1880 Pacific Street
Brooklyn, NY 11213BBL 3-01344-0001Map
Owner of record: NYC Housing Authority
1880 Pacific Street is an elevator apartment building built in 1950 in Brooklyn, 11213. It has 1,168 residential units across 6 floors. The owner of record is NYC Housing Authority. HPD has recorded 9 housing violations here, most recently on February 19, 2020. 9 of the 9 most recent violations are still open.
- HPD violations
- 9
- DOB violations
- 106
- ECB violations
- 109
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 9
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3d, 3rd story, 2nd apartment from east at south
Feb 19, 2020 · Apt 3D
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective mailboxes at east wall at public hall, 1st story
Aug 7, 2018
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings, in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west
Mar 2, 2008 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north and east wall, in the 1st room from north located at apt 2f, 2nd story, 1st apartment from south at west
Mar 2, 2008 · Apt 2F
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches, in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west
Mar 2, 2008 · Apt 2F
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice, in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west
Mar 2, 2008 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west
Mar 2, 2008 · Apt 2F
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of evidence of water leak at ceiling, in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west
Mar 2, 2008 · Apt 2F
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at south wall, in the kitchen located at apt 2f, 2nd story, 1st apartment from south at west
Mar 2, 2008 · Apt 2F
Open — Nov sent out
DOB building violations · 106
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active
ECB violations · 109
- Class - 1
Failure to provide required action to secure public safety at designated unsafe facade as per technical report unsafe-1009295-10a-001. noted: observed no adequate safety measures installed at all exposures. rem
Sep 16, 2026 · Penalty $10,000
Active - Class - 1
Failure to provide required action to secure public safety at designated unsafe facade as per technical report unsafe-1009297-10a-001. noted: observed no adequate safety measures installed at exp 1(w. elev), ex
Sep 16, 2026 · Penalty $10,000
Active - Class - 1
Failure to provide required action to secure public safety at designated unsafe facade as per technical report unsafe-1009304-10a-001. noted: observed no adequate protection at exp 2(s. elev) and exp 3(w. elev)
Sep 15, 2026 · Penalty $10,000
Active - Class - 2
Exit door not self-closing. at the time of inspection one of the door leaves for exit discharge door leading to playground was not self-closing and the other was not opening at all, repair/replace door
Mar 20, 2026 · Penalty $625
Active - Class - 3
Failure to maintain building & parts thereof in a code compliant manner: at time of inspection the shallow concrete storm water course was observed broken at the rear yard adjacent to 1886 pacific street and ca
May 15, 2023 · Penalty $500
Resolve - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #909297.remedy:submit acceptable required te
Dec 2, 2022 · Penalty $1,250
Active - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documeting condition of exterior wall & appurtenances required by 28-302.4 for control #909308.remedy:submit acceptable required tec
Dec 2, 2022 · Penalty $1,250
Active - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #909296.remedy:submit acceptable required te
Dec 2, 2022 · Penalty $1,250
Active - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #909298.remedy:submit acceptable required te
Dec 2, 2022 · Penalty $1,250
Active - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #909299.remedy:submit acceptable required te
Dec 2, 2022 · Penalty $1,250
Active
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1950
- Floors
- 6
- Residential units
- 1,168
- Building area
- 860,000 ft²
- Lot area
- 432,500 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 41
- Block / lot
- 1344 / 1
- Assessed value
- $21,302,550
- Landmark / historic district
- No
Questions about 1880 Pacific Street
Who owns 1880 Pacific Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.
Does 1880 Pacific Street have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 1880 Pacific Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1880 Pacific Street built?
City records list 1950 as the year it was built.
How many apartments are in 1880 Pacific Street?
It has 1,168 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.