806 President Street
Brooklyn, NY 11215BBL 3-00960-0037Map
Owner of record: Townhouse Rental, L.l.c.
806 President Street is a walk-up apartment building built in 1920 in Brooklyn, 11215. It has 8 residential units across 3 floors. The owner of record is Townhouse Rental, L.l.c.. HPD has recorded 79 housing violations here, most recently on August 30, 2026. 1 of the 50 most recent violations are still open.
- HPD violations
- 79
- DOB violations
- 36
- ECB violations
- 15
- HPD complaints
- 83
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 79
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard
Aug 30, 2026
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the shower stall in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
May 5, 2026 · Apt 2B
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 2b, 2nd story, 1st apartment from east at south
May 5, 2026 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the foyer located at apt 2f, 1st story, 1st apartment from west at north
Sep 7, 2025 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 2f, 1st story, 1st apartment from west at north
Sep 7, 2025 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2f, 1st story, 1st apartment from west at north
Sep 7, 2025 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2f, 1st story, 1st apartment from west at north
Sep 7, 2025 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2f, 1st story, 1st apartment from west at north
Sep 7, 2025 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed
Show 40 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 13, 2015
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration laundry created in bulkhead landing with washing machine, dryer & water heater . , 3rd story
Jul 23, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 24, 2015
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mailboxes at public hall, 1st story
Feb 21, 2014
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2r, 2nd story, apartment at south
Feb 21, 2014 · Apt 2R
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2r, 1st story, apartment at south
Feb 21, 2014 · Apt 2R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 2r, 1st story, apartment at south
Feb 21, 2014 · Apt 2R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3r, 2nd story, 1st apartment from west at north
Jul 26, 2009 · Apt 3R
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3r, 2nd story, 1st apartment from west at north
Jul 26, 2009 · Apt 3R
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the entire apartment located at apt 3r, 2nd story, 1st apartment from west at north
Jul 26, 2009 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective upper and lower sash and glass pane and jamb in the kitchen located at apt 3r, 2nd story, 1st apartment from west at north
Jul 26, 2009 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective upper and lower sash and glass pane and window jamb in the bathroom located at apt 3r, 2nd story, 1st apartment from west at north
Jul 26, 2009 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed on door in the entrance located at apt 2f, 1st story, 1st apartment from west at north
Jun 20, 2009 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the entire apartment located at apt 2f, 1st story, 1st apartment from west at north
Jun 20, 2009 · Apt 2F
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2f, 1st story, 1st apartment from west at north
Jun 20, 2009 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Refit and make operable windows throughout (upper and lower sashes) in the entire apartment located at apt 2f, 1st story, 1st apartment from west at north
Jun 20, 2009 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door to boiler room
Dec 2, 2008
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at 1st story public hall , and boiler room door
Dec 2, 2008
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2r, 1st story, 1st apartment from east at south
Dec 2, 2008 · Apt 2R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2r, 1st story, 1st apartment from east at south
Dec 2, 2008 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed at door in the entrance located at apt 2f, 2nd story, apartment at west
Sep 20, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2f, 2nd story, apartment at west
Sep 20, 2007 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 2f, 2nd story, apartment at west
Sep 20, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 2f, 2nd story, apartment at west
Sep 20, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective ceiling light fixfure in the 1st room from north located at apt 2f, 2nd story, apartment at west
Sep 20, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective wall cabinet in the kitchenette located at apt 2f, 2nd story, apartment at west
Sep 20, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
Replace with new the missing missing lock at entrance door to apartment in the entire apartment located at apt 2f, 1st story, 1st apartment from south at west
Sep 19, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
Remove the illegal fastening double cylinder key operated lock at entrance door to apartment in the entire apartment located at apt 2f, 1st story, 1st apartment from south at west
Sep 19, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2f, 1st story, 1st apartment from south at west
Sep 19, 2007 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings, walls and trim throughout in the entire apartment located at apt 2f, 1st story, 1st apartment from south at west
Sep 19, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2f, 1st story, 1st apartment from south at west
Sep 19, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroom located at apt 2f, 1st story, 1st apartment from south at west
Sep 19, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of evidence of water leak at ceiling and south wall in the bathroom located at apt 2f, 1st story, 1st apartment from south at west
Sep 19, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective wall cabinet at east wall in the kitchen located at apt 2f, 1st story, 1st apartment from south at west
Sep 19, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the kitchen located at apt 2f, 1st story, 1st apartment from south at west
Sep 19, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of evidence of water leak at ceiling and east wall in the kitchen located at apt 2f, 1st story, 1st apartment from south at west
Sep 19, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 2f, 1st story, 1st apartment from south at west
Sep 19, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of evidence of water leak at ceiling in the 1st room from north located at apt 2f, 1st story, 1st apartment from south at west
Sep 19, 2007 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective walls and ceilings with fire retardant matreial. at public hall, 3rd story
Jun 21, 2006
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings. at public hall, 3rd story
Jun 21, 2006
Closed — Violation closed
DOB building violations · 36
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed
Show 26 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 28, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 20, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 20, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 20, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 15
- Class - 2
Failure to comply with commissioner's order to file a certificate of correction with the department of buildings.respondent failed to complywith commissioner's order for violation#35462377y issued on 2/5/2020.
Jun 16, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order to file a certificate of correction with the department of buildings.respondent failed to complywith commissioner's order for violation#35462249j issued on 2/5/2020.
Jun 16, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order to file a certificate of correction with the department of buildings.respondent failed to complywith commissioner's order for violation#35462376m issued on 2/5/2020.
Jun 16, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order to file a certificate of correction with the department of buildings.respondent failed to complywith commissioner's order for violation#35462375k issued on 2/5/2020.
Jun 16, 2021 · Penalty $1,250
Resolve - Class - 1
Occupancy contrary to that allowed by cofo#151123.illegal occupancy noted at cellar level of basement rear apartment occupied as a bedroom with 3pcs bathroom.dob records indicate cellar approved for storage.rem
Feb 5, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in code compliant manner failure to provide the required number of means fo egress per every floor per bc 1018.1(2008) 27-366 ,bc1027.1(2014) for bedroom at cellar level of baseme
Feb 5, 2020 · Penalty $6,250
Resolve - Class - 1
Work without a permit.work noted:at cellar level of basement rear apartment noted (1)full height partitions erected to create 3pcs bathroom(2)plumbing work of waste and water lines (3)electrical work for light
Feb 5, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in a code compliant manner.failure to provide the required light and ventilation for every bathroom.at cellar level of basement rear apartment having create 1 bedroom without natura
Feb 5, 2020 · Penalty $1,250
Resolve - Class - 1
File a certificate,form,application etc. containing a material false statements false statements. noted: at time of inspection observed a 2 sty extension at rear site of the bldg at basement & 1st fl. under job
Feb 24, 2015
Resolve - Class - 1
Work w/o permit. work noted: at exp#3 installed a 2 sty extension under job #324204184. installed new gas lines for gas dyers on 1st fl 2 apts. installed gas water heaters at cellar & water & waste lines for 3
Feb 24, 2015
Resolve
Show 5 more ↓
- Class - 2
Zr 23-47. minimum required of rear yard not conforming. noted: an illegal extension at basement and 1st flr erected at exp#3 (rear yard) leaving 21'5" rear yard.premises is on r6b-r6a residential district and
Feb 24, 2015
Resolve - Class - 2
Work does not conform to approved construciton documents &/or approvedamendments. noted: at cellar level installed 2 bathrooms from & rear side w/sink,toilet & shower. at 1st fl staircase is not built as per
Feb 24, 2015 · Penalty $500
Resolve - Class - 1
Work no permit observed on feb 24,2015 at 3:30pm new sprinkler system install floors cel-roof no dob permit on records. new piping,controls electric sp heads,supports.rmdy:obtain a permit or restore to prior
Feb 24, 2015
Resolve - Class - 1
Work no permit observed on feb 24, 2015 at 3:30pm, new sprinkler system installed floors-cel-roof, no dob permit on record - new piping controls, electric, sp. heads & supports. previous violation - 35115125l -
Feb 24, 2015
Resolve - Class - 2
Work without a permit noted: am wood frame/siding with flat roof structure approx. 10ft x 20ft x 19ft is built without permit at rear on basement( ground floor) level. rem: obtain permit or restore premises to
Sep 18, 2008 · Penalty $4,000
Resolve
Complaints
- Paint/plaster
Ceiling
Oct 19, 2026 · Apt 1A
Open - Unsanitary condition
Pests
Oct 19, 2026 · Apt 1A
Open - Safety
Fire escape
Oct 19, 2026 · Apt 1A
Open - Appliance
Electric/gas range
Aug 21, 2026 · Apt 3B
Close - Paint/plaster
Cabinet
Aug 21, 2026 · Apt 3B
Close - Door/window
Door
Aug 21, 2026 · Apt 3B
Close - Unsanitary condition
Garbage/recycling storage
Jun 13, 2026 · Apt BLDG
Close - Water leak
Slow leak
Feb 26, 2026 · Apt 1B
Close - Water leak
Heavy flow
Feb 26, 2026 · Apt 1B
Close - Plumbing
Bathtub/shower
Feb 12, 2026 · Apt 2B
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
Feb 12, 2026 · Apt 2B
Close - Appliance
Electric/gas range
Dec 6, 2025 · Apt 2B
Close - Flooring/stairs
Floor
Dec 6, 2025 · Apt 2B
Close - Appliance
Electric/gas range
Nov 25, 2025 · Apt 2B
Close - Plumbing
Bathtub/shower
Nov 25, 2025 · Apt 2B
Close - Unsanitary condition
Sewage
Sep 2, 2025 · Apt 2F
Close - Unsanitary condition
Sewage
Jul 1, 2025 · Apt 2F
Close - General
Cooking gas
May 28, 2019 · Apt 2F
Close - Appliance
Electric/gas range
May 28, 2019 · Apt 2F
Close - Safety
Fire escape
Jan 23, 2019 · Apt BLDG
Close - Safety
Fire escape
Jan 22, 2019 · Apt BLDG
Close - Plumbing
Water supply
Oct 6, 2017 · Apt 4R
Close - Plumbing
Water supply
Oct 6, 2017 · Apt 4R
Close - Water leak
Slow leak
Jul 24, 2017 · Apt 4R
Close - Heating
Heat related
Mar 1, 2014 · Apt NA
Close - Heating
Heat related
Feb 28, 2014 · Apt 2F
Close - Heating
Heat related
Feb 25, 2014 · Apt 2F
Close - Heating
Heat related
Feb 20, 2014 · Apt NA
Close - Heating
Heat related
Feb 19, 2014 · Apt 2R
Close - General
Mailbox
Jan 23, 2014 · Apt 2F
Close - Plumbing
Basin/sink
Aug 2, 2012 · Apt 3R
Close - Plumbing
Toilet
Aug 2, 2012 · Apt 3R
Close - Paint/plaster
Ceiling
Aug 2, 2012 · Apt 3R
Close - Paint/plaster
Ceiling
Aug 2, 2012 · Apt 3R
Close - Paint/plaster
Ceiling
Aug 2, 2012 · Apt 3R
Close - Paint/plaster
Ceiling
Aug 2, 2012 · Apt 3R
Close - Construction
Rain leader
May 18, 2012 · Apt 3F
Close - Heating
Heat related
Nov 7, 2011 · Apt 2R
Close - Heating
Heat related
Dec 7, 2010 · Apt 2R
Close - Heating
Heat related
Dec 6, 2010 · Apt 2R
Close - Heating
Heat related
Dec 6, 2010 · Apt 2R
Close - Heating
Heat related
Nov 1, 2010 · Apt 2R
Close - Plumbing
Basin/sink
May 9, 2010 · Apt 3F
Close - Plumbing
Basin/sink
May 9, 2010 · Apt 3F
Close - Plumbing
Basin/sink
May 9, 2010 · Apt 3F
Close - Plumbing
Basin/sink
Apr 12, 2010 · Apt 3F
Close - Plumbing
Water supply
Feb 28, 2010 · Apt 3F
Close - Electric
Electric-supply
Feb 28, 2010 · Apt 3F
Close - Heating
Heat related
Feb 28, 2010 · Apt 3F
Close - General
Windows
Jul 3, 2009 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 3
- Residential units
- 8
- Building area
- 3,400 ft²
- Lot area
- 1,875 ft²
- Zoning
- R6B
- Community board
- 306
- Council district
- 39
- Block / lot
- 960 / 37
- Assessed value
- $1,091,700
- Landmark / historic district
- No
HPD registration #340899, last renewed Jul 16, 2026.
Questions about 806 President Street
Who owns 806 President Street?
The owner of record in NYC Department of City Planning PLUTO data is Townhouse Rental, L.l.c..
Does 806 President Street have violations?
Yes. NYC HPD has recorded 79 housing violations at this property.
Is 806 President Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 806 President Street built?
City records list 1920 as the year it was built.
How many apartments are in 806 President Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.