504 8 Avenue
Brooklyn, NY 11215BBL 3-01084-0039Map
Owner of record: Methodist Hospital Of Brooklyn
504 8 Avenue is a hospital / health built in 2017 in Brooklyn, 11215. The owner of record is Methodist Hospital Of Brooklyn. HPD has recorded 91 housing violations here, most recently on April 29, 2015.
- HPD violations
- 91
- DOB violations
- 11
- ECB violations
- 21
- HPD complaints
- 25
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 91
- ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 29, 2015
Closed — Violation closed - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Dec 30, 2014 · Apt 3B
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following ***minimum 100 watts of incandescent light required***
Aug 4, 2011
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3fl, 3rd story, 1st apartment from west at north
Dec 13, 2009 · Apt 3FL
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3fl, 3rd story, 1st apartment from west at north
Dec 13, 2009 · Apt 3FL
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system n/a to boiler room , door locked at cellar at boiler room
Dec 13, 2009
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Dec 13, 2009
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3fl, 3rd story, apartment at north
Jun 29, 2005 · Apt 3FL
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Jun 29, 2005
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts. lights not on.
Feb 15, 2005 · Apt BLDG
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
File with this department a registration statement for building.
May 2, 2001
Closed — Violation dismissed - ANon-hazardous
Remove the torn and/or loose floor covering 3 sty public hall.
Sep 16, 1991
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors entrance 3 sty apt 3. located at apt 3
Sep 16, 1991 · Apt 3
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following fixture present 100 watts required.
Sep 16, 1991
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective 3 sty apt 3. located at apt 3
Sep 16, 1991 · Apt 3
Closed — Violation closed - BHazardous
D26-10.01 adm code properly repair the broken or defective lock vestibule door 1 sty public hall r40.
Jun 20, 1991
Closed — Violation closed - CImmediately hazardous
D26-17.10 adm code provide ready access to building's heating system front cellar door padlocked.
Jun 20, 1991
Closed — Violation closed - CImmediately hazardous
D26-17.10 adm code post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to building's heating system 1 sty pub hall.
Jun 20, 1991
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system cellar door locked.
Nov 21, 1990
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing 1 sty public hall & boiler room door cellar.
Nov 21, 1990
Closed — Violation closed - BHazardous
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing 1 sty east apt 1r. , section '' ''
Jan 9, 1988 · Apt 1R
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of double cylinder key operated lock entrance door to 4 sty rear apt 4r. , section '' ''
Oct 6, 1987 · Apt 4R
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate 4 sty rear apt 4r. , section '' ''
Oct 6, 1987 · Apt 4R
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors entrance to 4 sty rear apt 4r. , section '' ''
Oct 6, 1987 · Apt 4R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall 1 sty west apt 1b private hall foyer. located at apt 1b
Sep 30, 1987 · Apt 1B
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceiling 1 sty west apt 1b bathroom. located at apt 1b
Sep 30, 1987 · Apt 1B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective 1 sty west apt 1b allen. located at apt 1b
Sep 30, 1987 · Apt 1B
Closed — Violation closed - BHazardous
Properly secure the loose washbasin 1 sty west apt 1b bathroom. located at apt 1b
Sep 30, 1987 · Apt 1B
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors entrance 1 sty west apt 1b. located at apt 1b
Sep 30, 1987 · Apt 1B
Closed — Violation closed - BHazardous
Replace with new the missing interior & exterior door knobs locking device vestibule to 1 sty public hall.
Sep 30, 1987
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective sagging ceramic tile floor water closet compartment 1 sty east apt 1r. , section '' ''
Aug 26, 1987 · Apt 1R
Closed — Violation closed - BHazardous
D26-10.01, 10.05 adm code and dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes 3 sty rear.
Aug 6, 1987
Closed — Violation closed - BHazardous
D26-10.01, 10.05 adm code arrange and make self-closing the doors entrance to bulkhead r32.
Aug 5, 1987
Closed — Violation closed - BHazardous
Replace with new the missing entrance door to bulkhead at roof.
Aug 5, 1987
Closed — Violation closed - BHazardous
D26-10.01, 10.05 adm code fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate 3 sty west apt 3b. located at apt 3b
Jun 8, 1987 · Apt 3B
Closed — Violation closed - BHazardous
D26-32.01 adm code provide an adequate supply of gas to the fixtures apts 4a 2b 3b & 1b.
Jun 8, 1987
Closed — Violation closed - BHazardous
D26-20.08 adm code repair or replace the smoke detector defective 3 sty west apt 3b cotijo. located at apt 3b
Jun 8, 1987 · Apt 3B
Closed — Violation closed - CImmediately hazardous
D26-10.01 adm code & 309 m/d law abate the nuisance consisting of double cylinder key operated lock entrance door 2 to 3 sty apt 3. , section '' ''
May 4, 1987 · Apt 3
Closed — Violation closed - BHazardous
D26-10.01, 10.05 adm code arrange and make self-closing the doors entrance 2 sty apt 3. , section '' ''
May 4, 1987 · Apt 3
Closed — Violation closed - CImmediately hazardous
D26-17.10 adm code provide ready access to building's heating system cellar door locked.
Oct 2, 1986
Closed — Violation closed - BHazardous
D26-10.01, 10.05 adm code remove all encumbrances consisting of doors and wood basement public hall rear.
Oct 2, 1986
Closed — Violation closed - BHazardous
D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls 4 sty to roof.
Sep 4, 1986
Closed — Violation closed - BHazardous
D26-10.01 adm code replace with new the missing skylights over dumbwaiter bulkhead roof rear.
Sep 4, 1986
Closed — Violation closed - BHazardous
D26-10.01 adm code properly secure the loose wood tread 2 & 12 up 1 to 2 sty public hall stairs.
Sep 4, 1986
Closed — Violation closed - BHazardous
D26-10.01 adm code provide top window guard rail 4 sty public hall.
Sep 4, 1986
Closed — Violation closed - BHazardous
D26-10.01, 10.05 adm code arrange and make self-closing the doors public hall bulkhead to roof.
Sep 4, 1986
Closed — Violation closed - BHazardous
D26-10.01 adm code replace with new the missing terra cotta coping east wall roof.
Sep 4, 1986
Closed — Violation closed - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective eroded brick mortar joints parapet wall 4 sty to roof east air shaft.
Sep 4, 1986
Closed — Violation closed - BHazardous
D26-10.01, 10.05 adm code and dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes 4 sty rear.
Sep 4, 1986
Closed — Violation closed - BHazardous
D26-10.01 adm code properly repair the broken or defective paving front top landing entrance to bldg.
Sep 4, 1986
Closed — Violation closed
DOB building violations · 11
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 24, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 8, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 21
- Class - 1
Sec. 3303.7.2 fire extinguishers inadequately maintained. noted: at time of my inspection of a new 8 sty bldg construction in progress,bldg topped off,i observed numerous fire extinguishers on multiple floors
Feb 20, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to maintain/display on site documents required by chapter 33. noted: at time of my inspection of a new 8 sty bldg,construction in progress,bldg topped off,i observed a sidewalk shed at exp#1 approx 12ft
Feb 20, 2020
Resolve - Class - 1
Failure to have a construction superintendent present at site when required.at time of inspection on an 8 story new building observed that pat. a quintiliano ssm#m001382 who is the acting construction superinte
Oct 29, 2019
Resolve - Class - 2
Construction superintendent failed to duties per code.at time of inspection on a 8-story new building while construction operations were progress observed after further review of construction superintendent dai
Oct 29, 2019 · Penalty $2,500
Resolve - Class - 2
At the time of inspection crane user midwest steel,uservof crane cd#4599,cn #882/19 failed to notify the dept.of the crane's departure from site as is required by 3319-01(c)(s).there is an arrival notification
Jun 4, 2019
Resolve - Class - 2
Work does not conform to approved construction documents &/or approved amendments. @ time of insp of cn 1186/15, cd 3554 a 70 ton max capacity tower crane, observed on the the 3rd & 4th mast sections of the fre
Mar 23, 2018
Resolve - Class - 2
Failure to institute & maintain safety equipment measures & temporary construction. note: at the time of my inspection of a 8 sty bldg at 4th fl level,construction work in progress. i observed that there were
Mar 15, 2018 · Penalty $625
Resolve - Class - 1
Sec. 3307.7.5 design of fences. note: at the time of my inspection of a 8 sty bldg at 4th fl level,construction work in progress. i observed approx 200 feet of construction fence erected at exp#1 made of plasti
Mar 15, 2018 · Penalty $625
Resolve - Class - 1
Inadequate safety measures,operation of crane,hoisting equipment in anunsafe manner.at time of inspection mr.ronwahori,stacey was found suspended by the load line of tower crane cd#3690,cn#118716.mr.stacey was
Nov 1, 2017
Resolve - Class - 1
Inadequate safety measures,operation of crane,hoisting equipment in anunsafe manner.at time of inspection mr.ronwahori,stacey was found suspended by the load line of tower crane cd#3690,cn#118716.mr.stacey was
Nov 1, 2017
Resolve
Show 11 more ↓
- Class - 1
Inadequate safety measures,operation of crane,hoisting equipment in anunsafe manner.at time of inspection mr.ronwahori,stacey was found suspended by the load line of tower crane cd#3690,cn#118716.mr.stacey was
Nov 1, 2017
Resolve - Class - 1
Inadequate safety measures,operation of a crane hoisting equipment in an unsafe manner.at time of inspection mr.ronwahor,stacey was found suspended by the load line of tower crane cd#3690 cn#118716.mr.stacey wa
Nov 1, 2017
Resolve - Class - 1
27-132 superintendent of construction/inspection inadequate.designatedconstruction superintendent (semi-controller inspector) has not adequately discharges his responsibilities in that construction work has not
Dec 16, 2016
Resolve - Class - 1
27-132 superintendent of construction/inspection inadequate.designatedconstruction superintendent (semi-controller inspector) has not adequately discharges his responsibilities in that construction work has not
Dec 16, 2016
Resolve - Class - 2
Scaffoled erected w/o permit.noticed @time of inspection scaffold erected @exp#1 approx 50ft in height no permit on file.rem:stop all work obtain permit.
Jun 20, 2016
Resolve - Class - 2
Scaffold erected w/o permit noticed @time of inspection scaffold erected @exp#1 approx 50ft in height no permit on file.rem:stop all work obtain permit.
Jun 20, 2016
Resolve - Class - 2
Sidewalk shed erected w/o permit noticed @time of inspection sidewalk shed erected on site @exp#1 no permit on file.rem:stop all work obtainpermit.
Jun 20, 2016
Resolve - Class - 2
Scaffold erected w/o permit.noticed @time of inspection scaffold erected @exp#1 approx 50ft in height no permit on file.rem:stop all work obtain permit.
Jun 20, 2016
Resolve - Class - 2
Work w/o permit sidewalk shed.noticed @time of inspection sidewalk shed installed @exp#1 no permit on file.rem:stop all work obtain permit.
Jun 20, 2016
Resolve - Class - 2
Sidewalk shed erected w/o permit.noticed @time of inspection sidewalk shed erected @exp#1 w/o permit on file.rem:stop all work obtain permit.
Jun 20, 2016
Resolve - Non-hazardous
Altered building occupied without a valid certificate of occupancy(temp co#218540 ex june 17 1981), under alt. 919-89 remedy: obtain valid c of o.
May 26, 1994 · Penalty $350
Resolve
Complaints
- Heat/hot water
Entire building
Apr 23, 2015 · Apt 1B
Close - Unsanitary condition
Pests
Dec 26, 2014 · Apt 3B
Close - Paint/plaster
Ceiling
Jul 5, 2013 · Apt 2D
Close - Plumbing
Water-leaks
Jul 5, 2013 · Apt 2D
Close - Heating
Heat related
Nov 25, 2012 · Apt 3
Close - Heating
Heat related
Nov 22, 2012 · Apt 3FL
Close - Heating
Heat related
Nov 18, 2012 · Apt 3F
Close - Heating
Heat related
Oct 16, 2012 · Apt 1A
Close - Electric
Lighting
Aug 4, 2011 · Apt BLDG
Close - Heating
Heat related
Jan 15, 2010 · Apt 3B
Close
Show 15 more ↓
- Heating
Heat related
Dec 7, 2009 · Apt 3FL
Close - Plumbing
Water-leaks
Dec 7, 2009 · Apt 3FL
Close - Paint/plaster
Ceiling
Dec 7, 2009 · Apt 3FL
Close - Heating
Heat related
Nov 24, 2009 · Apt 3FL
Close - Plumbing
Water-leaks
Nov 24, 2009 · Apt 3FL
Close - Heating
Heat related
May 14, 2007 · Apt 3B
Close - Heating
Heat related
Dec 26, 2005 · Apt 4C
Close - Heating
Heat related
Dec 18, 2005 · Apt 4C
Close - Heating
Heat related
Jun 27, 2005 · Apt 3FL
Close - Electric
Lighting
Feb 15, 2005 · Apt BLDG
Close - Appliance
Sprinker cert
Jul 26, 2004
Close - Heating
Heat related
Oct 22, 2003 · Apt BLDG
Close - Heating
Heat related
Oct 6, 2003 · Apt 2B
Close - Plumbing
Water supply
Jun 28, 2003 · Apt /
Close - Nonconst
Rubbish
Mar 31, 2003 · Apt 4B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hospital / health (I1)
- Year built
- 2017
- Floors
- 7
- Residential units
- —
- Building area
- 427,208 ft²
- Lot area
- 56,395 ft²
- Zoning
- R6
- Community board
- 306
- Council district
- 39
- Block / lot
- 1084 / 39
- Assessed value
- $61,336,350
- Landmark / historic district
- No
HPD registration #317160, last renewed Oct 30, 2014.
Questions about 504 8 Avenue
Who owns 504 8 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Methodist Hospital Of Brooklyn.
Does 504 8 Avenue have violations?
Yes. NYC HPD has recorded 91 housing violations at this property.
Is 504 8 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 504 8 Avenue built?
City records list 2017 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.