roofy

92 Sterling Place

Brooklyn, NY 11217BBL 3-00945-0018Map

Owner of record: Williams, Joseph

92 Sterling Place is a walk-up apartment building built in 1882 in Brooklyn, 11217. It has 4 residential units across 4 floors. The owner of record is Williams, Joseph. HPD has recorded 27 housing violations here, most recently on February 18, 2024. 10 of the 27 most recent violations are still open.

HPD violations
27
DOB violations
0
ECB violations
0
HPD complaints
14

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Feb 18, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 27

  • C

    Remove device preventing door from being self-closing consisting of kick down door stop permanently installed at door in the entrance located at apt 2, 2nd story, 1st apartment from east at south

    Feb 18, 2024 · Apt 2

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing consisting of kick down door stop permanently installed at building entrance door

    Feb 18, 2024

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing consisting of kick down door stop permanently installed at vestibule door

    Feb 18, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 27, 2023

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... at north wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Mar 23, 2023 · Apt 2

    Open — First no access to re- inspect violation
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Mar 23, 2023 · Apt 2

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Mar 23, 2023 · Apt 2

    Closed — Violation dismissed
  • B

    Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Sep 10, 2022 · Apt 2

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... at south wall approximately 4 sq ft, east wall 4 sq ft, north wall 2 sq ft in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Sep 10, 2022 · Apt 2

    Open — First no access to re- inspect violation
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Sep 10, 2022

    Closed — Violation dismissed
Show 17 more ↓
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Jun 5, 2022 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from west at north

    Jun 5, 2022 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective connection waste pipe under the sink in the kitchen located at apt 2, 2nd story, 1st apartment from west at north

    Jun 5, 2022 · Apt 2

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 2, 2nd story, 1st apartment from west at north

    Jun 5, 2022 · Apt 2

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Feb 16, 2022

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Feb 16, 2022

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Feb 16, 2022

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Feb 16, 2022

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Feb 16, 2022

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing the doors that is missing or defective ... in the entrance located at apt 2, 2nd story, 1st apartment from east at south

    Feb 16, 2022 · Apt 2

    Open — Invalid certification
  • B

    Repair or replace the smoke detector defective located at apt 2, 2nd story, 1st apartment from east at south

    Feb 16, 2022 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Feb 16, 2022 · Apt 2

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Feb 16, 2022 · Apt 2

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 2, 2nd story, 1st apartment from east at south

    Feb 16, 2022 · Apt 2

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Feb 16, 2022 · Apt 2

    Open — Nov certified late
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts required

    Feb 2, 2005 · Apt BLDG

    Open — Nov sent out
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections cellar thru out.

    Jul 18, 1989

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Apartment only

    Feb 16, 2024 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Feb 11, 2024 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Mar 15, 2023 · Apt 2

    Close
  • General

    Cooking gas

    Sep 6, 2022 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Jun 2, 2022 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Feb 15, 2022 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Feb 15, 2022 · Apt 2

    Close
  • Safety

    Carbon monoxide detector

    Feb 15, 2022 · Apt 2

    Close
  • Water leak

    Slow leak

    Feb 15, 2022 · Apt 2

    Close
  • Heating

    Heat related

    Feb 19, 2009 · Apt 3

    Close
Show 4 more ↓
  • Heating

    Heat related

    Feb 13, 2009 · Apt 3

    Close
  • Heating

    Heat related

    Feb 13, 2009 · Apt 3

    Close
  • Heating

    Heat related

    Feb 13, 2009 · Apt 3

    Close
  • Electric

    Electric-supply

    Jul 27, 2006 · Apt 3

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1882
Floors
4
Residential units
4
Building area
4,800 ft²
Lot area
2,000 ft²
Zoning
R6B
Community board
306
Council district
39
Block / lot
945 / 18
Assessed value
$1,540,800
Landmark / historic district
Park Slope Historic District Extension II

HPD registration #364282, last renewed Aug 7, 2025.

Questions about 92 Sterling Place

Who owns 92 Sterling Place?

The owner of record in NYC Department of City Planning PLUTO data is Williams, Joseph.

Does 92 Sterling Place have violations?

Yes. NYC HPD has recorded 27 housing violations at this property.

Is 92 Sterling Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 92 Sterling Place built?

City records list 1882 as the year it was built.

How many apartments are in 92 Sterling Place?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.