306 6 Avenue
Brooklyn, NY 11215BBL 3-00975-0039Map
Owner of record: 306 6th Ave LLC
306 6 Avenue is a religious facility built in 1910 in Brooklyn, 11215. The owner of record is 306 6th Ave LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 16
- ECB violations
- 29
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 16
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Immediate emergency anythingoptional
Restore the sidewalk shed to code-complaint condition-reset or replace all displaced parapet panels, re-secure or replace damaged q-decking, and clear debris-before reopening the area to pedestrian use
Jul 31, 2025
Dob violation - dismissed - Construction other optional
Structure rendered non compliant due to vehicle impacting shed. at time of inspection shed was in state of disrepair due to truck striking structure, approximately 32 linear feet of panels were dislodged along with bent uprights and damaged cables for lighting.
Jul 30, 2025
Dob violation - active - Construction other optional
Ftm.masonry pier@1/2 crnr was spallng,crckd,bulgng out,w/tree growng out top.various spallng@exp1,3,&4 throughout.top of belltower are exp 1/4 prtlly dtachd w/temp nettng in place.masonry flying.immediately comply w/commissioner's order #343188 (091423feu30602pn)dated 9/14/23 to repair the bldg undr prmt
Oct 2, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Construction other optional
Ftm.masonry pier@1/3 crnr was spallng,crckd,bulgng out,w/tree growng out top.various spallng@exp1,3,&4 throughout.top of bell tower are.exp 1/4 prtlly dtachd w/temp nettng in place.masonry flying.ownr to rtain nys pe to eval ent bldg&file rpair dwgs.bldg to be perm rpaird undr prmt strtng by 10/30/23&cmpltd/signed
Sep 14, 2023
Dob violation - active - Immediate emergency anythingoptional
Erect approximately 100ft of sidewalk shed at exposure 1(6 avenue)and
Aug 21, 2023
Dob violation - active - Immediate emergency anythingoptional
Erect approximately 100ft of sidewalk shed at exposure 1 (6 avenue) and approximately 90ft of sidewalk shed at exposure 4 (2nd street) to protect the public and property
Aug 21, 2023
Dob violation - active - Construction other optional
At time of inspection observed at exp#4 bricks and pieces of stone falling from parapet wall onto pedestrian sidewalk and 2nd street damaged two cars. from street point visible displaces unsecured bricks remain at this area and in danger to future collapse which approx 65 feet height.
Aug 18, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed
Show 6 more ↓
- Construction other optional
Church is a 2 story building with preschool on 1st fl. and basement. a 4' section fell injuring one person. loose plaster throughout, cracks in exterior allowing water infiltration, and rotten flooring in exit passage creat unsafe conditions throughout.
Apr 30, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Aug 31, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
ECB violations · 29
- Class - 1
At the time of my inspection, i observed sidewalk shed and supported pipe scaffold in place at exposure #1 and 4 sidewalk shed have a permit but scaffold have no permit to display on dob records. failure to obt
Jun 30, 2026
Resolve - Class - 2
At time of inspection observed sidewalk shed installed at exposure#1 #4 missing project information panel contrary to bc 3301.9.2 creating an unsafe condition for public and occupied adjoining properties in cas
Apr 6, 2026 · Penalty $3,125
Resolve - Class - 2
Violation issued, expired shed permit#boo926193, exp. 08/14/25, renew permit; renew permit
Aug 26, 2025 · Penalty $3,125
Resolve - Class - 1
Failure to comply with the commissioner's order in dob violation vio23-01237,dated 4/30/2023.respondent was required to submit an engineer'sreport concerning structurally deficient conditions.as of 10/11/2023,a
Oct 11, 2023
Resolve - Class - 2
At time of inspection after responding to complaint i observed a sidewalk shed partial installed at exposure 1&4 (currently missing parapets). after reviewing department records in bis and dob now i observed th
Aug 19, 2023
Resolve - Class - 2
Atoi after responding to complaint i observed a sidewalk shed partial installed at exposure 1&4 (currently missing parapets). during inspection i observed 1 worker on site currently installing electric lighting
Aug 19, 2023
Resolve - Class - 1
At time of inspection observed at exp#4 bricks and pieces of stone falling from parapet wall onto pedestrian sidewalk and 2nd street damaged two cars. from street point visible displaces unsecured bricks remain
Aug 18, 2023
Resolve - Class - 1
Church being used as a preschool at 1st fl. & basement. an individual was injured by 4' section of falling plaster. loose ceiling plaster has put egress path 1st/2nd fl. in a collapse zone. egress from basement
Apr 30, 2023 · Penalty $6,250
Resolve - Class - 1
Building is a place of worship also used as preschool where a 4x4 ft section of plaster feel from cieling hospitalizing one person. plaster is loose throughoutbuilding, cracks alone exterior allow water infiltr
Apr 30, 2023 · Penalty $6,250
Resolve - Class - 2
Boiler leaking at lower left side front.
Jun 8, 2022 · Penalty $625
Active
Show 19 more ↓
- Class - 2
Failure to maintain bldg in code-compliant manner.illumination for exits,exit discharges & public corridors per 1006.1;27-381.noted:at firstfl playroom & corridor,existing emergency lights not operational when
May 5, 2021 · Penalty $1,562
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner no fire stopping perbc712.3;27-345.observed:observed cables,pipes penetrating through walls,ceiling from corridors to gas meter room w/no fire stopping provided
May 5, 2021 · Penalty $1,280
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner.observed:at the cellar level electrical room,gas meter room & other mechanical room excessive storage of paint cans wooden materials,plastic boxes,clothing,wood
May 5, 2021 · Penalty $1,562
Resolve - Class - 2
28.301.1 failure to provide ventilation to gas meter room per p 115.6 (1968 code),f6c appendix e(e4)(2014 code).noted:at the cellar level gas meter room has no mechanical or natural ventilation.remedy:comply w/
May 5, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35372728l issued on 12-07-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner. remedy: comp
Jun 6, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35355632z issued on 09-08-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner.
Jun 6, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply with the commissoner's order contained in summons/violation #35372738l issued on 12/07/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.note:mo doc file for
Jan 19, 2019 · Penalty $3,125
Resolve - Class - 1
Failure to maintain building in code compliant manner. noted: observedat exposure #1 that the gutter was in disrepair, with a section hanging. remedy: repair and/or replace
Dec 7, 2018 · Penalty $6,250
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35355632z issued on 9/8/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for gutter at exposure#2 in
Oct 25, 2018 · Penalty $3,125
Resolve - Class - 1
Failure to maintain building in code compliant manner.at the time of inspection it was observed that gutter at exposure 2 was in disrepair with section.hanging and dislodged from building.observed missing skyli
Sep 8, 2018 · Penalty $3,125
Resolve - Class - 2
5a,6a,25b,50. 50-loose cement at flue to chimney connection.
Jul 3, 2018 · Penalty $655
Resolve - Class - 2
Failure to maintain bldg in code compliant mannner: no fire stopping per bc 712.3;27-345. at the time of inspection in the kitchen at the basement/cellar area there are 3 holes which pipes runs through large en
May 9, 2017 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: illumination for exit discharges & public corridors per bc 1006.1;27-381. at the time of inspection 1 in basement/cellar,1 in playroom.1 in exit to 2nd street
May 9, 2017
Resolve - Class - 2
Sec. 28-301.1 unlawful placement of furnishings,decorations,or other objects at exits that obstruct access to egress from or visibility thereof per fdny 2008 codes: fc 1027.4 at the time of inspection there are
May 9, 2017
Resolve - Class - 2
Sec. 3307.6.6 failure to maintain adequate illumination beneath sidewalk shed as required by code. noted: sidewalk shed erected under job#340300347 along exposure 6 ave has 4 inoperable bulbs endering affected
Jan 10, 2016
Resolve - Class - 2
B254,12a,16,21b,35b,50,50a. 50-oil leak and oil soaked material under burner; 50a-openings in ceiling of oil tank room, also storage in tankroom also tank room sign missing.
Jun 29, 2015 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg walls or appurtenances.noted:spalling/chipping of brick thru out all exposures of the bldg.facaded missing window galss and molding around the steeple.
May 8, 2015 · Penalty $500
Resolve - Class - 2
B254,10a,15,50a,50b,50c,50d,50e,50f. 50a-boiler sections need to be cleaned out; 50b-flue pipe not properly sealed to chimney;50c-fire chamber brick in need of repair; 50d-boiler sections need to be resealed
Oct 17, 2014 · Penalty $530
Resolve - Class - 2
5 15 16 21a 32a 36 37 38 39 40 24b 50a-remove all storage 50b-excessive soot condition 50c-flue pipe 50d-boiler missing sections of insolation covering child care center has space in the bldg
Apr 15, 2011 · Penalty $500
Resolve
Complaints
- Unsanitary condition
Pests
Aug 6, 2026 · Apt BASEME
Close - Unsanitary condition
Pests
Aug 3, 2026 · Apt ALL
Close - Heating
Heat related
Nov 24, 2013 · Apt NA
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Religious facility (M1)
- Year built
- 1910
- Floors
- 1
- Residential units
- —
- Building area
- 6,800 ft²
- Lot area
- 7,200 ft²
- Zoning
- R6B
- Community board
- 306
- Council district
- 39
- Block / lot
- 975 / 39
- Assessed value
- $698,400
- Landmark / historic district
- No
Questions about 306 6 Avenue
Who owns 306 6 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 306 6th Ave LLC.
Does 306 6 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 306 6 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 306 6 Avenue built?
City records list 1910 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.