roofy

Violations at 620 Atlantic Avenue

Brooklyn, NY 11217 · BBL 3-01118-0001 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

The newest 50 of 100 DOB violations. The city keeps the complete history.

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 5, 2022

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 25, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 25, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 25, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 25, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 25, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 25, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 25, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 25, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 25, 2020

    Dob violation - resolved
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Oct 1, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 9, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 20, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 29, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 29, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 29, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 29, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 29, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 29, 2018

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 26, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 5, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 5, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 5, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 2, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 2, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 2, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 2, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 2, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 2, 2017

    Dob violation - resolved

ECB violations

39 ECB violations, newest first.

  • Class - 1

    Escalator is cease use pending accident investigation(cease use).

    Apr 2, 2026 · Penalty $1,280

    Resolve
  • Class - 2

    Steps developing razor thin treads; replace where needed. eliminate gap on skirt near top. inaudible stop switches. missing safety signage.

    Jun 4, 2025 · Penalty $3,125

    Active
  • Class - 2

    Restore to service so a full inspection can be made by this department.

    Nov 5, 2022 · Penalty $625

    Resolve
  • Class - 2

    Restore to service so a full inspection can be made by this department.

    Nov 5, 2022 · Penalty $625

    Resolve
  • Class - 1

    Failure to notify the department of an accident/incident that resultedin a fatality or an injury.note:a worker accidentally cut his right leg above the knee when he was cutting up boxes.the worker was transport

    Sep 14, 2021 · Penalty $5,000

    Resolve
  • Class - 2

    Obtain certificate of completion on application number b001226666 and perform test with the dob.

    Dec 14, 2020 · Penalty $1,562

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35409201z issued on 04-17-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.

    Jun 28, 2019 · Penalty $6,250

    Active
  • Class - 1

    Failure to provide unobstruvcted exit passageway. at time of inspection during an active event in the"billboard lounge"it was noted the fire exit adjacent to the"ck kitchen"was fully blocked by an industrial fo

    Apr 17, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/commissioner's order contained in summons/violation 38262670x issued on 4/30/18,& to file a cert of correction purusuantto 28.201.1.an acceptable certificate has not yet been filed despite t

    Mar 18, 2019 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply w/commissioner's order contained in summons/violation 38262669z issued on 4/30/18,& to file a cert of correction purusuantto 28.201.1.an acceptable certificate has not yet been filed despite t

    Mar 18, 2019 · Penalty $3,125

    Resolve
  • Class - 2

    48y13,70y13,03i10. 48y,70u- seal leaks; 03i-repair damage to door

    Apr 30, 2018 · Penalty $625

    Resolve
  • Class - 2

    48y13,70y13. seal all leaks

    Apr 30, 2018 · Penalty $625

    Resolve
  • Class - 2

    39x10,17h11,01r11,70o02,68b07,99b07,40r07,64m07. 39x-insp box; 17m-where needed; 68b-not up to date; 99b-pressure test info; 40r-remove allequipment not related to operation of elevator; 64m-provide device #.

    May 1, 2017 · Penalty $500

    Resolve
  • Class - 2

    97x10,92j01,91i10,91q03,64m07. 91i-covers; 81q-bottom cover; 64m-provide nyc device #

    May 1, 2017 · Penalty $500

    Resolve
  • Class - 1

    *91m07,*92i10,91i10,92j01,36m07,64m07. *cease use items: 91m-top switch; 92i-excessive gap exposing unit*; 91i-covers; 92j-adjust to code min gap where needed; 36m-replace plates with missing teeth; 64m-provi

    May 1, 2017 · Penalty $500

    Resolve
  • Class - 2

    B265 as per class 2 (b265) 28-303.7 failure to file a complete boiler inspection reprot as per dob records. submit a current b09 report.

    Mar 15, 2017

    Resolve
  • Class - 2

    95b10/11 repair or remove inoperative, factory by-passed switch.

    Aug 19, 2015

    Resolve
  • Class - 1

    Bc3301.2 failure to safeguard all persons and property affected by construction operations.noted while responding to complaint #3506956 of iron worker crushed by steel truss.while unloading steel for green roof

    Feb 24, 2015 · Penalty $12,000

    Resolve
  • Class - 1

    At time of inspection facade panels were being removed w/o a permit. the panels were located at 2nd flr above the rear entrance on dean st.provide engineers report that incomplete facade work is stable.rmdy:

    Aug 21, 2013 · Penalty $800

    Resolve
  • Class - 3

    Work does not conform to approved construction documents or amendmentsnoted: 1-application #320584809/sg/applic#320584836/sg/the contents ofdwg's dated 12/26/12 pages 2-001,s-002 is contrary to job's descriptio

    Mar 12, 2013

    Resolve
  • Class - 2

    97r05 call dob so complete insp can be done

    Sep 4, 2012

    Resolve
  • Class - 2

    97r05 call dob so complete insp can be done

    Sep 4, 2012

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperations.at time of inspection during a rain storm the crane is set up w/improper drainage.crane could become unstable causing it to tip

    Aug 2, 2012

    Resolve
  • Class - 1

    Inadequate safety measures: operation of crane/derrich/hoisting equipment in an unsafe manner. at time of inspection inadequate drainage being used.at time of inspection during a rain storm drainage being used

    Aug 1, 2012

    Resolve
  • Class - 2

    Supported scaffold erected at exp 4 (flatbush ave) at roof level (column 1/43) not in compliance w/dob approved plans - job #320479512. noted: standard pipe scaffolds, sections modified - footing section of

    Jun 8, 2012

    Resolve
  • Class - 1

    3314-4.3:daily inspection log. noted:at time of inspection project manager was unable to provide daily inspection log for supported scaffoldrem:stop all work conform to building code standards call for reinspec

    May 15, 2012 · Penalty $1,600

    Resolve
  • Class - 1

    Work without a permit. electrical for hoist. upon inspection hoist erected to 5th flr const fl located on the atlantic ave side. dob recordsshow no electrical permit filed & or issued for electrical service (te

    Apr 3, 2012 · Penalty $800

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperations. at time of inspection crane has no safety barrier around working area.public (workers)can walk through an unsafe area w/o being

    Dec 28, 2011 · Penalty $2,400

    Resolve
  • Class - 2

    Operation of a crane w/o cert of onsite insp cn 623-11 was not signed off by engineer of record prior to use of crane crane cd 3896 above is general contractor on project

    Dec 8, 2011 · Penalty $2,400

    Resolve
  • Class - 2

    Operation of a cran w/o cert of on site insp cn623-11 was not signed of by engineer of record prior to use of crane work cran 3896 above is user of crane rem: obtain cert of onsite insp comply w/ code

    Dec 8, 2011 · Penalty $2,400

    Resolve
  • Class - 1

    At tiem of insp crane is hoisting holding load w/ the main and auxiliary load lines in use critical pich there is no master rigger present on job site swo 112911jh01 rem; obtain license

    Nov 29, 2011 · Penalty $4,800

    Resolve
  • Class - 2

    At time of insp crane is lifting w/ min and auxiliary lines lift is not shown on drawing swo 112911jh01 rem: conform to approved documents or amendments

    Nov 29, 2011 · Penalty $250

    Resolve
  • Class - 1

    As time of insp crane is hoisting load over working head workers were underneath the load working on suspended load swo 112911jh01 rem: stop all work

    Nov 29, 2011 · Penalty $2,400

    Resolve
  • Class - 1

    At time of insp crane is hoisting load w/ main and auxiliary lines dual pick they are doing this by working personnel w/ no engineered drawing to determine how dangerous critical pick is swo 112911jh01 rem: dis

    Nov 29, 2011 · Penalty $4,800

    Resolve
  • Class - 1

    Sec. 3307.4.1 warning lights - upon inspection temporary pedestrian walkway in roadway along flatbush ave side of jobsite. approx 450ft of walkway in roadway using wood barricades. no warring lights or reflecto

    Oct 11, 2011 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations - incident occurred when a mobil crane (300 tons) left the job site using the 6th ave exit - the crane operator was positioning

    Aug 5, 2011 · Penalty $2,400

    Resolve
  • Class - 1

    Work does not conform to approved construction documents &/or approvedamendments.noted @ time of inspection.contractor installed construction fence (permit#320135493)contrary to approved plan.as flatbush ave

    Jun 8, 2010 · Penalty $5,000

    Resolve
  • Hazardous

    Total obstruction. note at side of bldg (atlantic ave side) chain linkfence erected on the entire sidewalk creating at total obstruction in which pedestrians have to walk in street. remedy: remove obstruction

    Mar 3, 2006 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to mantain: defect is:no fire stopping cellar ceiling.no fire proof enclosure for boiler.remedy: install fire proof sheet rock on entire cellar ceiling and install fire proof enclosure around boiler.

    Jun 12, 1990 · Penalty $515

    Resolve