roofy

214 6 Avenue

Brooklyn, NY 11215BBL 3-00956-0047Map

Owner of record: President Adams Realt

214 6 Avenue is a walk-up apartment building built in 1920 in Brooklyn, 11215. It has 48 residential units across 4 floors. The owner of record is President Adams Realt. HPD has recorded 116 housing violations here, most recently on August 3, 2023.

HPD violations
116
DOB violations
32
ECB violations
8
HPD complaints
55

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Aug 3, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 116

  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Aug 3, 2023

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 2nd story balcony at building front

    Jul 28, 2023

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story

    Jul 28, 2023

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jul 28, 2023

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east and south wall in the 2nd room from east located at apt 1d, 1st story, 1st apartment from east at south

    Jul 13, 2023 · Apt 1D

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing consisting of permanent stopper installed at vestibule door at public hall, 1st story

    Jul 13, 2023

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective bulding front entrance , 1st story

    Jul 13, 2023

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing consisting of permanent stopper installed on building front entrance door , 1st story

    Jul 13, 2023

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing consisting of permanently installed door stopper at building vestibule door at public hall, 1st story

    Jul 9, 2023

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing consisting of permanently installed door stopper at building entrance door at public hall, 1st story

    Jul 9, 2023

    Closed — Violation closed
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective brick and mortar joints at west wall of stoop at building entrance

    Jul 9, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 29, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 29, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 20, 2023

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots 4th story east building front at fire escape

    Mar 17, 2023

    Closed — Violation dismissed
  • A

    Refit entrance door leading to building at public hall, 1st story

    Feb 25, 2023

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at west wall at public hall, 1st story

    Feb 25, 2023

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at west wall near mail boxes at public hall, 1st story

    Feb 25, 2023

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 1d, 1st story, 1st apartment from south at west

    Feb 25, 2023 · Apt 1D

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1d, 1st story, 1st apartment from south at west

    Feb 25, 2023 · Apt 1D

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 9, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 9, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 9, 2022

    Closed — Violation dismissed
  • B

    Provide an adequate supply of gas to the fixtures to cooking range in the kitchen located at apt 4b, 4th story, 2nd apartment from west at north

    May 18, 2022 · Apt 4B

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 18, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 18, 2022

    Closed — Violation dismissed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at building front, east side at fire escape

    Jul 22, 2021

    Closed — Violation dismissed
  • B

    Replace with new the missing wire glass panels at building entrance door , 1st story

    Jul 22, 2021

    Closed — Violation dismissed
  • C

    Code: arrange and make self-closing the doors , in the entrance located at apt 2b, 2nd story, 1st apartment from south at west

    Jul 22, 2021 · Apt 2B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west

    Jul 22, 2021 · Apt 2B

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 16, 2021

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 16, 2021

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 5, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 4, 2019

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 4, 2019

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 28, 2019

    Closed — Violation dismissed
  • B

    Abate the infestation consisting of bedbugs located at apt 3c, 3rd story, 1st apartment from south at west

    Mar 22, 2019 · Apt 3C

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 24, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 24, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 12, 2018

    Closed — Violation dismissed
  • B

    Properly secure the loose marble tread-6th up from bottom at public hall stairs, 2nd story

    May 23, 2018

    Closed — Violation closed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ..flower pots and cages at 2nd story balcony at 1st fire escape from north at east

    May 23, 2018

    Closed — Violation closed
  • C

    Remove the illegal double cylinder key operated locking device at door in the entrance located at apt 3d, 3rd story, 1st apartment from east at south

    May 8, 2018 · Apt 3D

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate legal gate unable to open in the 2nd room from east located at apt 3d, 3rd story, 1st apartment from east at south

    May 8, 2018 · Apt 3D

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors ..carpet prevent the door to be self closing in the entrance located at apt 3d, 3rd story, 1st apartment from east at south

    May 8, 2018 · Apt 3D

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the entire apartment located at apt 3d, 3rd story, apartment at west

    Mar 27, 2018 · Apt 3D

    Closed — Violation dismissed
  • B

    Arrange and make self-closing the doors at front entrance to building

    Mar 27, 2018

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors at entrance located at apt 3d, 3rd story, apartment at west

    Mar 27, 2018 · Apt 3D

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling in the bathroom located at apt 3d, 3rd story, apartment at west

    Mar 27, 2018 · Apt 3D

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 3d, 3rd story, apartment at west

    Mar 27, 2018 · Apt 3D

    Closed — Violation dismissed

DOB building violations · 32

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
Show 22 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed
  • Construction other optional

    Vp

    Sep 20, 1989

    Vp-violation unserved ecb-active

ECB violations · 8

  • Class - 2

    Failure to maintain building exterior walls in a code compliant manner. noted: spalling ornamental masonry at various location of the building exposure # 1. also, multiple vertical and horizontal cracks., repai

    Aug 31, 2023 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain building exterior walls in a code compliant manner. noted: spalling ornamental masonry at various location of the building exposure # 1. also, multiple vertical and horizontal cracks., repai

    Aug 31, 2023 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain building exterior walls in a code compliant manner. noted: spalling ornamental masonry at various location of the building exposure # 1. also, multiple vertical and horizontal cracks., repai

    Aug 31, 2023 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation#32097518r issued on 8/3/2018 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2).an acceptible cert

    Jun 18, 2019 · Penalty $3,125

    Resolve
  • Class - 2

    B254,6a,11b,25b,50,50a,50b,50c,50d,50e,50f (50)boiler flue material not welded steel (50a)cold water pipes sweating onto boiler (50b)sail switch is defective (50c)front flue door bolt defective (50d)pipe leakin

    Aug 3, 2018 · Penalty $625

    Resolve
  • Non-hazardous

    Failure to maintain exterior bldg wall. at corner parapet loose cement& brick creating danger to pedestrians. remedy: make safe immediately maintain exterior bldg wall.

    Dec 21, 2006 · Penalty $800

    Active
  • Non-hazardous

    Failure to maintain exterior building wall.defect is:1)coping stones spalling & sections missing on parapet wall above 4 story at roof area at front & side of building.2)stucco cement work cracked approx 3/4"

    Feb 2, 2005 · Penalty $800

    Resolve
  • Non-hazardous

    49, c26-40.0 26-216 no key on premises to acess boiler room no sign for key to heating system.

    Nov 30, 1999 · Penalty $180

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Feb 4, 2024 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Nov 2, 2023 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Jun 4, 2023 · Apt 1D

    Close
  • Door/window

    Window frame

    Jun 4, 2023 · Apt 1D

    Close
  • Water leak

    Heavy flow

    Jun 4, 2023 · Apt 1D

    Close
  • Flooring/stairs

    Floor

    Jun 4, 2023 · Apt 1D

    Close
  • Water leak

    Heavy flow

    Jun 4, 2023 · Apt 1D

    Close
  • Plumbing

    Radiator

    Jun 4, 2023 · Apt 1D

    Close
  • Door/window

    Door

    Feb 23, 2023 · Apt 1D

    Close
  • Paint/plaster

    Wall

    Feb 23, 2023 · Apt 1D

    Close
Show 40 more ↓
  • Plumbing

    Radiator

    Feb 23, 2023 · Apt 1D

    Close
  • Unsanitary condition

    Pests

    Dec 9, 2022 · Apt 1D

    Close
  • Unsanitary condition

    Pests

    Nov 27, 2022 · Apt 1D

    Close
  • General

    Cooking gas

    May 9, 2022 · Apt 4B

    Close
  • Unsanitary condition

    Pests

    Jul 20, 2021 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Jul 20, 2021 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Nov 23, 2019 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Feb 25, 2019 · Apt 3C

    Close
  • Heat/hot water

    Apartment only

    May 7, 2018 · Apt 3D

    Close
  • Door/window

    Door

    May 7, 2018 · Apt 3D

    Close
  • Water leak

    Damp spot

    Mar 11, 2018 · Apt 3B

    Close
  • Water leak

    Slow leak

    Mar 11, 2018 · Apt 3B

    Close
  • Heat/hot water

    Apartment only

    Mar 11, 2018 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Feb 16, 2015 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Mar 13, 2014 · Apt 3C

    Close
  • Heat/hot water

    Apartment only

    Mar 13, 2014 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Mar 13, 2014 · Apt 2A

    Close
  • Heating

    Heat related

    Feb 27, 2014 · Apt 3C

    Close
  • Nonconst

    Vermin

    Feb 24, 2014 · Apt 3C

    Close
  • Heating

    Heat related

    Feb 11, 2014 · Apt 3C

    Close
  • Heating

    Heat related

    Jan 22, 2014 · Apt 1D

    Close
  • Heating

    Heat related

    Jan 22, 2014 · Apt 3C

    Close
  • Heating

    Heat related

    Jan 9, 2014 · Apt 1D

    Close
  • Heating

    Heat related

    Jan 8, 2014 · Apt 3C

    Close
  • Heating

    Heat related

    Jan 8, 2014 · Apt 1C

    Close
  • Heating

    Heat related

    Jan 8, 2014 · Apt NA

    Close
  • Heating

    Heat related

    Jan 8, 2014 · Apt 1D

    Close
  • Heating

    Heat related

    Jan 25, 2013 · Apt 1B

    Close
  • Heating

    Heat related

    Aug 5, 2009 · Apt 3D

    Close
  • Paint/plaster

    Wall

    Mar 10, 2005 · Apt 1C

    Close
  • General

    Mold

    Mar 10, 2005 · Apt 1C

    Close
  • Paint/plaster

    Wall

    Mar 10, 2005 · Apt 1C

    Close
  • Plumbing

    Radiator

    Mar 10, 2005 · Apt 1C

    Close
  • Plumbing

    Water-leaks

    Mar 10, 2005 · Apt 1C

    Close
  • General

    Mold

    Mar 10, 2005 · Apt 1C

    Close
  • Paint/plaster

    Ceiling

    Mar 10, 2005 · Apt 1C

    Close
  • Plumbing

    Radiator

    Mar 10, 2005 · Apt 1C

    Close
  • General

    Mold

    Mar 10, 2005 · Apt 1C

    Close
  • Plumbing

    Radiator

    Mar 10, 2005 · Apt 1C

    Close
  • Appliance

    Refrigerator

    Mar 10, 2005 · Apt 1C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1920
Floors
4
Residential units
48
Building area
29,844 ft²
Lot area
9,200 ft²
Zoning
R6B
Community board
306
Council district
39
Block / lot
956 / 47
Assessed value
$2,252,250
Landmark / historic district
No

HPD registration #328098, last renewed Oct 14, 2025.

Questions about 214 6 Avenue

Who owns 214 6 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is President Adams Realt.

Does 214 6 Avenue have violations?

Yes. NYC HPD has recorded 116 housing violations at this property.

Is 214 6 Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 214 6 Avenue built?

City records list 1920 as the year it was built.

How many apartments are in 214 6 Avenue?

It has 48 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.