roofy

Violations at 1601 8 Avenue

Brooklyn, NY 11215 · BBL 3-01109-0001 · Back to the property

HPD housing violations

42 HPD violations, newest first.

  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ,missing at public hall, 1st story

    Oct 2, 2026

    Open — Nov certified on time
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Sep 18, 2026

    Open — Nov certified on time
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at entrance door to recreation room, at public hall, 1st story

    Jul 24, 2026

    Closed — Violation closed
  • CImmediately hazardous

    Remove device preventing door from being self-closing plastic wedge obstructed entrance door to laundry room, at public hall, 1st story

    Jul 24, 2026

    Closed — Violation closed
  • ANon-hazardous

    Cleanse to the satisfaction of this department the visible mold at caulking and grout joints of the ceramic tiles at east, south and west walls around bathtub, in the bathroom located at apt 221, 2nd story, 3rd apartment from west at north , section at north

    Jul 24, 2026 · Apt 221

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of rodents rats observed at flower garden in front of building running towards east of building. located burrow at east of building yard

    Oct 9, 2024

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 219, 2nd story, 1st apartment from north at east

    Jan 5, 2023 · Apt 219

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 619, 6th story, 1st apartment from west at north , section at north

    Dec 11, 2022 · Apt 619

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 516, 5th story, 4th apartment from west at north

    Nov 26, 2022 · Apt 516

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 516, 5th story, 4th apartment from west at north

    Nov 26, 2022 · Apt 516

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 5, 2021

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 418, 4th story, 1st apartment from west at north , section at east

    Mar 17, 2021 · Apt 418

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 418, 4th story, 1st apartment from west at north , section at east

    Mar 17, 2021 · Apt 418

    Closed — Violation closed
  • BHazardous

    Abate the infestation consisting of bedbugs in the entire apartment located at apt 418, 4th story, 1st apartment from west at north , section at east

    Mar 17, 2021 · Apt 418

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 316, 3rd story, 4th apartment from west at north

    Nov 10, 2020 · Apt 316

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 316, 3rd story, 4th apartment from west at north

    Nov 10, 2020 · Apt 316

    Closed — Violation closed
  • BHazardous

    Abate the infestation consisting of bedbugs in the entire apartment located at apt 316, 3rd story, 4th apartment from west at north

    Nov 10, 2020 · Apt 316

    Closed — Violation dismissed
  • BHazardous

    Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 210, 2nd story, 4th apartment from east at south

    Aug 7, 2020 · Apt 210

    Closed — Violation dismissed
  • BHazardous

    Properly repair the broken or defective counter balance at lower sash, 2nd window from east at south wall in the 2nd room from east at south located at apt 210, 2nd story, 4th apartment from east at south

    Aug 7, 2020 · Apt 210

    Closed — Violation dismissed
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 713, 7th story, 1st apartment from south at west

    Aug 7, 2020 · Apt 713

    Closed — Violation dismissed
  • CImmediately hazardous

    Repair the leaky and/or defective water supply pipe to radiator at south wall in the 1st room from east at south located at apt 627, 6th story, 3rd apartment from east at south

    Nov 20, 2019 · Apt 627

    Closed — Violation closed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jun 26, 2019

    Closed — Violation closed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 110, 1st story, 6th apartment from east at south

    Apr 17, 2019 · Apt 110

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 110, 1st story, 6th apartment from east at south , section at south

    Apr 8, 2019 · Apt 110

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 110, 1st story, 6th apartment from east at south

    Mar 29, 2019 · Apt 110

    Closed — Violation closed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 110, 1st story, 6th apartment from east at south

    Aug 1, 2018 · Apt 110

    Closed — Violation closed
  • BHazardous

    Abate the nuisance consisting of roaches located at apt 110, 1st story, 1st apartment from west at north

    Aug 1, 2018 · Apt 110

    Closed — Violation closed
  • BHazardous

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 210, 2nd story, 4th apartment from south at west

    Jun 23, 2018 · Apt 210

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north located at apt 713, 7th story, 1st apartment from south at west

    Apr 11, 2018 · Apt 713

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 726, 7th story, 2nd apartment from east at south , section ''north''

    Nov 13, 2015 · Apt 726

    Closed — Violation dismissed
  • BHazardous

    Repair the roof so that it will not leak ceiling in the bathroom located at apt 726, 7th story, 2nd apartment from east at south , section ''north''

    Nov 13, 2015 · Apt 726

    Closed — Violation dismissed
  • BHazardous

    Repair the roof so that it will not leak at ceiling in the bathroom located at apt 726, 7th story, 1st apartment from east at south

    Oct 31, 2015 · Apt 726

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 726, 7th story, 1st apartment from east at south

    Oct 31, 2015 · Apt 726

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 6, 2015

    Closed — Violation dismissed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Jul 28, 2015

    Closed — Violation closed
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 110, 1st story, 6th apartment from east at south

    Aug 18, 2014 · Apt 110

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the smoke detector missing located at apt 110, 1st story, 6th apartment from east at south

    Aug 18, 2014 · Apt 110

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from east at south located at apt 110, 1st story, 6th apartment from east at south

    Aug 18, 2014 · Apt 110

    Closed — Violation dismissed
  • BHazardous

    Properly repair the broken or defective counter balance at lower sash window in the entire apartment located at apt 106, 1st story, 2nd apartment from east at south

    Mar 22, 2013 · Apt 106

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective counter balance at lower sash window in the 1st room from east located at apt 106, 1st story, 2nd apartment from east at south

    Mar 22, 2013 · Apt 106

    Closed — Violation closed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 106, 1st story, 2nd apartment from east at south , section at south

    Oct 6, 2012 · Apt 106

    Closed — Violation dismissed
  • ANon-hazardous

    Refit all windows upper and lower sashes in the entire apartment located at apt 106, 1st story, 1st apartment from east at south

    Jun 6, 2012 · Apt 106

    Closed — Violation closed

DOB building violations

35 DOB violations, newest first.

  • Construction other optional

    C-construction other optional

    Jan 12, 2026

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2021

    Aug 21, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    Cease use

    Dec 26, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 26, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 30, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 30, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 28, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 28, 2014

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7a technical report by 02/21/2012

    Jan 31, 2013

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2010 inspection/test

    Dec 13, 2011

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 25, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 1, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 1, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 31, 2008

    Dob violation - resolved
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 3, 2007

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 15, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 7, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 1, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 1, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    3p7374

    Jan 16, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    3p7373

    Jan 16, 2003

    Dob violation - resolved
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Elevator elevatorrequired

    3p7373

    Mar 21, 2002

    Dob violation - resolved
  • Elevator elevatorrequired

    3p7374

    Mar 21, 2002

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Feb 19, 2002

    Dob violation - dismissed
  • Elevator elevatorrequired

    3p7374

    Mar 2, 2001

    Dob violation - resolved
  • Elevator elevatorrequired

    3p7373

    Mar 2, 2001

    Dob violation - resolved

ECB violations

5 ECB violations, newest first.

  • Class - 2

    At the time of inspection, i observed sidewalk shed installed at all exposure, after review of dob record permit b01080856-i1-sh expired on 08/02/2025

    Oct 9, 2025

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#909250. remedy:submit acceptable requir

    Dec 9, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Bc 3301.1.1 responsibility for safety at time of inspection on an active 2 story topped of building under permit#3216417821 i was observed ongoing construction operations and multiple safety violations.upon rev

    Sep 30, 2021 · Penalty $650

    Resolve
  • Non-hazardous

    40l,75#. 75 perform 5 year test.property tag device and elev 3 form.

    Aug 22, 1995

    Resolve
  • Non-hazardous

    46h,75#. 75 perform 5 year test.properly tag device file elev 3 form.

    Aug 22, 1995

    Resolve