Violations at 461 Dean Street
Brooklyn, NY 11217 · BBL 3-01118-0002 · Back to the property
HPD housing violations
17 HPD violations, newest first.
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at stairway b at public hall, 4th story
Jul 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at refuse room door at public hall, 4th story
Jul 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at stairway a at public hall, 5th story
Jul 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at refuse room door at public hall, 6th story
Jul 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at stairway b at public hall, 12th story
Jul 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 26th story
Jan 8, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 26g, 26th story, 6th apartment from east at south
Jan 8, 2025 · Apt 26G
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective due to hinges, section ''a'' at public hall stairs, 18th story
Jul 23, 2024
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from east located at apt 19j, 18th story, 3rd apartment from west at north
Jul 23, 2024 · Apt 19J
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 19j, 18th story, 3rd apartment from west at north
Jul 23, 2024 · Apt 19J
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective make operatable casement window east wall in the 1st room from east located at apt 10g, 10th story, 4th apartment from west at north
May 2, 2023 · Apt 10G
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the walls around bathtub in the bathroom located at apt 16p, 15th story, 4th apartment from east at south , section ''west''
Nov 19, 2020 · Apt 16P
Closed — Violation dismissed - ANon-hazardous
Refit north 1 fire door ''game room'', in the public hallway, 7th story
Nov 19, 2020
Closed — Violation dismissed - ANon-hazardous
Refit fire door, stair ''b'' public hall stairs, 15th story
Nov 19, 2020
Closed — Violation dismissed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts vacate number146359, apartment 16 m south 3
Nov 27, 2018
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 16m, 15th story, 1st apartment from west at north
Nov 16, 2018 · Apt 16M
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the entire apartment located at apt 18q, 18th story, 3rd apartment from east at south
Dec 29, 2017 · Apt 18Q
Closed — Violation dismissed
DOB building violations
22 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 30, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2017
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 16, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 16, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 24, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 24, 2016
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 21, 2016
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Mar 29, 2016
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 18, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 21, 2015
Dob violation - dismissed
ECB violations
28 ECB violations, newest first.
- Class - 2
Hoist ropes developing rouge. replace worn hoistway door gibs where needed. secure hoistway door gibs where needed. provide group 2 security lock for pit door
Jul 2, 2020
Resolve - Class - 2
Car inoperative at time of inspection
Jul 2, 2020
Resolve - Class - 2
Inoperative emergency lighting. clean pit. replace worn hoistway door gibs where needed. secure hoistway door gibs where need. shorten hoist ropes
Jul 2, 2020
Resolve - Class - 1
Cease use item: inoperative zone lock restrictor class 2 items: rouge developing on hoist ropes. replace worn hoistway door gibs where needed. secure hoistway door gibs where needed. water leaking from ac unit.
Jul 2, 2020 · Penalty $1,250
Resolve - Class - 2
Brake maintenance tag expired. dlm tag missing on controller.
Feb 18, 2020
Resolve - Class - 1
Door zone restrictor not working tampered with disable c/u. close gap hoist way door and return wall. brake maintenance tag expired.
Feb 18, 2020 · Penalty $1,250
Resolve - Class - 2
Brake maintenance tag expired. dlm tag missing on the controller.
Feb 18, 2020
Resolve - Class - 2
Brake maintenance tag expired. dlm tag missing on controller.
Feb 18, 2020
Resolve - Class - 1
Door zone restrictor not working tampered with disable c/u. dlm tag missing on controller. close gap hoist way door and return wall. brake maintenance tag expired.
Feb 18, 2020 · Penalty $1,250
Resolve - Class - 2
Sidewalk shed does not meet color specifications.note:at time of inspection i observed sidewalk shed color contrary to code 3307.6.4.11 sidewalk shed not painted hunter green.
Feb 15, 2017 · Penalty $800
Resolve - Class - 1
Supervision or use of power-operated hoisting machine without a hoisting machine operators license.performed audit inspection on cn#74613.attime of inspection i observed hmo#9400 wayne miller,operating tower cr
Aug 27, 2016 · Penalty $1,600
Resolve - Class - 1
Cn 746/13;cd4499.inadequate safety measures;operation of crane in unsafe manner.hmo:wayne miller;lic 9400exp:01-31-18 class a (twr)tower crance in the process of jacking down.pinched 480 3 phase power source fo
Aug 15, 2016 · Penalty $4,800
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations:at time of inspection responding to incident #22176,complaint #3567161. fdny responded to incident of fire on 15th flr (rm16j) wh
Jul 21, 2016 · Penalty $25,000
Resolve - Class - 1
Supervision or use of power-operated hoisting machine w/o a hoisting machine operators license. swo#052716rh01 at time of inspection tower crane cd4626 cn #105215 used by regal usa construction was being opera
May 27, 2016
Resolve - Class - 1
Supervision or use of pwoer operated hoisting machine w/o a hoisting machine operators license. swo#052716rh01 at time of inspection tower cane cd 4626 cn#105215 was being operated by hmo #9312,class a license
May 27, 2016
Resolve - Class - 1
Supervision or use of power-operated hoisting machine w/o a hoisting machine operators license. performed audit inspection on cn#74613. at time of inspection i observed hmo#9400 wayne miller operating tower cra
Apr 14, 2016
Resolve - Class - 1
Bc3301.6.1 concrete embedded straps-design.note @ the time of inspection of a 23 story bldg @ 3rd fl level,construction work in progress.safety straps embedded into concrete did not comply w/ approved design dr
Mar 29, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to provide institute maintain safety equipment measures or temporary construction no guardrails.note @ the time of inspection of a 23 story bldg @ 3rd fl level construction work in progress.i observed t
Mar 29, 2016 · Penalty $2,400
Resolve - Class - 1
Bc3301.2 adequate means of egress.note @ the time of inspection of a 23 story bldg @ 3rd fl level,construction work in progress.i observed 2means of egress @ exp1 & 4 was obstructed w/ debris,materials,construc
Mar 29, 2016 · Penalty $1,600
Resolve - Class - 1
3320.2 operation of(defective)hoisting equipment.tower crane cd 4494,cn 746/13.above tower crane was lifting(mocular)units with wire rope crushed and borken into two sets of slings.rem:comply with code,replace
Aug 17, 2015 · Penalty $1,630
Resolve - Class - 1
3303.8 standpipe not in a state of readiness.at time of inspection observed,prefabricated building currently 16 stories.the site safety manager stated that during ahydrostatic test being performed on the standp
Jul 22, 2015 · Penalty $8,000
Resolve - Class - 1
Sec. 3303.8 standpipe not in a state of readiness. at time of inspection observed,prefabricated bldg currently 16 sty. the site safety manager stated that during a hydrostatic test being performed on the stand
Jul 22, 2015
Resolve - Class - 2
Failure to provide approved accepted plans @ jobsite @ time of insp.@ time of insp.of(progrecel)33 story new bldg,no site safety plan or adequate plan presented.bldg @ 10 story for prefab. 1 construction.stop a
Dec 11, 2014 · Penalty $2,500
Resolve - Class - 2
Operation of crane with expired cd. at time of inspection cd#4499 cn#746/13 cd was expired on 9-12-14. crane should have a valid cd at all time while on a construction site.rmdy: obtain a valid cd.
Sep 16, 2014 · Penalty $2,400
Resolve - Class - 2
3310.6 no designated site safety manager.noticed @ time of insp.nb in progress.pw 2 states john oriino #1842 is ssm on site for 6 months & not on pw2 95 designated ssm.rem:provide designated ssm as per code
May 15, 2014
Resolve - Class - 1
Failure to safeguard all persons and property affected by construction operation.at the time of inspection worker was observed to be workingat the third floor level close to the edge w/o any personal protection
Apr 2, 2014 · Penalty $2,400
Resolve - Class - 2
Project information panel/construction sign not provided or not in compliance with section noted:construction site fence erected under permit#320321139-01-eq-fn issued 12/17/12 does not comply w/ll47/13.project
Oct 15, 2013
Resolve - Class - 1
3320.3.1,rs19-2.18 partial *swo*.improperly marked,unidentified rigging,wire rope slings.wire rope replacement criteria/broken wires.note:wire rope rigging actively being used to off load & erect steel multip
Sep 23, 2013 · Penalty $1,600
Resolve