222 16 Street is an elevator apartment building in Brooklyn, 11215. It has 32 residential units across 5 floors. The owner of record is 222 16th St LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 0
- ECB violations
- 22
- HPD complaints
- 0
Available now in this building
For sale1-bedroom condo for sale in south slope
New York, NY
For sale1-bedroom condo for sale in park slope
New York, NY
For sale2-bedroom condo for sale in south slope
New York, NY
For sale2-bedroom condo for sale in south slope
New York, NY
For sale3-bedroom condo for sale in south slope
New York, NY
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 0
No DOB violations on record
ECB violations · 22
- Class - 1
At the time of my inspection of a 5 story new building, i observed at exposure #1 yodock barrier on street that were not interlock and not full, failure to provide and maintain yodock barriers as per code creat
Apr 30, 2026 · Penalty $5,000
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. atoi, due to construction operations under job # b00989327-i1-gc exp 05/20/2026 for the exterior facade insulation system, i observed evidence
Apr 28, 2026
Resolve - Class - 2
Atoi observed removal of apx 85 feet long and 10 feet high brick retaining wall at the rear of adjacent property (230-224 16 street). no permit on file with dob, obtain all permits
Mar 9, 2026
Resolve - Class - 1
Observed active jobsite w/ unsafe street knuckle boom operations @ expo #1. outriggers on sidewalk, upon request for design dwgs of ground bearing capacity, non-provided. opposite riggers not fully extended. op
Sep 12, 2025 · Penalty $10,000
Resolve - Class - 1
Observd active jobsite w/ workers installing decking @ leading edge of roof level w/ out proper ppe and fall prevention methods. workers tied off to column rebars at their feet. stop all work roof level. 3301.5
Sep 12, 2025 · Penalty $5,000
Resolve - Class - 2
Observed active jobsite w/ excessive accumulation of construction debris on multiple floors. this creates a slip, trip and fire hazards. stop all accumulation of debris on site. provide and maintain housekeepin
Sep 12, 2025
Resolve - Class - 2
Observd active jobsite w/ 2 non-fire rated shanties installed @ 1st fl level expo #3 and 4. this creates a fire hazards. non-fire-rated shanties not allowed as per bc3303.1.stop all shanty construction. provide
Sep 12, 2025 · Penalty $2,500
Resolve - Class - 2
Observd active jobsite w/ inadequate site safety plans, ssp does not clarify adequate street operations, placement of washout base, knuckle boom operations. cs tried to modify ssp with site revision. field revi
Sep 12, 2025 · Penalty $2,500
Resolve - Class - 1
Observd active jobsite w/ rigging supervisor jhany vasquez serrano 4q09242242 for knuckle boom operations failed to perform duties. observed hoisting operation w/ rigging supervisor did not ensure pick location
Sep 12, 2025 · Penalty $5,000
Resolve - Class - 1
Observd active jobsite w/ excessive amounts of material stored against set in place reshores on multiple floors and location. reshores are installed to carry vertical loads and not eccentric loads for materials
Sep 12, 2025 · Penalty $5,000
Resolve
Show 12 more ↓
- Class - 1
Observed active jobsite w/ no rigging certification for all rigging crew members at time of inspection. 16hr rigging cert. required. 32hr supervisor required. logs required. upon request for documentation only
Sep 12, 2025 · Penalty $5,000
Resolve - Class - 1
Observd active jobsite w/ construction superintendent failed to correct unsafe conditions. observed unsafe street hoisting operations, super did not verify riggers information. hoisting w/ out adequate flaggers
Sep 12, 2025 · Penalty $5,000
Resolve - Class - 2
Failure to provide protection of adjoining property. observed at exp#3 at 4fl working deck working on supported scaffold and stripping of the 3fl formwork. upon review of ssp-101.00 observed rear 12' structure
Sep 8, 2025 · Penalty $2,500
Resolve - Class - 2
New 5 story building .observed site close no ongoing construction activity upon inspection found sws erected on exposure 1 ., and noted it contrary to approved drawings on exposure 4 ,
Aug 30, 2025
Resolve - Class - 2
5 story new building . observed: site closed no ongoing construction activity upon inspection noted : a gap existent on exposure 2 with adjacent property 224 16 st creating hazards for adjoint property owners a
Aug 30, 2025 · Penalty $2,500
Resolve - Class - 1
1704.1 record keeping. observed jobsite at soe phase, upon reviewing the department records, no designation of sia, no tr1 filled under application b00989327-i1 & subsequents applications. sia & reports on site
Jul 10, 2025 · Penalty $625
Resolve - Class - 2
At time of inspection of a five-story new residential building, observed roadway in front of jobsite occupied with barriers. upon review of department records, dot permit for roadway occupancy was found to have
Jun 14, 2025 · Penalty $2,500
Resolve - Class - 1
At time of inspection of a five-story new residential building, observed roadway in front of jobsite occupied with barriers. barriers were not in compliance with manufacturer specifications. barriers were loose
Jun 14, 2025 · Penalty $2,500
Resolve - Class - 2
Observed several man working on roof level. upon request to enter site no access was granted. stop all work under permit b00989327.
May 8, 2025
Resolve - Class - 2
Job site construction fence is not secured by lock and open to unauthorized entry., comply with code
Mar 5, 2025 · Penalty $1,000
Resolve - Class - 2
At time inspection, observed opened construction fence permit b01081448-fn gate with no lock or chain. no workers or security on site. unsecured site allows public to enter. site must be maintained secured and
Feb 13, 2025
Resolve - Class - 2
Work w/o a permit. advertising sign that reads "parking in park slope"attached to house approx 2'wide by 8'high. remedy: obtain permits or remove sign.
Jul 9, 2014
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- —
- Floors
- 5
- Residential units
- 32
- Building area
- 37,274 ft²
- Lot area
- 18,680 ft²
- Zoning
- R6B
- Community board
- 307
- Council district
- 39
- Block / lot
- 1053 / 39
- Assessed value
- $1,337,850
- Landmark / historic district
- No
Questions about 222 16 Street
Who owns 222 16 Street?
The owner of record in NYC Department of City Planning PLUTO data is 222 16th St LLC.
Does 222 16 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 222 16 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
How many apartments are in 222 16 Street?
It has 32 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.