851 Lincoln Place
Brooklyn, NY 11216BBL 3-01255-0051Map
Owner of record: Lincoln Holdings NY LLC
851 Lincoln Place is a walk-up apartment building built in 1899 in Brooklyn, 11216. It has 4 residential units across 3 floors. The owner of record is Lincoln Holdings NY LLC. HPD has recorded 153 housing violations here, most recently on May 5, 2026. 17 of the 50 most recent violations are still open.
- HPD violations
- 153
- DOB violations
- 0
- ECB violations
- 2
- HPD complaints
- 178
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 153
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from north located at apt 2, 1st story, 1st apartment from north at east
Dec 9, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door leading to the boiler room at cellar at boiler room
Dec 9, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2, 1st story, 1st apartment from north at east
Dec 9, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Dec 9, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Dec 9, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box that is missing at public hall, 1st story
Dec 9, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Dec 9, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Dec 9, 2024
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system that is missing at public hall, 1st story
Dec 9, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Dec 9, 2024
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the 2nd room from north located at apt 1, 1st apartment from south at west
Nov 28, 2024 · Apt 1
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 10, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 23, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 9, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 25, 2022
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2021
Closed — Violation dismissed - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood and plaster board partitians erected at 1st, and 3rd sty, approx.3' floor area now utilized by the, apartment units at public hall stairs
May 20, 2015
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of sprinkler heads and water supply lines no longer located over the primary egressn at 3rd and 1st sty, at public hall stairs
May 20, 2015
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 23, 2015
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective glass pane at 3rd from east at south window upper sash in the kitchen located at apt 3, 2nd story, 1st apartment from north at east
Aug 1, 2014 · Apt 3
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective concrete stair 1st from top to bottom at front areaway, 1st story
Aug 1, 2014
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening key operated lock at door leading to room with fire escape window in the 2nd room from north located at apt 3, 2nd story, 1st apartment from north at east
Aug 1, 2014 · Apt 3
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east
Aug 1, 2014 · Apt 3
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east
Aug 1, 2014 · Apt 3
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3, 2nd story, 1st apartment from north at east
Aug 1, 2014 · Apt 3
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3, 2nd story, 1st apartment from north at east
Aug 1, 2014 · Apt 3
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3, 2nd story, 1st apartment from north at east
Aug 1, 2014 · Apt 3
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3, 2nd story, 1st apartment from north at east
Aug 1, 2014 · Apt 3
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east
Aug 1, 2014 · Apt 3
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardent ceiling throughout at cellar
Jul 16, 2014
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak cascading water leaking from above the ceiling at cellar
Jul 16, 2014
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls throughout in the bathroom located at apt 2fl, 2nd story
Jul 16, 2014 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak coming from above the ceiling in the bathroom located at apt 2fl, 2nd story
Jul 16, 2014 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color plaster board ceiling in the kitchen located at apt 2fl, 2nd story
Jul 16, 2014 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak from above the ceiling in the kitchen located at apt 2fl, 2nd story
Jul 16, 2014 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Repair the leaky and/or defective faucets cascading from the hot and cold water taps when in use,at the sink in the kitchen located at apt 2fl, 2nd story
Jul 16, 2014 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at rear wall at cellar
May 20, 2014
Closed — Violation closed - CImmediately hazardous
Cleanse and disinfect to the satisfaction of this department after removing the stagnant water and debris inside and near boiler room at cellar
May 20, 2014
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective boiler at boiler room
May 20, 2014
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2014 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2014 · Apt 2
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2014 · Apt 2
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Apr 25, 2014 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1b, 1st apartment from west at north
May 2, 2013 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1b, 1st apartment from west at north
May 2, 2013 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective connection at washbasin in the bathroom located at apt 1b, 1st apartment from west at north
May 2, 2013 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Remove all obstructions and repair all defects in at bathtub in the bathroom located at apt 1b, 1st apartment from west at north
May 2, 2013 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all stories
Feb 7, 2013
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 2
- Class - 3
Failure to maintain bldg in code compliant manner. defect noted: at rear yard accumulation of construction debris consisting of ceramic toilets.curboard,metal studs,pieces of wood,plywood panels,black garage
May 9, 2015 · Penalty $100
Resolve - Class - 2
Failure to maintain bldg in complaint manner defects noted extersion front stairway is pulling away from side walls remedy: repair &/or re place
Jul 14, 2008 · Penalty $2,500
Active
Complaints
- Heat/hot water
Entire building
Jan 21, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 6, 2024 · Apt 1
Close - Flooring/stairs
Floor
Nov 26, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Nov 26, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Nov 22, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Nov 13, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Oct 27, 2024 · Apt 1
Close - General
Bell/buzzer/intercom
Aug 29, 2018 · Apt BLDG
Close - Paint/plaster
Wall
Aug 29, 2018 · Apt BLDG
Close - Door/window
Door
Aug 29, 2018 · Apt 2
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Nov 18, 2017 · Apt 1
Close - Water leak
Heavy flow
Nov 18, 2017 · Apt 1
Close - Heat/hot water
Entire building
Feb 6, 2016 · Apt 1
Close - Electric
Power outage
Feb 6, 2016 · Apt 1
Close - Electric
Power outage
Feb 6, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2015 · Apt 4
Close - Heat/hot water
Entire building
Feb 21, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2015 · Apt 4
Close - Heat/hot water
Apartment only
Feb 17, 2015 · Apt 4
Close - Heat/hot water
Entire building
Jan 10, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 28, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2014 · Apt BLDG
Close - Plumbing
Toilet
Nov 3, 2014 · Apt 1B
Close - Plumbing
Bathtub/shower
Nov 3, 2014 · Apt 1B
Close - Paint/plaster
Ceiling
Jul 9, 2014 · Apt 3
Close - Water leak
Heavy flow
Jul 9, 2014 · Apt 3
Close - Heat/hot water
Entire building
Jul 9, 2014 · Apt 3
Close - Water leak
Slow leak
Jul 9, 2014 · Apt 3
Close - Plumbing
Basin/sink
Jul 9, 2014 · Apt 3
Close - Paint/plaster
Ceiling
Jul 9, 2014 · Apt 3
Close - Heat/hot water
Entire building
Jun 4, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 4, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
May 27, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
May 15, 2014 · Apt BLDG
Close - Water leak
Slow leak
Mar 27, 2014 · Apt 2
Close - Paint/plaster
Ceiling
Mar 27, 2014 · Apt 2
Close - Water leak
Slow leak
Mar 27, 2014 · Apt 2
Close - Paint/plaster
Ceiling
Mar 27, 2014 · Apt 2
Close - Water leak
Slow leak
Mar 25, 2014 · Apt 2
Close - Paint/plaster
Ceiling
Mar 25, 2014 · Apt 2
Close - Plumbing
Toilet
Apr 19, 2013 · Apt 1B
Close - Paint/plaster
Ceiling
Apr 19, 2013 · Apt 1B
Close - Plumbing
Basin/sink
Apr 19, 2013 · Apt 1B
Close - General
Floor
Apr 19, 2013 · Apt 1B
Close - Plumbing
Bathtub/shower
Apr 19, 2013 · Apt 1B
Close - General
Stairs
Apr 10, 2013 · Apt 4
Close - Heating
Heat related
Feb 11, 2013 · Apt 4
Close - Heating
Heat related
Feb 10, 2013 · Apt 2
Close - Heating
Heat related
Feb 6, 2013 · Apt NA
Close - Heating
Heat related
Feb 4, 2013 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1899
- Floors
- 3
- Residential units
- 4
- Building area
- 3,288 ft²
- Lot area
- 2,235 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 35
- Block / lot
- 1255 / 51
- Assessed value
- $488,700
- Landmark / historic district
- Crown Heights North II Historic District
HPD registration #355370, last renewed Oct 1, 2025.
Questions about 851 Lincoln Place
Who owns 851 Lincoln Place?
The owner of record in NYC Department of City Planning PLUTO data is Lincoln Holdings NY LLC.
Does 851 Lincoln Place have violations?
Yes. NYC HPD has recorded 153 housing violations at this property.
Is 851 Lincoln Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 851 Lincoln Place built?
City records list 1899 as the year it was built.
How many apartments are in 851 Lincoln Place?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.