roofy

Violations at 195 Prospect Park West

Brooklyn, NY 11215 · BBL 3-01103-0048 · Back to the property

HPD housing violations

32 HPD violations, newest first.

  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 1, 2022

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 12, 2021

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 12, 2021

    Closed — Violation dismissed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 11, 2019

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Sep 11, 2019

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 11, 2019

    Open — Nov sent out
  • CImmediately hazardous

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing on wall at public hall, 1st story

    Sep 11, 2019

    Open — Nov sent out
  • ANon-hazardous

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Sep 11, 2019

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 11, 2019

    Open — Nov sent out
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.

    Sep 11, 2019

    Closed — Violation closed
  • CImmediately hazardous

    Code: arrange and make self-closing the doors in the entrance located at apt 3e, 3rd story, 1st apartment from north at east

    Sep 11, 2019 · Apt 3E

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective saddle at the entrance door in the kitchen located at apt 3e, 3rd story, 1st apartment from north at east

    Sep 11, 2019 · Apt 3E

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt 3e, 3rd story, 1st apartment from north at east

    Sep 11, 2019 · Apt 3E

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective wood floor around radiator in the 2nd room from east located at apt 3e, 3rd story, 1st apartment from north at east

    Sep 11, 2019 · Apt 3E

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the private hallway located at apt 3e, 3rd story, apartment at east

    Sep 11, 2019 · Apt 3E

    Open — Invalid certification
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the kitchen located at apt 3e, 3rd story, apartment at east

    Sep 11, 2019 · Apt 3E

    Open — Invalid certification
  • BHazardous

    Properly repair the broken or defective outlet cover defective in the kitchen located at apt 3e, 3rd story, 1st apartment from north at east

    Dec 21, 2008 · Apt 3E

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 3e, 3rd story

    Dec 21, 2008 · Apt 3E

    Open — Nov sent out
  • ANon-hazardous

    Refit door in the entrance located at apt 3e, 3rd story, apartment at west

    Oct 1, 2007 · Apt 3E

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective wash basin in the bathroom located at apt 3e, 3rd story, apartment at west

    Oct 1, 2007 · Apt 3E

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic tile walls in the bathroom located at apt 3e, 3rd story, apartment at west

    Oct 1, 2007 · Apt 3E

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic tile walls in the bathroom located at apt 3e, 3rd story, apartment at west

    Oct 1, 2007 · Apt 3E

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north located at apt 3e, 3rd story

    Oct 1, 2007 · Apt 3E

    Open — Nov sent out
  • BHazardous

    M/d law abate the nuisance consisting of evidence of concealed water leak ceiling in the 2nd room from north located at apt 3e, 3rd story, apartment at west

    Oct 1, 2007 · Apt 3E

    Open — Nov sent out
  • BHazardous

    Repair or replace the smoke detector defective in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south

    Oct 21, 2006 · Apt 1B

    Open — Nov sent out
  • BHazardous

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south

    Oct 21, 2006 · Apt 1B

    Open — Nov sent out
  • BHazardous

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods front of building at fire escape

    May 8, 2006

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east located at apt 3e, 3rd story, 1st apartment from north at east

    May 8, 2006 · Apt 3E

    Open — Nov sent out
  • CImmediately hazardous

    Fire escape defective. replace with new the broken, defective and/or missing metal tread 5 up 2 to 3 sty north rear er1

    Oct 26, 1994

    Open — Nov certified late
  • CImmediately hazardous

    D26-10.01 adm code & 309 m/d law abate the nuisance consisting of wood fence erected across north yard blocking egress from rear fire escapes.

    Oct 26, 1994

    Open — Nov sent out
  • BHazardous

    D26-10.01 adm code replace with new the missing window guard intermediate landing 3 to 4 stys public hall.

    Oct 26, 1994

    Open — Nov sent out
  • BHazardous

    D26-10.01 adm code provide window guard 2 & 3 stys public hall intermediate landing.

    Oct 26, 1994

    Open — Nov sent out

DOB building violations

1 DOB violations, newest first.

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active

ECB violations

2 ECB violations, newest first.

  • Class - 2

    Failure to maintain building in code-compliant manner. failure to comply with law for drainage system per bc 702.1.27-911. at time of inspection i observed roof drain not connected to building drain-water comin

    Jun 4, 2018 · Penalty $312

    Resolve
  • Non-hazardous

    Failure to safeguard public and property during construction operation.upon inspection of above address chimney of masonry at 4th fl in progress.

    Jun 29, 2006

    Resolve