Violations at 323 3 Avenue
Brooklyn, NY 11215 · BBL 3-00968-0001 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
37 DOB violations, newest first.
- Plumbing none
Prohibited bushings used on gas pipe for 2 separate gas fired space heaters
Aug 21, 2019
Dob violation - active - Construction other optional
Emg wrk cond:1st wd frm,service gar.type struct w/wood bowstring truss roof extend full length of lot.at south end 1 wd truss is struct compr w/split in the bottom chord&slip of the thru bolts&westermost splice struct integ of roof local compr&at risk of collap.own imm hire pe dir instl of shor perf by lic contr w/contin monitor.obt prmt 2 buss days
Jun 6, 2019
Dob violation - dismissed - Construction other optional
Ftm:warehouse type structure witha wood bowstring truss roof received engineering report 3/27/2015 which recommends repairs to the wood bowstring truss roof no jobs filed with dob@that address remedy:repair dwgs prepared by lic pe to be filed with dob no later than 2/1/19 work under pmt begin no later than 2/8/19 work complete&signed off 4/1/19
Dec 28, 2018
Dob violation - active - Construction other optional
Ftm cond.warehouse type struct w/wood bowstring truss roof.we receive eng'r rpt prep by stantec 3/27/15.rpt recommends repair to wood bow string truss roof.no jobs file w/dob that adress this recommendation remedy:repair dwgs prep by lic pe to be filed w/dob no later 11/3/17 work und perm beg no later 11/10/17.substant comp&sign off by 12/15/17
Oct 6, 2017
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2016
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Construction other optional
Failure to comply with commissioner's order. the bldg has a wood bow- string truss roof. the department served you a curable comm. order (notice of violation) on 5/13/2014 to produce an engr report on your bldg. no engr report has been received. comply per the commisioner's order
Jul 31, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Construction other optional
Occupied 1 story garage w/wood bowstring truss.within 60 days of date of violation owner to engage a nys licensed pe experience w/wood trusses to probe and evaluate structural soundness of bowstring using field verifications,calculations,probes etc.each truss & bearing to be evaluated.any deficiencies to be immediately shored.repair dwgs
May 13, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 17, 2013
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2012
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 11, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2008
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 14, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Construction other optional
C-construction other optional
Aug 8, 1995
Vw-violation work without permit - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - active
ECB violations
12 ECB violations, newest first.
- Class - 2
At time of inspection observed sidewalk shed installed at exp3. upon reviewing provide sws drawing, sws does not conform to drawings. parapet to be solid and with posted info panel. as per 3307.6.4.6 demo site
May 11, 2026 · Penalty $1,250
Resolve - Class - 2
At time of inspection observed construction fence installed at all exposure. construction fence installed at exp3 which site on a public sidewalk is missing required viewing panels as per bc 3307.7.3install vie
May 11, 2026 · Penalty $1,000
Resolve - Class - 2
Pedestrian protection does not meet code specifications. note: atoi observed t exp #1 south and exp #4 east elev defective/inadequate conditions such as defective loose parapet panels and broken mudsills. remed
Jun 11, 2025
Resolve - Class - 1
Failure to provide unobstructed exit passageway. note: observed at exp#1 south elv a blocked fire egress at fire escape drop ladder. remedy:remove obstruction.
Jun 11, 2025
Resolve - Class - 2
Expired sidewalk shed permit. expired sidewalk shed, no valid dob permit on bis or dob now. remedy: renew permit.
Jun 11, 2025
Resolve - Class - 1
05x10, 02x10. 05x10-repair door zone lock; 02x70-repair emergency phone.
Dec 11, 2018 · Penalty $1,250
Resolve - Class - 2
28-104.7.11,failure to comply w/ a comm's order.the bldg is a warehouse-type structure w/ a wood bowstring truss roof.the respondant did notprovide an engineer's report as required by comm's order 051314cfeu306
Jan 28, 2015 · Penalty $2,000
Resolve - Class - 2
Fail to obtain temp construction permit prior to install of sdwlk shednoted:there are installation of sdwlk shed in progress & dob records shows no permit for sdwlk shed has been obtained.rem:obtain shed permit
Dec 29, 2009 · Penalty $2,500
Resolve - Hazardous
Cease use.07m07-provide missing safety edge.
May 2, 2007 · Penalty $2,500
Active - Non-hazardous
Failure to post contractor's sign. noted: soft (approx) sidewalk shed,erected under app. #103141869 is w/o any contractor's sign. remedy: provide contractor's sign immediately.
Feb 22, 2006 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain exterior bldg wall. defect is: vertical, horizontal & step cracks in many various areas of bldg on all 4 sides.also bulging, spalling & broken bricks west side of bldg.
Jul 8, 1999 · Penalty $350
Active - Non-hazardous
Failure to maintain exterior bldg wall. defect is: vertical, horizontal & step cracks in many various areas, all 4 sides of bldg. also some bulging in various areas. most damage is on the east side o
Jul 8, 1999 · Penalty $350
Active