roofy

Violations at 143 4 Avenue

Brooklyn, NY 11217 · BBL 3-00943-0004 · Back to the property

HPD housing violations

36 HPD violations, newest first.

  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 19, 2025

    Closed — Violation dismissed
  • BHazardous

    Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 4b, 4th story, 1st apartment from north at east

    Sep 10, 2025 · Apt 4B

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 4b, 4th story, 1st apartment from north at east

    Sep 10, 2025 · Apt 4B

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east

    Sep 10, 2025 · Apt 4B

    Open — Notice of issuance sent to tenant
  • BHazardous

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 4b, 4th story, 1st apartment from north at east

    Sep 10, 2025 · Apt 4B

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch set and door knob assembly at door in the entrance located at apt 4b, 4th story, 1st apartment from north at east

    Sep 10, 2025 · Apt 4B

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south

    Sep 4, 2025 · Apt 3B

    Closed — Violation dismissed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of hot water exceeds the maximum of 130 degrees. found hot water to be 147 degrees at all hot wattr fixtures. in the kitchen located at apt 3b, 3rd story, 1st apartment from east at south

    Sep 4, 2025 · Apt 3B

    Open — Nov certified late
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 4b, 4th story, 1st apartment from north at east

    Aug 19, 2025 · Apt 4B

    Open — Nov certified late
  • BHazardous

    Properly repair or replace the broken or defective spring balance at 1st window lower sash from south at west wall in the 4th room from east located at apt 4b, 4th story, 1st apartment from north at east

    Aug 19, 2025 · Apt 4B

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective broken glass at window lower sash at east wall in the bathroom located at apt 4b, 4th story, 1st apartment from north at east

    Aug 19, 2025 · Apt 4B

    Closed — Violation dismissed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at south wall in the kitchen located at apt 4b, 4th story, 1st apartment from north at east

    Aug 19, 2025 · Apt 4B

    Closed — Violation dismissed
  • BHazardous

    Repair the roof so that it will not leak over ceiling in the kitchen located at apt 4b, 4th story, 1st apartment from north at east

    Aug 19, 2025 · Apt 4B

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color th ceiling and south wall in the kitchen located at apt 4b, 4th story, 1st apartment from north at east

    Aug 19, 2025 · Apt 4B

    Closed — Violation dismissed
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4b, 4th story, 1st apartment from north at east

    Aug 19, 2025 · Apt 4B

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east

    Aug 19, 2025 · Apt 4B

    Open — Nov certified late
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 17, 2023

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 18, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 18, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 1st room from north located at apt 4b, 4th story, 1st apartment from east at south

    May 21, 2021 · Apt 4B

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from north located at apt 4b, 4th story, 1st apartment from east at south

    May 21, 2021 · Apt 4B

    Closed — Violation dismissed
  • CImmediately hazardous

    Code: arrange and make self-closing the doors .. in the entrance located at apt 4b, 4th story, 1st apartment from east at south

    May 21, 2021 · Apt 4B

    Closed — Violation dismissed
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 4b, 4th story, 1st apartment from east at south

    May 21, 2021 · Apt 4B

    Open — Nov certified late
  • CImmediately hazardous

    Code: arrange and make self-closing the doors .. in the entrance located at apt 3a, 3rd story, 1st apartment from west at north

    May 20, 2021 · Apt 3A

    Closed — Violation dismissed
  • CImmediately hazardous

    Code: arrange and make self-closing the doors .. in the entrance located at apt 4b, 4th story, 1st apartment from north at east

    May 20, 2021 · Apt 4B

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 5, 2021

    Open — Violation will be reinspected
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 5, 2021

    Closed — Violation dismissed
  • ANon-hazardous

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wall erected enlarging room in adjacent apartment preventing use of public hall at public hall, 4th story

    Dec 2, 2020

    Closed — Violation closed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of household items obstucting window to fire escape in the kitchen located at apt 4b, 4th story, 1st apartment from east at south

    Dec 2, 2020 · Apt 4B

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective uneven floor in the kitchen located at apt 4b, 4th story, 1st apartment from east at south

    Dec 2, 2020 · Apt 4B

    Closed — Violation closed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 6, 2015

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 1a, 1st story

    Apr 11, 2014 · Apt 1A

    Closed — Violation closed
  • BHazardous

    Repair or replace the smoke detector missing located at apt 1a, 1st story

    Apr 11, 2014 · Apt 1A

    Closed — Violation closed
  • ANon-hazardous

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration masonry seal up window 3 sty rear apt bathroom.

    Feb 3, 1989

    Closed — Violation dismissed
  • CImmediately hazardous

    Remove or cover in a manner approved by the department the peeling lead paint north wall front room baseboard 2 room from front 1 sty apt 1a mapp 789 6956 er1. , section '' ''

    Jan 21, 1989 · Apt 1A

    Closed — Violation closed

DOB building violations

2 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed

ECB violations

No ECB violations on record