646 President Street
Brooklyn, NY 11215BBL 3-00958-0039Map
Owner of record: 646 President Street Associates, LLC
646 President Street is a walk-up apartment building built in 1920 in Brooklyn, 11215. It has 12 residential units across 4 floors. The owner of record is 646 President Street Associates, LLC. HPD has recorded 191 housing violations here, most recently on September 10, 2026. 25 of the 50 most recent violations are still open.
- HPD violations
- 191
- DOB violations
- 7
- ECB violations
- 14
- HPD complaints
- 328
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 191
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 3c, 3rd story, 2nd apartment from east at south
Sep 10, 2026 · Apt 3C
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3c, 3rd story, 2nd apartment from east at south
Sep 10, 2026 · Apt 3C
Open — Civ14 mailed - BHazardous
Replace with new the missing escutcheon plate at heat riser at ceiling in the kitchen located at apt 3c, 3rd story, 2nd apartment from east at south
Sep 10, 2026 · Apt 3C
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective latch and its assemblies at building entrance door at 1st story
Sep 10, 2026
Open — Certification postponment denied - BHazardous
Properly repair or replace the broken or defective latch and its assemblies at vestibule door at public hall at 1st story
Sep 10, 2026
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at west wall at public hall at 2nd story
Sep 10, 2026
Open — Certification postponment denied - ANon-hazardous
Replace with new the missing electrical outlet safety cover at west wall at public hall at 1st story
Sep 10, 2026
Open — Nov sent out - ANon-hazardous
Replace with new the missing electrical outlet safety cover at west wall at public hall at 3rd story
Sep 10, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the 1st room from north located at apt 3c, 3rd story, 2nd apartment from east at south
Sep 10, 2026 · Apt 3C
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 3c, 3rd story, 2nd apartment from east at south
Sep 10, 2026 · Apt 3C
Open — Certification postponment denied
Show 40 more ↓
- ANon-hazardous
Replace with new the missing electrical outlet safety cover at west wall at public hall at 2nd story
Sep 10, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall at public hall at 2nd story
Sep 10, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 3c, 3rd story, 2nd apartment from east at south
Aug 26, 2026 · Apt 3C
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north and east walls in the 1st room from north located at apt 3c, 3rd story, 2nd apartment from east at south
Aug 26, 2026 · Apt 3C
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective elictrical outlet at north wall in the 1st room from north located at apt 3c, 3rd story, 2nd apartment from east at south
Aug 26, 2026 · Apt 3C
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective glazing at bathtub in the bathroom located at apt 3c, 3rd story, 2nd apartment from east at south
Aug 26, 2026 · Apt 3C
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 3c, 3rd story, 2nd apartment from east at south
Aug 26, 2026 · Apt 3C
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3c, 3rd story, 2nd apartment from east at south
Aug 26, 2026 · Apt 3C
Open — Invalid certification - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3c, 3rd story, 2nd apartment from east at south
Aug 26, 2026 · Apt 3C
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from north located at apt 3c, 3rd story, 2nd apartment from east at south
Aug 26, 2026 · Apt 3C
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3c, 3rd story, 2nd apartment from east at south
Aug 26, 2026 · Apt 3C
Open — Certification postponment denied - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 2nd apartment from east at south
Aug 26, 2026 · Apt 3C
Open — Certification postponment denied - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3c, 3rd story, 2nd apartment from east at south
Aug 26, 2026 · Apt 3C
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3c, 3rd story, 2nd apartment from east at south
Aug 26, 2026 · Apt 3C
Open — Civ14 mailed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 4b, 4th story, 1st apartment from east at south
Nov 21, 2023 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Nov 8, 2023 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Nov 8, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 9, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling leading to roof at public hall, 4th story
Jan 27, 2021
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling leading to roof at public hall, 4th story
Jan 27, 2021
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes dropladder obstructed with storage bin at building front
Jun 27, 2019
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum required 100 watts (light fixture present) at front areaway, 1st story
Jun 8, 2019
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Nov 3, 2016
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... all walls & ceiling-approximately 10 sq ft in the bathroom located at apt 2l, 2nd story, apartment at south
Nov 3, 2016 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls & ceiling in the bathroom located at apt 2l, 2nd story, apartment at south
Nov 3, 2016 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at riser in the bathroom located at apt 2l, 2nd story, apartment at south
Nov 3, 2016 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 2nd room from north located at apt 2l, 2nd story, apartment at south
Nov 3, 2016 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Refit lower window sash in the 1st room from north located at apt 2l, 2nd story, apartment at south
Nov 3, 2016 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls & ceiling in the private hallway located at apt 2l, 2nd story, apartment at south
Nov 3, 2016 · Apt 2L
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice located at apt 2l, 2nd story, apartment at south
Nov 3, 2016 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at east wall in the kitchen located at apt 2l, 2nd story, apartment at south
Nov 3, 2016 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Refit lower window sash in the kitchen located at apt 2l, 2nd story, apartment at south
Nov 3, 2016 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... ...at step leading to room north/east/3....basement level of duplex ..approximatelly 1 sq ft in the 2nd room from north located at apt 1c, 1st story, 2nd apartment from east at south
Apr 14, 2016 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 9, 2015
Closed — Violation dismissed - BHazardous
Replace with new the missing cover for electrical outlet at west wall at public hall, 1st story
Oct 28, 2015
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective mortise lock at entrance door to bldng at public hall, 1st story
Oct 28, 2015
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 13, 2015
Closed — Violation dismissed
DOB building violations · 7
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 23, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 15, 2010
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed
ECB violations · 14
- Class - 2
Failure to provide approved/accepted plans at job site at time of inspection.at time of inspection workers at site failed to provide plans for alt#ii application #340099128 for interior renovation at 1st and
Dec 13, 2013
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: noted above 4th flrwindows at facade, metal sheathing has peeled off of facade and is in danger of falling. remedy: repair/replace.
Jun 28, 2012 · Penalty $2,500
Resolve - Class - 1
Failure to comply w/the comm's order contained in nov#34807223x issuedon 12/2/09 for work w/o a permit.erected partition walls @ the cellar level.no record of correction in the bldg dept.rem:comply w/the comm's
Sep 17, 2011 · Penalty $12,000
Resolve - Class - 1
Failure to comply w/ the comm order contained in nov#34807223x issued 12/2/09 for illegal apt in cellar rem: comply w/ the comms order
Jul 14, 2011 · Penalty $2,400
Resolve - Class - 1
Unlawful acts.failure to comply w/an order of the comm's.respondent failed to correct the conditions cited in nov#34807223x.@ cellar created a class"a"apt.rem:comply w.comm's
Mar 14, 2011 · Penalty $24,000
Resolve - Class - 1
Failure to comply w/an order of the commissioner. respondent failed tocorrect the conditions cited in nov 34807223x. work w/permit, at cellar created a class 'a' apt. remedy: comply w/commissioner's order.
Jan 26, 2011 · Penalty $2,400
Resolve - Class - 1
Failure to correct ecb #34807223x for class'a' apt in cellar level respondent has a history of non-compliance with dept of bldg. remedy: obtain permit.
Nov 24, 2010
Resolve - Class - 1
Fail to comply w.comm order. noted: respondent failed to correct to correct the conditions cited in the prior nov 34807223x for work w.o a permit, created class "a" apt in cellar. at time of inspection no perm
Sep 25, 2010 · Penalty $6,000
Resolve - Class - 1
Faulure to correct conditions cited in nov 34807223xfor work done w/o a permit created class ''a' )at cellar.remedy:correct conditions cited
May 21, 2010 · Penalty $2,400
Resolve - Class - 2
Failure ti file c of c with dob pursuanat to 28-204.2 for violation 34807224h-failure to provide stopping etc. remdy:correct/file c of c
May 21, 2010 · Penalty $800
Resolve
Show 4 more ↓
- Class - 2
Residence altered for occupancy for occupancy as a dwelling for more than the legally approved number of families noted cert of occupancy #231873 on jul 14 1989 indicates cellar ordinary use now in cellar a cla
Dec 2, 2009 · Penalty $6,000
Resolve - Class - 1
Work w/o a permit noted cert of occupancy #231873 on jul 14, 1989 indicates cellar ordinary use now in cellar illegally is built a class a apt w/ full height partition walls consisting of one ktcn w/ electrical
Dec 2, 2009 · Penalty $8,000
Resolve - Class - 1
Failure to maintain bldg in code compliant manner no fire stopping perbc712.3 27-345 noted at rear 1st fl apt #1d an opening approx 4ft x 6ft and steps leading to cellar rear part which is subdivided into rooms
Dec 2, 2009 · Penalty $5,000
Resolve - Class - 2
Occupancy contrary to that allowed by the cert of occupancy #231873 on jul 14, 1989 which indicate cellar ordinary use and 4apt on 1st fl now is cellar front a class a apt is created and rear part is interconne
Dec 2, 2009 · Penalty $6,000
Resolve
Complaints
- Electric
Lighting
Aug 25, 2026 · Apt 3C
Close - Water leak
Heavy flow
Aug 25, 2026 · Apt 3C
Close - Electric
Power outage
Aug 25, 2026 · Apt 3C
Close - Unsanitary condition
Garbage/recycling storage
Jul 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 28, 2023 · Apt 3C
Close - Heat/hot water
Entire building
Nov 20, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 16, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 10, 2023 · Apt 2C
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 17, 2023 · Apt 3C
Close - Heat/hot water
Entire building
Jan 29, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 17, 2023 · Apt 3C
Close - Heat/hot water
Entire building
Jan 10, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2022 · Apt 3E
Close - Heat/hot water
Entire building
Nov 18, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 31, 2021 · Apt 3C
Close - Heat/hot water
Entire building
Jan 24, 2021 · Apt 3C
Close - Heat/hot water
Apartment only
Jan 23, 2021 · Apt 3C
Close - Heat/hot water
Entire building
Jan 19, 2021 · Apt 3C
Close - Heat/hot water
Entire building
Jan 23, 2018 · Apt 3C
Close - Heat/hot water
Entire building
Jan 9, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2017 · Apt 2L
Close - Heat/hot water
Entire building
Jan 8, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2017 · Apt 3C
Close - Heat/hot water
Entire building
Jan 8, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2017 · Apt 4A
Close - Heat/hot water
Entire building
Jan 4, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2017 · Apt 4A
Close - Heat/hot water
Entire building
Dec 20, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 19, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 19, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 19, 2016 · Apt 3A
Close - Door/window
Window frame
Sep 16, 2016 · Apt 2L
Close - Unsanitary condition
Mold
Apr 2, 2016 · Apt 1C
Close - Heat/hot water
Entire building
Feb 1, 2016 · Apt 2R
Close - Heat/hot water
Entire building
Jan 24, 2016 · Apt 3L
Close - Heat/hot water
Entire building
Jan 11, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2016 · Apt 1B
Close - Heat/hot water
Entire building
Nov 22, 2015 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 4
- Residential units
- 12
- Building area
- 7,833 ft²
- Lot area
- 2,691 ft²
- Zoning
- R6B
- Community board
- 306
- Council district
- 39
- Block / lot
- 958 / 39
- Assessed value
- $789,300
- Landmark / historic district
- No
HPD registration #340516, last renewed Nov 26, 2025.
Questions about 646 President Street
Who owns 646 President Street?
The owner of record in NYC Department of City Planning PLUTO data is 646 President Street Associates, LLC.
Does 646 President Street have violations?
Yes. NYC HPD has recorded 191 housing violations at this property.
Is 646 President Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 646 President Street built?
City records list 1920 as the year it was built.
How many apartments are in 646 President Street?
It has 12 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.