roofy

807 Nostrand Avenue

Brooklyn, NY 11225BBL 3-01269-0001Map

Owner of record: Harry Dewar Realty INC

807 Nostrand Avenue is a mixed residential and retail building built in 1920 in Brooklyn, 11225. It has 6 residential units across 4 floors. The owner of record is Harry Dewar Realty INC. HPD has recorded 653 housing violations here, most recently on June 8, 2026. 29 of the 50 most recent violations are still open.

HPD violations
653
DOB violations
18
ECB violations
7
HPD complaints
437

What to know

Concern
16 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jun 8, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 653

  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from west at north wall in the bathroom located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st dumb waiter from north at east wall in the kitchen located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall in the 1st private hallway located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, 1st closet from north at east wall door in the 4th room from east located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from north at east wall, south wall in the 5th room from east at north located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the 5th room from east at north located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, 1st window frame from south at west wall in the 5th room from east at south located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall, 1st closet from south at west wall ceiling, west wall, east wall in the 3rd room from east located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the 3rd room from east located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
Show 40 more ↓
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at west wall in the bathroom located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the foyer located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 8; wg to replace = 0; wg to repair = 0; located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, ceiling, 1st closet from north at east wall door frame, 1st closet from north at east wall wall, 1st door frame from west at north wall, north wall, south wall, west wall, 1st window frame from east at south wall in the 4th room from east located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from west at north wall door in the 5th room from east at north located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, 1st door frame from north at east wall, north wall, east wall, 1st window frame from south at west wall in the 5th room from east at north located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 5th room from east at south located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame, 1st closet from south at west wall wall, 1st door frame from west at north wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 3rd room from east located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the 2nd private hallway located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall, south wall, east wall, west wall, 1st window frame from east at south wall in the kitchen located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at east wall, ceiling, north wall, south wall, east wall, west wall, 1st window frame from west at north wall in the foyer located at apt 5, 4th story, 1st apartment from south at west

    Jun 8, 2026 · Apt 5

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 5, 4th story, 1st apartment from south at west

    Oct 21, 2025 · Apt 5

    Open — Not complied with
  • C

    Provide a safe and adequate supply of electric service to the fixtures at ceiling at cellar

    Oct 2, 2025

    Open — Not complied with
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Sep 6, 2025

    Open — Not complied with
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall

    Sep 6, 2025

    Open — Not complied with
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Sep 6, 2025

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall

    Sep 6, 2025

    Open — Not complied with
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 10, 2025

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective lower window sash in the bathroom located at apt 6, 4th story

    May 23, 2025 · Apt 6

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective lower window sash at the 1st window from north at the east wall in the 1st room from east at south located at apt 6, 4th story, 1st apartment from north at east

    May 23, 2025 · Apt 6

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective window frame at the window at the south wall in the 1st room from east at south located at apt 6, 4th story, 1st apartment from north at east

    May 23, 2025 · Apt 6

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 5, 5th story, 1st apartment from south at west

    Apr 28, 2025 · Apt 5

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective at basin sink in the bathroom located at apt 5, 5th story, 1st apartment from south at west

    Apr 28, 2025 · Apt 5

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective door frame in the entrance located at apt 5, 5th story, 1st apartment from south at west

    Apr 28, 2025 · Apt 5

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 3rd room from north located at apt 1, 2nd story, 1st apartment from south at west

    Apr 25, 2025 · Apt 1

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 1, 2nd story, 1st apartment from north at east

    Apr 25, 2025 · Apt 1

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west all by window in the bathroom located at apt 4, 3rd story, 1st apartment from west at north original violation 17834392 issued 14-apr-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Apr 14, 2025 · Apt 4

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west all by window in the bathroom located at apt 4, 3rd story, 1st apartment from west at north

    Apr 14, 2025 · Apt 4

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective spring balance at lower window sash at east wall in the 2nd room from north located at apt 4, 3rd story, 1st apartment from west at north

    Apr 14, 2025 · Apt 4

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the entire apartment located at apt 4, 3rd story, 1st apartment from west at north

    Apr 14, 2025 · Apt 4

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective wood floor by radiator in the 1st room from north located at apt 4, 3rd story, 1st apartment from west at north

    Apr 14, 2025 · Apt 4

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall by outlet in the 3rd room from north located at apt 4, 3rd story, 1st apartment from west at north

    Apr 14, 2025 · Apt 4

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective metal cornice at building front

    Feb 11, 2025

    Open — Not complied with
  • C

    Provide an adequate supply of heat for the apartment

    Feb 4, 2025

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 4th story, 1st apartment from south at west

    Jan 31, 2025 · Apt 5

    Closed — Violation closed
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 5, 4th story, 1st apartment from south at west

    Jan 31, 2025 · Apt 5

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 2nd story, 1st apartment from south at west

    Jan 29, 2025 · Apt 1

    Closed — Violation dismissed

DOB building violations · 18

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 15, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
Show 8 more ↓
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - active

ECB violations · 7

  • Class - 2

    Failure to file required annual boiler inspection reports for low-pressure boiler 30000038730y0001 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for

    Sep 27, 2024 · Penalty $312

    Active
  • Class - 1

    Unlawful act.failure to comply with order of commissioner.failure to correct and certify summons #35122945m electrical work without permit outdoor light fixture over front doorway.remedy:comply with code.

    Sep 29, 2021 · Penalty $6,250

    Resolve
  • Class - 1

    Unlawful act.failure to comply w/order of commissioner.failure to correct&certify summons35122945m comply w/code

    Jul 29, 2021 · Penalty $6,250

    Resolve
  • Class - 2

    Electrical work without permit. observed at 3:00pm (1) dis/sw installeed over meters in basement. no application on file for new electrical work. remedy: obtain permit.

    Mar 14, 2015 · Penalty $4,000

    Active
  • Class - 1

    Electrical work w/o permit. electrical wiring w/o permit for outside light fixture over front steps,prior to obtaining permit. remedy: obtain permit.

    Mar 12, 2015 · Penalty $800

    Active
  • Class - 2

    Sec. 358.0 prohibited use of electrical metallic tubing (emt). emt used outdoors for wiinrg of lighting fixture over front steps. emt used in wet location not permitted. remedy: comply w/ec code.

    Mar 12, 2015 · Penalty $250

    Resolve
  • Class - 3

    B354,15,16,32a,50a,b,c,d. 50a- check valve on feed water line missing.50b- fresh air intake need 12 x 12 louva. 50c- remove (waste) oil fromboiler room. 50d- boiler room not a storage room.

    Jan 24, 2011

    Resolve

Complaints

  • Paint/plaster

    Ceiling

    Jun 4, 2026 · Apt 5

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2026 · Apt 5

    Close
  • Heat/hot water

    Apartment only

    Jan 28, 2026 · Apt 5

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 31, 2025 · Apt BLDG

    Close
  • Water leak

    Slow leak

    Oct 13, 2025 · Apt 5

    Close
  • Door/window

    Window frame

    May 9, 2025 · Apt 6

    Close
  • Paint/plaster

    Wall

    May 9, 2025 · Apt 6

    Close
  • Door/window

    Window frame

    May 9, 2025 · Apt 6

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Apr 24, 2025 · Apt 5

    Close
  • Unsanitary condition

    Mold

    Apr 24, 2025 · Apt 5

    Close
  • Water leak

    Slow leak

    Apr 24, 2025 · Apt 5

    Close
  • Flooring/stairs

    Floor

    Apr 24, 2025 · Apt 5

    Close
  • Plumbing

    Basin/sink

    Apr 24, 2025 · Apt 5

    Close
  • Paint/plaster

    Wall

    Apr 18, 2025 · Apt 1

    Close
  • Electric

    Outlet/switch

    Apr 18, 2025 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Apr 18, 2025 · Apt 1

    Close
  • Water leak

    Slow leak

    Apr 7, 2025 · Apt 2

    Close
  • Electric

    Lighting

    Apr 7, 2025 · Apt 2

    Close
  • Paint/plaster

    Wall

    Apr 7, 2025 · Apt 2

    Close
  • Paint/plaster

    Wall

    Apr 7, 2025 · Apt 2

    Close
  • Electric

    Outlet/switch

    Apr 7, 2025 · Apt 4

    Close
  • Paint/plaster

    Wall

    Apr 7, 2025 · Apt 4

    Close
  • Door/window

    Window frame

    Apr 7, 2025 · Apt 4

    Close
  • Unsanitary condition

    Mold

    Apr 7, 2025 · Apt 4

    Close
  • Flooring/stairs

    Floor

    Apr 7, 2025 · Apt 4

    Close
  • Heat/hot water

    Apartment only

    Feb 24, 2025 · Apt 5

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2025 · Apt 6

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2025 · Apt 5

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2025 · Apt 5

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2025 · Apt 5

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2025 · Apt 5

    Close
  • Paint/plaster

    Window/frame

    Jan 27, 2025 · Apt 5

    Close
  • Plumbing

    Water supply

    Jan 27, 2025 · Apt 5

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2025 · Apt 6

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2025 · Apt 5

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2025 · Apt 5

    Close
  • Heat/hot water

    Entire building

    Jan 23, 2025 · Apt 5

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2025 · Apt 5

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2025 · Apt 5

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2025 · Apt 1

    Close
  • Water leak

    Slow leak

    Jan 16, 2025 · Apt 1

    Close
  • Outside building

    Roofing

    Jan 16, 2025 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jan 16, 2025 · Apt 1

    Close
  • General

    Bell/buzzer/intercom

    Jan 16, 2025 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Jan 16, 2025 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jan 16, 2025 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S9)
Year built
1920
Floors
4
Residential units
6
Building area
8,064 ft²
Lot area
2,225 ft²
Zoning
R6
Community board
309
Council district
35
Block / lot
1269 / 1
Assessed value
$950,400
Landmark / historic district
No

HPD registration #353263, last renewed Aug 20, 2025.

Questions about 807 Nostrand Avenue

Who owns 807 Nostrand Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Harry Dewar Realty INC.

Does 807 Nostrand Avenue have violations?

Yes. NYC HPD has recorded 653 housing violations at this property.

Is 807 Nostrand Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 807 Nostrand Avenue built?

City records list 1920 as the year it was built.

How many apartments are in 807 Nostrand Avenue?

It has 6 residential units and 10 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.