in 1366 St Johns Place?

It has 8 residential units and 10 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.