Violations at 459 15 Street
Brooklyn, NY 11215 · BBL 3-01103-0054 · Back to the property
HPD housing violations
The newest 50 of 166 HPD violations. The city keeps the complete history.
- BHazardous
Remove all encumbrances consisting of household item at vestibule at public hall, 1st story
Oct 1, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling, at 1st public hall bulkhead from east, 4th story
Jun 22, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at west entrance door to roof, at 1st public hall bulkhead from east, 4th story
Jun 22, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the ceiling, north, east, and south walls at 1st public hall bulkhead from east, 4th story
Jun 22, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at the ceiling, north east and south walls at 1st public hall bulkhead from east, 4th story
Jun 22, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4a, 1st story, 1st apartment from west at north
Jun 22, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor tiles, in the foyer located at apt 4a, 1st story, 1st apartment from west at north
Jun 22, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective wood sub-floor in the private hallway located at apt 4a, 1st story, 1st apartment from west at north
Jun 22, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor tiles, in the private hallway located at apt 4a, 1st story, 1st apartment from west at north
Jun 22, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor tiles, in the kitchen located at apt 4a, 1st story, 1st apartment from west at north
Jun 22, 2026 · Apt 4A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the bathroom located at apt 4a, 1st story, 1st apartment from west at north
Jun 22, 2026 · Apt 4A
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the visible mold at caulking and grout joints of the ceramic tiles at west wall around bathtub, in the bathroom located at apt 4a, 1st story, 1st apartment from west at north
Jun 22, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor tiles, in the 1st room from north at center located at apt 4a, 1st story, 1st apartment from west at north
Jun 22, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor tiles, in the 1st room from north at east located at apt 4a, 1st story, 1st apartment from west at north
Jun 22, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor tiles in the 1st room from north at west located at apt 4a, 1st story, 1st apartment from west at north
Jun 22, 2026 · Apt 4A
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the metal radiator 1st from north at west, in the 1st room from north at center located at apt 4a, 1st story, 1st apartment from west at north
Jun 22, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Replace with new the missing glass pane lower sash 1st window from east at north, in the 1st room from north at west located at apt 4a, 1st story, 1st apartment from west at north
Jun 22, 2026 · Apt 4A
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Jun 18, 2026
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall in the bathroom located at apt 4a, 1st story, 1st apartment from west at north
Jun 11, 2026 · Apt 4A
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator at north wall in the 2nd room from north at center located at apt 4a, 1st story, 1st apartment from west at north
Jun 11, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color wood floor in the 2nd room from north at center located at apt 4a, 1st story, 1st apartment from west at north
Jun 11, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 4a, 1st story, 1st apartment from west at north
Jun 11, 2026 · Apt 4A
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at east located at apt 4a, 1st story, 1st apartment from west at north
Jun 11, 2026 · Apt 4A
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
May 24, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
May 24, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
May 18, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of construction material , bicycles and household items . at public hall, 1st story
Mar 29, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Mar 29, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items and bicycles at public hall, 1st story
Mar 4, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Mar 4, 2026
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of bicycles, household items at public hall, 1st story
Mar 2, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at center located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Properly secure the loose electrical fuses box at south wall in the kitchen located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from north at center located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Refit wall cabinet at north in the kitchen located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from north at west located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at upper window sash in the bathroom located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective wood door in the 1st room from north at east located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator in the 1st room from north at west located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balance at lower window sash 2nd window at north in the 1st room from north at center located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department window frame at north in the entire apartment located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective marble door saddle in the bathroom located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the kitchen located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the kitchen located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical light fixtures at ceiling in the kitchen located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the private hallway located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at upper window sash in the kitchen located at apt 4a, 1st story, 1st apartment from west at north
Mar 2, 2026 · Apt 4A
Closed — Violation closed
DOB building violations
7 DOB violations, newest first.
- Landmark none
Landmk-landmark none
Mar 28, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 4, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 7, 2015
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 16, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations
13 ECB violations, newest first.
- Class - 2
27-499 failure to maintain fire escape per 27-499. noted: installed metal frame with 2'x3' hanging "for rent" sign on 2nd floor fire escape balcony when 27-499 states, "no sign shall be attached in any manner
Mar 16, 2016
Resolve - Class - 2
Work w/o a permit.noted in apt2a fully demolished all interior partition walls work 100% complete,no permits on file.in apt5a,removed & installed new wooden fl joists @ kitchen area.rem obtain permit
Jul 16, 2015 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in code compliant manner.noted @ cellar levelseveral large areas of the fire stopping ceiling to be missing.rem maintain bldg
Jul 16, 2015 · Penalty $1,000
Resolve - Class - 2
28.104.7.1 failure to provide approved/accepted plans @ jobsite @ timeof inspection.noted job#321117046 permit for renovation of apt2a & cellar @ time of inspection ongoing construction,but no approved demo pla
Jul 16, 2015 · Penalty $800
Resolve - Class - 1
Work w/o permit work noted: in cellar i observed at 11:30am a 3/4 gas line was ran for a bbq in side court yard no permit filed w/the dob's. also in the same area in the cellar multiple gas lines were ran to
Jul 16, 2015 · Penalty $1,600
Resolve - Class - 1
Filed a certificate, form, application etc., containing a material false statements. under application #340203014 inspection were submitted & plumbing was s/o for apt 5a. no plumbing work was done inside the a
Jul 16, 2015 · Penalty $4,800
Resolve - Class - 2
Unapproved unsafe unsuitable electric equipment devices apparatus materials appliances or wiring in use. defective electrical wiring in kitchen ceiling outlet apt 4b. remedy: comply w/ec code.
Jul 16, 2015 · Penalty $400
Resolve - Class - 2
Electrical work w/o permit observed at 11:15am demolition of electrical wiring in apt's #1a,2a,5a,2d,3c,& 5b. no application on file for electrical wiring demolition. remedy: obtain permit.
Jul 16, 2015 · Penalty $400
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments.swo-stop work order in effect at apt 2a, work under application/permits #321049995, 340203014,32106653; plans doesnot show sco
May 4, 2015 · Penalty $2,500
Active - Class - 1
Work w/o a permit.work noted @ apt.2a demo of interior wall partition (renew)kitchen and (renew)entire bathroom tub sinl and bowl.stop all work.rem:obtain permit or restore to previous legal condition call thei
Mar 10, 2015 · Penalty $1,600
Resolve - Class - 2
Work does not conform to approved plan a const document amendment in manufacturing dist.noted:no ceiling detached in being strap and no walldetached in apt 3c job #32104999j 1/8/15.stop all work.rem:comply w/co
Mar 10, 2015 · Penalty $250
Resolve - Class - 2
Failure to provide approved/accept plans at jobsite at time of inspec tion.noted: interior demo at various apts on all floors ongoing,no plans onsite. job #321066653 exp 8/18/15 stop all work/partial to replace
Jan 15, 2015
Resolve - Hazardous
Failure to maintain bldg.- hazardous. defect noted: (1) front & side metal fire escapes rusted at various locations, w/peeling paint hanging out. (2) at front facade of bldg noted separations of lime work, miss
Mar 15, 2006 · Penalty $800
Resolve