Violations at 193 Albany Avenue
Brooklyn, NY 11213 · BBL 3-01352-0080 · Back to the property
HPD housing violations
25 HPD violations, newest first.
- BHazardous
Remove the torn and/or loose floor covering .. in the entire apartment located at apt 6b, 6th story, 5th apartment from east at south
Jun 24, 2013 · Apt 6B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east at south, the 1st room from east, the bathroom , the foyer located at apt 3a, 3rd story, 3rd apartment from south at west
Aug 11, 2011 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation , ceiling in the 1st kitchen located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , east wall, ceiling in the 2nd kitchen located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation , 1st window frame from south at west wall, 2nd riser from south at west wall, 1st riser from south at west wall, 1st radiator from south at west wall, 1st door frame from north at east wall in the 4th room from north at west located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , west wall, east wall, south wall, north wall, ceiling in the 4th room from north at west located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation , 1st window frame from north at east wall, 2nd riser from north at east wall, 1st riser from north at east wall, 1st door frame from south at west wall in the 4th room from north at east located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , west wall, east wall, south wall, north wall, ceiling in the 4th room from north at east located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation , 1st door frame from west at north wall, 1st window frame from north at east wall, 1st window frame from east at south wall, 2nd riser from east at south wall, 1st riser from east at south wall, 1st radiator from east at south wall in the 5th room from north at east located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation , west wall, east wall, south wall, north wall, ceiling in the 5th room from north at east located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , west wall, east wall, south wall, north wall, ceiling in the 5th room from north at east located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation , 1st window frame from south at west wall, 1st window frame from east at south wall, 2nd riser from east at south wall, 1st riser from east at south wall, 1st radiator from east at south wall, 1st door frame from west at north wall in the 5th room from north at west located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , west wall, east wall, south wall, north wall, 2nd riser from east at south wall, ceiling in the 5th room from north at west located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation , 1st window frame from east at south wall, 2nd riser from south at west wall, 1st riser from south at west wall, 1st radiator from east at south wall in the 1st room from north at west located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , west wall, east wall, south wall, north wall, ceiling in the 1st room from north at west located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation , 2nd riser from north at east wall, 1st riser from north at east wall, 1st radiator from east at south wall in the 1st room from north at east located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , 1st window frame from east at south wall, east wall, south wall, north wall, ceiling in the 1st room from north at east located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , west wall, east wall, ceiling in the 2nd private hallway located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , east wall, ceiling in the 1st private hallway located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , west wall, east wall in the private hallway located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , west wall, east wall in the 2nd foyer located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation , 2nd riser from east at south wall, 1st riser from east at south wall, 1st door frame from south at west wall in the 1st bathroom located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , west wall, north wall in the 1st bathroom located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation , 2nd riser from east at south wall, 1st riser from east at south wall, 1st door frame from north at east wall in the 2nd bathroom located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , east wall, south wall, ceiling in the 2nd bathroom located at apt 12j, 12th story, 1st apartment from east at south
Jan 29, 2005 · Apt 12J
Open — Nov sent out
DOB building violations
The newest 50 of 57 DOB violations. The city keeps the complete history.
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2023
Jun 23, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - active - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - active - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - active - Construction other optional
C-construction other optional
May 31, 2016
Dob violation - dismissed - Construction other optional
C-construction other optional
May 31, 2016
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Dec 30, 2015
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Dec 23, 2015
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Dec 23, 2015
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Dec 23, 2015
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Dec 23, 2015
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Dec 23, 2015
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed
ECB violations
18 ECB violations, newest first.
- Class - 1
Failure to maintain bldg exterior facade and appurtenances.-note: at time of inspection, i observed at exp #2 north-cracked/broken window panes at both 10th fl and 7 fl windows.-exp #3 east: cracked/broken wind
Nov 3, 2025 · Penalty $5,000
Active - Class - 1
Failure to maintain bldg exterior facade and appurtenances.-note: at time of inspection i observed exp #2 north-broken window glass at 10fl window.-exp #4 south-objects(plants) on the windowsill of 14fl window
Aug 18, 2025 · Penalty $5,000
Active - Class - 2
Reissue35486720z dateofissue3/3/20 exit door not selfclosing properly noted@claasrm3&4 each rm 1exit door not selfclosing properly@time of insp when tested.repair/replace door.
Mar 9, 2021 · Penalty $1,562
Resolve - Class - 2
Reissue35486721k dateofissue3/3/20 failure to maintain bldg in codecompliant manner illumination for exits,exit discharges&public corridors per bc1006.1;27-381.noted@classrm2 1place 2existing emergency lights a
Mar 9, 2021 · Penalty $1,562
Resolve - Class - 2
Failure to maintain building in code compliant manner. illumination for exits,exit discharges and public corridors per bc 1006.1/27-381. noted:at classroom 2 and main entrance emergency lights non operational w
Mar 3, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code compliant manner. noted: at classroom 3 exit door in disrepair racked. remedy: repair and/or replace
Mar 3, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code-compliant manner. illumination for exit, exit discharges and public corridors per bc 1006.1; 27-381. noted: in various classroom and corridors emergency lights not working.
Apr 10, 2018
Resolve - Class - 2
59j01,100m07,14h11,17h11. 59j-adjust left pad/air gap; 100m-in case of fire signage; 17m-where needed.
Feb 14, 2017
Resolve - Class - 2
Exit door not self-closing. noted: exterior doors not self-closing, difficult to open located @ last classroom down the hall (right handside) behind the reception area. rem: repair or replace doors.
Aug 31, 2016
Resolve - Class - 1
Failure to take requred actions to secure public safety- unsafe facades. noted: on 12/23/15 qewi baris acar pe submitted a fisp 3: document to the dept declaring the facade as unsafe & requiring safety measures
Feb 13, 2016
Resolve - Class - 1
Failure to take required actions to secure public safety- unsafe facade. note: on 12/23/15 a qewi submitted a fisp 3: document to 'the dept'declaring facade as 'unsafe' thus requiring safety measures installed
Feb 13, 2016
Resolve - Class - 1
Failure to take required actions to secure public safety- unsafe facade. note: on 12/23/15 a qewi submitted a fisp 3: document to 'the dept'declaring facade a 'unsafe' thus requiring safety measures installed a
Feb 13, 2016
Resolve - Class - 1
Failure to take required actions to secure public safety- unsafe facade. noted: on 12/23/15 qewi baris acar submitted a fisp 3: not. of unsafe cond. form to the dept declaring facade 'unsafe' & requiring adequa
Feb 13, 2016
Resolve - Class - 1
Failure to provide safety measures (sidewalk shed) where required to protect & secure public from unsafe facade as per 1rcny 103-04 facade technical report file date 12/04/13.pe/ra.rem: provide safety measures
Sep 4, 2015
Resolve - Non-hazardous
B4a,18a,b,42,50a.50a-drain valve leaking.
Mar 11, 2008
Resolve - Non-hazardous
B4a,18a,b,25a,b,c,50a,42.50a-wiring exposed on oil burner.
Mar 11, 2008
Resolve - Non-hazardous
B4a,18a,18b,42,46c,50a.50a-drain valve leaking.50a-drain valve leaking.
Mar 11, 2008
Resolve - Non-hazardous
B4a,18a,b,50a,42.50a-drain valve leaking.
Mar 11, 2008
Resolve