roofy

35a Prospect Place

Brooklyn, NY 11217BBL 3-00935-0062Map

Owner of record: 35a Property INC.

35a Prospect Place is a two-family home built in 1879 in Brooklyn, 11217. It has 2 residential units across 3 floors. The owner of record is 35a Property INC.. HPD has recorded 351 housing violations here, most recently on September 14, 2026. 45 of the 50 most recent violations are still open.

HPD violations
351
DOB violations
15
ECB violations
4
HPD complaints
348

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 14, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 351

  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 14, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 14, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ,missing at public hall, 1st story

    Sep 14, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings ,missing sign,

    Sep 14, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox ,missing sign, at public hall, 1st story

    Sep 14, 2026

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing metal wedge jammed and obstructed south entrance door to vestibule, at basement

    Sep 14, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at bsmt-apt ground, 1st bsmt-apt from west at north

    Sep 14, 2026 · Apt GROUND

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at bsmt-apt ground, 1st bsmt-apt from west at north

    Sep 14, 2026 · Apt GROUND

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation heat riser 1st from north at east in the bathroom located at bsmt-apt ground, 1st bsmt-apt from west at north

    Sep 14, 2026 · Apt GROUND

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling, in the bathroom located at bsmt-apt ground, 1st bsmt-apt from west at north

    Sep 14, 2026 · Apt GROUND

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at bsmt-apt ground, 1st bsmt-apt from west at north

    Sep 14, 2026 · Apt GROUND

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at the washbasin in the bathroom located at bsmt-apt ground, 1st bsmt-apt from west at north

    Sep 14, 2026 · Apt GROUND

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the visible mold at caulking, grouts joints of the ceramic tiles at east, south and west walls around bathtub, in the bathroom located at bsmt-apt ground, 1st bsmt-apt from west at north

    Sep 14, 2026 · Apt GROUND

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the north , east and west walls in the bathroom located at bsmt-apt ground, 1st bsmt-apt from west at north

    Sep 14, 2026 · Apt GROUND

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric wire at the ceiling, in the kitchen located at bsmt-apt ground, 1st bsmt-apt from west at north

    Sep 14, 2026 · Apt GROUND

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation west wall panel and metal base inside the sink cabinet 1st from south at west, in the kitchen located at bsmt-apt ground, 1st bsmt-apt from west at north

    Sep 14, 2026 · Apt GROUND

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt ground, 1st apartment from south at west

    Sep 8, 2026 · Apt GROUND

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt ground, 1st apartment from south at west

    Sep 8, 2026 · Apt GROUND

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt ground, 1st apartment from south at west

    Sep 8, 2026 · Apt GROUND

    Open — Nov sent out
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling in the kitchen located at apt ground, 1st apartment from south at west

    Sep 8, 2026 · Apt GROUND

    Open — Nov sent out
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling in the bathroom located at apt ground, 1st apartment from south at west

    Sep 8, 2026 · Apt GROUND

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at east wall and south wall in the bathroom located at apt ground, 1st apartment from south at west

    Sep 8, 2026 · Apt GROUND

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at south wall in the bathroom located at apt ground, 1st apartment from south at west

    Sep 8, 2026 · Apt GROUND

    Open — Notice of issuance sent to tenant
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 5, 2026

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 19, 2025

    Open — Info nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and east wall in the bathroom located at bsmt-apt ground, 1st bsmt-apt from west at north

    Aug 30, 2025 · Apt GROUND

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the bathroom located at bsmt-apt ground, 1st bsmt-apt from west at north

    Aug 30, 2025 · Apt GROUND

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at bsmt-apt ground, 1st bsmt-apt from west at north

    Aug 30, 2025 · Apt GROUND

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at bsmt-apt ground, 1st bsmt-apt from west at north

    Aug 30, 2025 · Apt GROUND

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq feet at east wall in the bathroom located at bsmt-apt ground, 1st bsmt-apt from west at north

    Aug 30, 2025 · Apt GROUND

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10sq feet at east wall in the bathroom located at bsmt-apt ground, 1st bsmt-apt from west at north original violation 18196619 issued 30-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Aug 30, 2025 · Apt GROUND

    Open — Not complied with
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at bsmt-apt ground, 1st bsmt-apt from west at north

    Aug 30, 2025 · Apt GROUND

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 10, 2025

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt ground, 1st apartment from west at north

    May 2, 2025 · Apt GROUND

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt ground, 1st apartment from west at north

    May 2, 2025 · Apt GROUND

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at the ceiling in the kitchen located at apt ground, 1st apartment from west at north

    May 2, 2025 · Apt GROUND

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light at ceiling in the kitchen located at apt ground, 1st apartment from west at north

    May 2, 2025 · Apt GROUND

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt ground, 1st apartment from west at north

    May 2, 2025 · Apt GROUND

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt ground, 1st apartment from west at north

    May 2, 2025 · Apt GROUND

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door (primary egress at south) in the entrance located at apt ground, 1st apartment from west at north

    May 2, 2025 · Apt GROUND

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective latch set and door knob assembly at door (primary egress at south) in the entrance located at apt ground, 1st apartment from west at north

    May 2, 2025 · Apt GROUND

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door to building entrance at south

    May 2, 2025

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at cellar apt 1, 1st cellar apt from west at north

    Apr 25, 2025 · Apt 1

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at cellar apt 1, 1st cellar apt from west at north

    Apr 25, 2025 · Apt 1

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at cellar apt 1, 1st cellar apt from west at north

    Apr 25, 2025 · Apt 1

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at cellar apt 1, 1st cellar apt from west at north

    Apr 25, 2025 · Apt 1

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective in the entire apartment located at cellar apt 1, 1st cellar apt from west at north

    Apr 25, 2025 · Apt 1

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the 1st entrance from north located at cellar apt 1, 1st cellar apt from west at north

    Apr 25, 2025 · Apt 1

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 27, 2024

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 11, 2024

    Open — Nov sent out

DOB building violations · 15

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Boiler boiler optional

    B-boiler boiler optional

    May 25, 2011

    Dob violation - active
Show 5 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - active

ECB violations · 4

  • Class - 2

    Failure to maintain bldg in code compliant manner.missing plaster exposing lath thru out public halls cracked plaster walls & partitions.partially detached doors & steps detaching fromm stringer and walls pocke

    May 23, 2011 · Penalty $2,500

    Active
  • Class - 2

    Failure to maintain bldg in code complaint manner. found at the time of inspection defective stair structure with stringers dislodging from wall pockets affecting the stability of wooden stair assembly @ 2nd an

    Mar 25, 2010 · Penalty $2,500

    Active
  • Non-hazardous

    Failure to maintain building: noted: the fence at the front yard at the basement level is broken and leaning towards the sidewalk. construction materials, broken concrete, and other debris is piled up in front

    Feb 9, 2005 · Penalty $2,500

    Active
  • Non-hazardous

    34a/ 49/ bq9/ 36/ boiler room door missing

    Jul 12, 2002 · Penalty $5,000

    Active

Complaints

  • Paint/plaster

    Wall

    Sep 2, 2026 · Apt GROUND

    Close
  • Plumbing

    Basin/sink

    Sep 2, 2026 · Apt GROUND

    Close
  • Plumbing

    Basin/sink

    Sep 2, 2026 · Apt GROUND

    Close
  • Unsanitary condition

    Mold

    Sep 2, 2026 · Apt GROUND

    Close
  • Water leak

    Slow leak

    Sep 2, 2026 · Apt GROUND

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2025 · Apt GROUND

    Close
  • Paint/plaster

    Wall

    Oct 22, 2025 · Apt GROUND

    Close
  • Plumbing

    Basin/sink

    Oct 22, 2025 · Apt GROUND

    Close
  • Water leak

    Slow leak

    Oct 22, 2025 · Apt GROUND

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2025 · Apt GOOUND

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Aug 22, 2025 · Apt GROUND

    Close
  • Plumbing

    Bathtub/shower

    Aug 22, 2025 · Apt GROUND

    Close
  • General

    Cabinet

    Aug 22, 2025 · Apt GROUND

    Close
  • Unsanitary condition

    Mold

    Aug 22, 2025 · Apt GROUND

    Close
  • Water leak

    Slow leak

    Aug 22, 2025 · Apt GROUND

    Close
  • Plumbing

    Basin/sink

    Apr 23, 2025 · Apt GROUND

    Close
  • Paint/plaster

    Wall

    Apr 11, 2025 · Apt GROUND

    Close
  • General

    Cabinet

    Apr 11, 2025 · Apt GROUND

    Close
  • Plumbing

    Basin/sink

    Mar 13, 2025 · Apt GROUND

    Close
  • Paint/plaster

    Wall

    Mar 13, 2025 · Apt GROUND

    Close
  • Appliance

    Electric/gas range

    Jun 15, 2024 · Apt 1

    Close
  • Water leak

    Heavy flow

    Jun 15, 2024 · Apt 1

    Close
  • General

    Cabinet

    Jun 15, 2024 · Apt 1

    Close
  • Paint/plaster

    Wall

    Jun 15, 2024 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Jun 15, 2024 · Apt 1

    Close
  • Paint/plaster

    Wall

    Jun 15, 2024 · Apt GROUND

    Close
  • Water leak

    Slow leak

    Jun 15, 2024 · Apt GROUND

    Close
  • Water leak

    Damp spot

    May 31, 2023 · Apt GROUND

    Close
  • Plumbing

    Basin/sink

    Feb 16, 2022 · Apt GROUND

    Close
  • Heat/hot water

    Entire building

    Feb 16, 2022 · Apt BLDG

    Close
  • Unsanitary condition

    Sewage

    Feb 16, 2022 · Apt GROUND

    Close
  • Unsanitary condition

    Sewage

    Feb 16, 2022 · Apt GROUND

    Close
  • Plumbing

    Toilet

    Feb 16, 2022 · Apt GROUND

    Close
  • Plumbing

    Basin/sink

    Dec 2, 2021 · Apt GROUND

    Close
  • Appliance

    Electric/gas range

    Dec 2, 2021 · Apt GROUND

    Close
  • Appliance

    Electric/gas range

    Dec 2, 2021 · Apt GROUND

    Close
  • Appliance

    Electric/gas range

    Dec 2, 2021 · Apt GROUND

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2021 · Apt GROUND

    Close
  • Appliance

    Electric/gas range

    Oct 24, 2021 · Apt GROUND

    Close
  • Paint/plaster

    Wall

    Oct 24, 2021 · Apt GROUND

    Close
  • Heat/hot water

    Entire building

    Oct 24, 2021 · Apt GROUND

    Close
  • Heat/hot water

    Entire building

    Oct 21, 2021 · Apt GRNDFL

    Close
  • Heat/hot water

    Entire building

    Aug 2, 2021 · Apt GROUND

    Close
  • Heat/hot water

    Entire building

    Jul 30, 2021 · Apt GROUND

    Close
  • Heat/hot water

    Entire building

    Jul 28, 2021 · Apt 1GROUN

    Close
  • Plumbing

    Basin/sink

    Jul 1, 2021 · Apt GROUND

    Close
  • Unsanitary condition

    Mold

    Jul 1, 2021 · Apt GROUND

    Close
  • Plumbing

    Basin/sink

    Jul 1, 2021 · Apt GROUND

    Close
  • Water leak

    Slow leak

    Jul 1, 2021 · Apt GROUND

    Close
  • Heat/hot water

    Apartment only

    Jul 1, 2021 · Apt GRND

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B9)
Year built
1879
Floors
3
Residential units
2
Building area
3,400 ft²
Lot area
1,658 ft²
Zoning
R6B
Community board
306
Council district
39
Block / lot
935 / 62
Assessed value
$232,620
Landmark / historic district
Park Slope Historic District Extension II

HPD registration #337944, last renewed Jun 23, 2015.

Questions about 35a Prospect Place

Who owns 35a Prospect Place?

The owner of record in NYC Department of City Planning PLUTO data is 35a Property INC..

Does 35a Prospect Place have violations?

Yes. NYC HPD has recorded 351 housing violations at this property.

Is 35a Prospect Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 35a Prospect Place built?

City records list 1879 as the year it was built.

How many apartments are in 35a Prospect Place?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.