360 Empire Boulevard
Brooklyn, NY 11225BBL 3-01316-0015Map
Owner of record: NYC Department Of Parks And Recreation
360 Empire Boulevard is a school building built in 1956 in Brooklyn, 11225. The owner of record is NYC Department Of Parks And Recreation. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 44
- ECB violations
- 67
- HPD complaints
- 25
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 44
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2017
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 18, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2008
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 14, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 15, 2007
Dob violation - resolved
Show 34 more ↓
- Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2003
Dob violation - dismissed - Elevator elevatorrequired
3s5314
Jan 27, 2003
Dob violation - resolved - Elevator elevatorrequired
3s5314
Mar 21, 2002
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 19, 2002
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 2001
Dob violation - dismissed - Elevator elevatorrequired
3s5314
Mar 24, 2000
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 10, 2000
Dob violation - dismissed - Elevator elevatorrequired
3s5314
Jul 15, 1999
Dob violation - resolved - Construction other optional
C-construction other optional
May 25, 1999
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Elevator elevatoroptional
1
Apr 7, 1992
Dob violation - dismissed - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed - Elevator elevatorrequired
51-restore elevator to service or file a bn and place out of active service dismantle or permanently discountinue remove
Dec 2, 1988
Dob violation - resolved
ECB violations · 67
- Class - 2
Reissue#35717264j failiure to maintain building in code-compliant manner corridor doors not self closing on all floors gym,auditorium,cafe and basement.rem:comply with code.
Jun 23, 2026 · Penalty $3,125
Active - Class - 2
Reissue#35717263h failure to maintain building in code-compliant manner.bulkhead has spalling,water damage.rem:comply with code.
Jun 23, 2026 · Penalty $3,125
Active - Class - 2
Reissue: 35682794j-failure to maintain building in code-compliant manner: bulkhead a, 2 and 6 3rd floor rm313a, has spalling. remedy: complywith code.
May 13, 2025 · Penalty $3,125
Active - Class - 2
Reissue: 35682793h-failure to maintain building in code-compliant manner; doors not self-closing at various locations, 3rd fl. corridors by 3-7, 324, 2nd fl. 207, 219, 202, 242 1st floor entrance. remedy: compl
May 13, 2025 · Penalty $3,125
Active - Class - 2
Reissue#35674952y failure to maintain building in code-compliant manner.at time of my inspection i observed at the roof level bulkhead#1a, 2and 6 and 3rd floor room the 323a has spalling paint/plaster full of w
Jun 13, 2024 · Penalty $1,562
Active - Class - 2
Reissue#35674953h failure to maintain building in code-compliant manner.at time of my inspection i observed at the 3rd floor corridors by 307,324 2nd floor corridors by 207,219 room 202,242 1st floor entrance t
Jun 13, 2024 · Penalty $1,562
Active - Class - 2
Reissue#35674955l failure to maintain building in code-compliant manner.illumination for exits,exit discharges and public corridors per bc 1006.1;27-381.at time of my inspection i observed at the auditorium ent
Jun 13, 2024 · Penalty $1,562
Resolve - Class - 2
Reissue#35643590x noted:at roof level bulkhead#1 & 2,5 & 6 and 3rd floor room#323a has spalling paint/plaster and water stairs in various areas throughout.rem:repair and/or replace.
Apr 11, 2023 · Penalty $1,562
Active - Class - 2
Exit door not self-closing.noted:the exterior door at exit 1,2,3,7,8 and main entrance to the building is not working properly.rem:repair/replace door.
Apr 11, 2023 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code compliant manner:illumination forexits,exit discharges and public corridors per bc 1006.1;27-381.noted:at the auditorium entrance,by exit 3 and basement by b40,the emergency
Apr 11, 2023 · Penalty $625
Resolve
Show 40 more ↓
- Class - 2
Reissue#35643589z noted:at 3rd floor corridor by 307,324,2nd floor corridor by 207,219,room 201,242,1st floor stair d,f,g,corridor by 107,gymnasium entrance,auditorium left and right stage,basement level cafete
Apr 11, 2023 · Penalty $1,562
Active - Class - 2
Re-issued#35582202z failure to maintain building in code-compliant manner. at time of inspection observed at roof level bulkhead 1&2 and 5&6(3rd fl) water penetration at rm#323a. damage ceilings,walls w/ spalli
Jun 6, 2022 · Penalty $1,562
Active - Class - 2
Re-issued#35582203k failure to maintain building in code-compliant manner. at time of inspection noted:2nd fl hallway door near rm#219 and 1st fl stair d,and also gym door are not working properly. remedy:repai
Jun 6, 2022 · Penalty $1,562
Active - Class - 2
Failure to maintain bldg in code compliant manner illumination for exits,exit discharges & public corridors per bc 1006.1/27-381. noted: at (1st fl)auditorium(basement)cafeteria emergency lights non operational
Jun 15, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: at(roof level)bulkhead 1&2(2nd fl)hallway door near rm 219(1st fl)stair d,exits 2,3,7,gym(basement)exit g by rm b10 doors are in disrepair/racked.
Jun 15, 2021 · Penalty $625
Active - Class - 2
Failure to maintain bldg in code compliant manner. noted: a(roof level)bulkheads 1&2/5&6(3rd fl)room 323a water penetration/damage to ceilings,walls w/spalling plaster/paint. remedy: repair &/or replace.
Jun 15, 2021 · Penalty $625
Active - Class - 2
Reissue ecb#35495537p exit door not self closing. noted: at(roof level)bulkhead 1&2(2nd fl)hallway door near rm 219(basement)exit 6 by rm b10 door checks are in disrepair/non operational when tested. remedy: re
Jun 15, 2021 · Penalty $1,562
Resolve - Class - 2
Exit door not self closing. noted: at the basement next to room b 10 the doors are not closing properly,the door is hitting on the door frame. remedy: repair/replace door.
May 15, 2020 · Penalty $625
Resolve - Class - 2
Reissue#35322542y failure to maintain bldg in code compliant. kitchen delivery entrance steps on empire blvd verticle & horizontal cracks & spalling visible trippoing hazard. remedy: comply w/code.
Jun 19, 2019
Resolve - Class - 2
Reissue #35260778j issued 5/11/17 failure to maintain bldg in code compliant manner. note: at inspection kitchen delivery entrance step on "empire blvd" side of bldg has vertical and diagonal cracks with spall
Apr 18, 2018
Resolve - Class - 2
Reissue#35216181z failure to maintain bldg walls or appurtenances(exterior)spalling concrete at the handicap accessible ramp & concrete steps at cafeteria delivery entrance. remedy: comply w/notice of violation
May 11, 2017
Resolve - Class - 2
Failure to maintain bldg in code compliant manner interior signs of water leak above windows in room 3134 and in room 315 spalling plaster. rmdy: repair and/or replace.
Oct 21, 2016
Resolve - Class - 2
Reissue 35128785n failure to maintain bldg walls or appurtenances (ex terior) spalling concrete at the handicap accessible ramp. rmdy: maintain exterior building.
Oct 21, 2016
Resolve - Class - 2
Failure to maintain building in code-compliant manner: no fire stopping. note: fire stopping missing at various locations on the walls and ceiling in the gas meter room. rmdy: comply w/nov.
Jul 31, 2015
Resolve - Class - 2
Failure to maintain building wall(s) or appurtenances. note: excessivespalling concrete at the handicap accessible ramp.rmdy: comply with the notice of violation.
Jul 31, 2015
Resolve - Class - 2
Exit door not self-closing.note: in the cafeteria 3 exit doors adjacent to exit 'c' are out of plumb and not self-closing. rmdy: comply w/nov.
Jul 31, 2015
Resolve - Class - 2
Roof has become porous & allowing rain water into room 322 (3rd fl) causing interior damages. remedy: water proof roof.
May 22, 2013
Resolve - Class - 2
Reissue: 34941453z exit doors at stair a&b (1st fl) & exit stair g (2nd fl) is missing. remedy: replace missing doors.
May 22, 2013
Resolve - Class - 2
Exterior roof bulkhead door at stair e&f is out of plumb. noted: door is hitting door frame & not closing properly. remedy: repair door.
May 22, 2013
Resolve - Class - 2
B254,4a,32a,42,50,50a,b,c,d,e. 50- fresh air fan not working. 50a- sail switch jumped out. 50b- missing manual reset l.w.c.o. 50c- pipe downrelief valve. 50d- debris in trailer. 50e- missing shut off valves on
Jun 14, 2012
Resolve - Class - 2
Interior exit doors at stair a & b on the 1st floor level is defective. note: doors are out of plumb and do not close properly. remedy: replace doors.
Feb 16, 2012
Resolve - Class - 2
Stair a & b on the 2nd flr level exit doors the door hinge is not fully attached causing door not to close fully.rem:repair &/or replace door hinge.
Jul 13, 2011
Resolve - Class - 2
Exterior steps into/exit # 3 & 4 have severe cracks & partially missing step.remedy:make safe! repair steps.
Apr 8, 2009
Resolve - Class - 2
Sec.bc1017.1 & 27-369. corridor width decreased by obstructions at 1flmain entrance security deck obstructing over 65 percent of exit passageway.remedy:remove all obstructions
Apr 8, 2009
Resolve - Hazardous
Re-issue # 34509720l. no firestopping provided around pipe penetrationlocated in the electrical room & gas meter room at basement level. remedy: provide firestopping around pipe penetration.
Mar 27, 2007
Resolve - Hazardous
There are no fire stop was provided in electrical rm #b21 in basement, and in gas meter room (around pipes) in basement. remedy: provide/ maintain fire stops.
Feb 13, 2006
Resolve - Hazardous
There are loose concrete blocks above the exit doors in lunch room by exit 1 and 2. remedy: repair/replace loose blocks.
Feb 13, 2006
Resolve - Hazardous
There are missing fire smoke stop door on 3rd fl (by rm 307) and 1st fl (by rm 107). remedy: replace fire smoke stop doors.
Feb 13, 2006
Resolve - Non-hazardous
Reissue 34412676.vertical and horizontal cracks and mortar/missing mortar on glazed block wall in gymnasium.remedy:repair masonry block wall.
Mar 16, 2005
Resolve - Non-hazardous
Steam penetration through floor into classroom #b81.remedy:stop steam penetration make all necesary repairs.
Mar 16, 2005
Resolve - Non-hazardous
Water penetration through exterior window frame next to handicap entrance and from main entrance corridor lobby.remedy:repair/stop water penetration at window.
Mar 16, 2005
Resolve - Non-hazardous
"reissure" failure to use panic hardware where required by law. note. cafeteria occupancy # 768 and no panic hardware install on east side exit doors. remedy: provide panic hardware.
Jan 14, 2004
Resolve - Non-hazardous
"reissure" faiilure to maintain. defects are. vertical and horizontal cracks approx 1' wide at various locations in gymnasium west side glazed block wall. remedy: repair wall
Jan 14, 2004
Resolve - Non-hazardous
Failure to maintain. defects are. large holes approx 3'x8' in plaster ceiling in basement corridor between room # b29 and b19. remedy: repair plaster ceilings.
Jan 14, 2004
Resolve - Non-hazardous
Use of illegal hardware note slide bolt with padlock installed on the following exit doors (1)basement and first floor rear exit #3,4 and 9 (2)front exit installed on auditorium east side exit door bolt and loc
Jan 14, 2004
Resolve - Non-hazardous
Failure to use panic hardware where required by local law. note. auditoirum occupancy # 500 and no panic hardware install on stage east side exit door. remedy: provide panic hardware.
Jan 14, 2004
Resolve - Non-hazardous
Failure to mainain defects are on 2 floor in room # 202 and 202a middle sheetrock partiton wall unfinish need taping. remedy; finish partition wall taping.
Jan 14, 2003
Resolve - Non-hazardous
Reissue failure to maintain defect is vertical and horizontal cracks approx 1 wide al various locations in gymnasium west side glazed block wall. remedy: repair wall.
Jan 14, 2003
Resolve - Non-hazardous
Failure to maintain defect is on 3 floor in room #322 s/e corner of ceiling and roof leaks. remedy; repair roof and ceiling.
Jan 14, 2003
Resolve - Non-hazardous
" reissue " failure to use panic hardware where required by law in cellar no panic hardware install on east side exit doors in cafeteria over 300 occupancy remedy : install panic hardware
Jan 14, 2003
Resolve
Complaints
- Plumbing
Water supply
Dec 5, 2024 · Apt 6
Close - Plumbing
Water supply
Dec 5, 2024 · Apt 6
Close - Unsanitary condition
Mold
Dec 5, 2024 · Apt 6
Close - Unsanitary condition
Pests
Dec 5, 2024 · Apt 6
Close - Plumbing
Radiator
Dec 5, 2024 · Apt 6
Close - Heat/hot water
Entire building
Dec 5, 2024 · Apt D5
Close - Plumbing
Water supply
Nov 1, 2014 · Apt 3A
Close - Nonconst
Vermin
Jan 17, 2012 · Apt 5E
Close - Paint/plaster
Wall
Jan 17, 2012 · Apt 5E
Close - Plumbing
Water-leaks
Jan 17, 2012 · Apt 5E
Close
Show 15 more ↓
- Paint/plaster
Wall
Jan 17, 2012 · Apt 5E
Close - General
Floor
Jan 17, 2012 · Apt 5E
Close - Paint/plaster
Wall
Jan 17, 2012 · Apt 5E
Close - Paint/plaster
Ceiling
Jan 17, 2012 · Apt 5E
Close - Paint/plaster
Wall
Jan 17, 2012 · Apt 5E
Close - General
Cabinet
Jan 17, 2012 · Apt 5E
Close - Nonconst
Vermin
Dec 12, 2011 · Apt 5E
Close - Paint/plaster
Wall
Dec 12, 2011 · Apt 5E
Close - General
Floor
Dec 12, 2011 · Apt 5E
Close - General
Cabinet
Dec 12, 2011 · Apt 5E
Close - Paint/plaster
Wall
Dec 12, 2011 · Apt 5E
Close - Plumbing
Water-leaks
Apr 5, 2010 · Apt 5E
Close - Plumbing
Water-leaks
Apr 5, 2010 · Apt 5E
Close - Plumbing
Water supply
Jul 1, 2008 · Apt 5E
Close - Heating
Heat related
Feb 5, 2007 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 1956
- Floors
- 3
- Residential units
- —
- Building area
- 149,945 ft²
- Lot area
- 111,200 ft²
- Zoning
- R7-1
- Community board
- 309
- Council district
- 40
- Block / lot
- 1316 / 15
- Assessed value
- $12,294,450
- Landmark / historic district
- No
Questions about 360 Empire Boulevard
Who owns 360 Empire Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Parks And Recreation.
Does 360 Empire Boulevard have violations?
NYC HPD has no housing violations on record for this property.
Is 360 Empire Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 360 Empire Boulevard built?
City records list 1956 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.