1552 Bergen Street
Brooklyn, NY 11213BBL 3-01354-0030Map
Owner of record: Concern Bergen Housing Development Fund Corp.
1552 Bergen Street is an elevator apartment building built in 2015 in Brooklyn, 11213. It has 35 residential units across 7 floors. The owner of record is Concern Bergen Housing Development Fund Corp.. HPD has recorded 14 housing violations here, most recently on February 25, 2026. 1 of the 14 most recent violations are still open.
- HPD violations
- 14
- DOB violations
- 11
- ECB violations
- 11
- HPD complaints
- 48
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at refused room door at public hall, 7th story
Feb 25, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at stairway b at public hall, 3rd story
Feb 25, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective calking around bathtub in the bathroom located at apt 2k, 2nd story, 1st apartment from west at north
May 21, 2024 · Apt 2K
Open — Nov sent out - ANon-hazardous
Provide a safe and adequate supply of electric service to the fixtures at south wall at public hall, 2nd story
Feb 10, 2024
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective fire retatrdant material at the ceiling at public hall, 7th story, section at east
Jul 14, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at the ceiling at public hall, 7th story, section at east
Jul 14, 2023
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6; wg to replace = 0; wg to repair = 0; located at apt 3p, 3rd story, 5th apartment from west at north
Jun 27, 2022 · Apt 3P
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance lower sash window at north wall in the 1st room from east located at apt 2k, 2nd story, 1st apartment from west at north
Oct 7, 2021 · Apt 2K
Closed — Violation closed - CImmediately hazardous
Replace with new the missing glass pane in upper sash at 1st window from west at north in the 1st room from north at east located at apt 2k, 2nd story, 1st apartment from west at north
Aug 20, 2020 · Apt 2K
Closed — Violation closed - BHazardous
Properly repair the broken or defective window frame at 2nd window from west at north in the 1st room from north at east located at apt 2k, 2nd story, 1st apartment from west at north
Aug 20, 2020 · Apt 2K
Closed — Violation closed
Show 4 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4k, 4th story, 1st apartment from west at north
Dec 4, 2019 · Apt 4K
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked in boiler room at cellar
Dec 4, 2019
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7j, 7th story, 6th apartment from east at south , section at west
Sep 13, 2019 · Apt 7J
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 6g, 6th story, 4th apartment from east at south
Mar 14, 2019 · Apt 6G
Closed — Violation closed
DOB building violations · 11
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2020
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 29, 2016
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 11
- Class - 1
Failure to safeguard all persons and property affected by constructionoperations note: at the time of my inspection of a 7story building at bulkhead level.i observed that there were no overhead protection provi
Apr 7, 2016 · Penalty $2,400
Resolve - Class - 1
Bc3314.4.4.5 dislodgement. note: at the time of my inspection of a 7 story bldg t bulkhad level.i observed a four point suspended scaffold at exp4 consume with materials of bucket, mixing pan,foam and bricks
Apr 7, 2016 · Penalty $400
Resolve - Class - 2
Bc3307.4. warning signs,personnel and barriers. note: at the time of my inspection of a 7story bldg at bulkhead level.i observed two 30 yarddumpster being store on roadway at exp1, i also observed that there we
Apr 7, 2016
Resolve - Class - 1
1rcny 48 failure to adequate supervise work at a construction site,so as to maintain a safe construction site and ensure compliance with approved construction documents and chapter 33 (safeguards during constru
Apr 7, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety equipment measures and temporary construction-no guardrails.note at the time of my inspection of a 7story building at bulkhead level, i observed that there were no guardrail
Apr 7, 2016 · Penalty $1,200
Resolve - Class - 1
Bc3309.10 protection of roof. note: at the time of my inspection of a 7story bldg at bulkhead level.i observed that there was inadequate roof protection provided in the form of plywood and plastic and 8'from
Apr 7, 2016 · Penalty $1,600
Resolve - Class - 2
3303.3failure to post dot permit.upon inspec.observed job site fence erected partially occupying the sidewalk.also noted the dot permit posted for occupying hte sidewalk has been expired on 03/31/14.remedy:post
Jun 6, 2014 · Penalty $830
Resolve - Class - 1
Failure to maintain exterior bldg wall or appurtenances noted at exterior parapet wall is leaning and bulging brick work is cracked and thinning mortar joints thruout entire facade complete deterioration of
Dec 1, 2008 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg interior haz in code compliant manner noted at cellar level north east section partial collapse of rotted fl joist 30x30 section causing the fls at the 1st and 2nd fl to lean partial
Dec 1, 2008 · Penalty $1,000
Resolve - Class - 1
Work w.o permit. noted: the installation of new floor joists at the 1st & 2nd flrs throughout to try to correct the existing conditions charred floor joists (sistering of joists new to old) also metal work supp
Dec 1, 2008 · Penalty $1,600
Resolve
Show 1 more ↓
- Non-hazardous
Failure to maintain building exterior defect is broken header bean at center under skyligh rotted and defective roofing at various locationsthroughout remedy make all necessary repairs
Feb 11, 1997
Resolve
Complaints
- Plumbing
Basin/sink
Aug 18, 2026 · Apt 3N
Close - General
Ventilation system
Jun 11, 2026 · Apt 2K
Close - Appliance
Refrigerator
Mar 31, 2026 · Apt 2K
Close - Safety
Window guard broken/missing
Mar 31, 2026 · Apt 2K
Close - Plumbing
Basin/sink
Mar 31, 2026 · Apt 2K
Close - Appliance
Electric/gas range
Mar 31, 2026 · Apt 2K
Close - Heat/hot water
Entire building
Jun 27, 2025 · Apt BLDG
Close - Plumbing
Bathtub/shower
May 17, 2024 · Apt 2K
Close - Paint/plaster
Wall
May 17, 2024 · Apt 2K
Close - Plumbing
Bathtub/shower
Feb 6, 2024 · Apt 2K
Close
Show 38 more ↓
- Paint/plaster
Wall
Feb 6, 2024 · Apt 2K
Close - Electric
No lighting
Jan 27, 2024 · Apt 2K
Close - Unsanitary condition
Mold
Jan 19, 2024 · Apt 30
Close - Plumbing
Bathtub/shower
Jan 12, 2024 · Apt 4O
Close - Paint/plaster
Ceiling
Jan 12, 2024 · Apt 4O
Close - Appliance
Electric/gas range
Jan 12, 2024 · Apt 4O
Close - Water leak
Heavy flow
Sep 25, 2023 · Apt 3RDFLO
Close - Unsanitary condition
Mold
Sep 25, 2023 · Apt 3RDFLO
Close - Paint/plaster
Wall
Sep 25, 2023 · Apt 3RDFLO
Close - Appliance
Electric/gas range
Jun 26, 2023 · Apt 6T
Close - Appliance
Electric/gas range
Jun 9, 2023 · Apt 6T
Close - General
Ventilation system
Jun 9, 2023 · Apt 6T
Close - Appliance
Refrigerator
May 23, 2023 · Apt 2K
Close - Door/window
Door
May 23, 2023 · Apt 2K
Close - Appliance
Refrigerator
May 23, 2023 · Apt 2K
Close - Appliance
Electric/gas range
May 3, 2022 · Apt 6S
Close - Heat/hot water
Entire building
Apr 11, 2021 · Apt 5M
Close - Heat/hot water
Entire building
Oct 19, 2020 · Apt 2K
Close - Door/window
Window frame
Oct 19, 2020 · Apt 2K
Close - Door/window
Window frame
Aug 16, 2020 · Apt 2K
Close - Door/window
Window pane
Aug 13, 2020 · Apt 2K
Close - Heat/hot water
Entire building
Mar 17, 2020 · Apt 4E
Close - Heat/hot water
Entire building
Feb 3, 2020 · Apt 2F
Close - Heat/hot water
Entire building
Feb 1, 2020 · Apt 3G
Close - Heat/hot water
Entire building
Dec 20, 2019 · Apt 3N
Close - Heat/hot water
Entire building
Dec 4, 2019 · Apt 3G
Close - Heat/hot water
Apartment only
Dec 2, 2019 · Apt 4K
Close - Heat/hot water
Entire building
Nov 16, 2019 · Apt A
Close - Heat/hot water
Apartment only
Oct 17, 2019 · Apt 2A
Close - Heat/hot water
Apartment only
Sep 17, 2019 · Apt 7J
Close - Heat/hot water
Apartment only
Sep 13, 2019 · Apt 7J
Close - General
Ventilation system
Aug 12, 2019 · Apt 6F
Close - Appliance
Electric/gas range
Mar 12, 2019 · Apt 6G
Close - Plumbing
Water supply
Jun 7, 2018 · Apt 5P
Close - Heat/hot water
Apartment only
Nov 20, 2017 · Apt 2N2P
Close - Heat/hot water
Apartment only
Oct 30, 2017 · Apt 2N
Close - Heat/hot water
Apartment only
Oct 30, 2017 · Apt 2N
Close - Heat/hot water
Apartment only
Feb 26, 2017 · Apt 6N
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2015
- Floors
- 7
- Residential units
- 35
- Building area
- 57,081 ft²
- Lot area
- 25,730 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 36
- Block / lot
- 1354 / 30
- Assessed value
- $4,468,500
- Landmark / historic district
- No
HPD registration #386817, last renewed Jul 10, 2025.
Questions about 1552 Bergen Street
Who owns 1552 Bergen Street?
The owner of record in NYC Department of City Planning PLUTO data is Concern Bergen Housing Development Fund Corp..
Does 1552 Bergen Street have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 1552 Bergen Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1552 Bergen Street built?
City records list 2015 as the year it was built.
How many apartments are in 1552 Bergen Street?
It has 35 residential units and 36 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.