646 39 Street
Brooklyn, NY 11232BBL 3-00914-0024Map
Owner of record: C. H 39 Realty LLC
646 39 Street is a hotel built in 2017 in Brooklyn, 11232. The owner of record is C. H 39 Realty LLC. HPD has recorded 24 housing violations here, most recently on May 11, 2026. 9 of the 24 most recent violations are still open.
- HPD violations
- 24
- DOB violations
- 3
- ECB violations
- 22
- HPD complaints
- 4
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 24
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, in the bathroom located at b-room 113, 2nd story, 1st b-room from west at north
Aug 19, 2025 · Apt 113
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the visible mold at grouts joints of the ceramic tiles at east, south and west walls around shower stall, in the bathroom located at b-room 113, 2nd story, 1st b-room from west at north
Aug 19, 2025 · Apt 113
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material south wall, at public hall, 2nd story
Aug 19, 2025
Open — Nov sent out - ANon-hazardous
Remove the dirty and/or loose paper and repaper or paint to the satisfaction of this department the south wall, at public hall, 2nd story
Aug 19, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 19, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 19, 2025
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color jambs of the window 1st from west at north, in the bathroom located at b-room 113, 2nd story, 1st b-room from west at north
Aug 19, 2025 · Apt 113
Open — Nov sent out - ANon-hazardous
Remove the dirty and/or loose paper and repaper or paint to the satisfaction of this department the north wall, at public hall, 2nd story
Aug 19, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at the entrance door to fire staircase 1st from north at east, at public hall, 2nd story
Aug 19, 2025
Closed — Violation closed
Show 14 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 4, 2024
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 28, 2023
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2022
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 16, 2022
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 16, 2022
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 21, 2021
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 21, 2021
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 8, 2019
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 7, 2019
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 10, 2018
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 10, 2018
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures bathroom and kitchen fixtures 3rd story apt #2
Apr 8, 2004
Closed — Violation closed - BHazardous
Provide adequate lighting for no light 1story publce at public hall, 1st story
Mar 3, 2001
Closed — Violation closed - CImmediately hazardous
Device present on central heating system which is capable of causing an otherwise operable system to become inoperable lugs at 11 o, clock am and 5 o, clock pm at thermostat located in the 1st bedroom from east located at apt 1, 1st story
Jan 8, 2001 · Apt 1
Closed — Violation closed
DOB building violations · 3
- Construction other optional
Stop all work except to make site safe, contact bklyn borough comm. of fice at 718 802-3677
Jan 11, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 13, 2018
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Jun 23, 2017
Vp*-violation unserved ecb- dismissed
ECB violations · 22
- Class - 2
All installed lighting fixtures exceeded the quantity of lighting fixtures indicated on comcheck on page en-001a.00 and lighting fixtures plans, comply with code; please go to https://www1.nyc.gov/site/building
Sep 4, 2020
Resolve - Class - 2
Failure to provide construciton documents at job site(site safety planat time of inspection on an active 5 story nb construction site,when request was made for the site safety plan for the site the competent pe
Dec 18, 2019
Resolve - Class - 2
Bc3301.6/failure to provide design dreawings for elevator platform.at time of insepction on an active 5 story nb condruction site notice a platform in the elevator shaft when the competent person was asked if d
Dec 18, 2019 · Penalty $312
Resolve - Class - 2
Superintendent fail to maintain construction log book as per code.at time of inspection on an active 5 story nb construction site,notice theconstruction log book was inadequate not maintain as per code,the supe
Dec 18, 2019
Resolve - Class - 2
Failure to provide/maintain construction document at job site(fence plan)at time of inspection on an active 5 story nb construction site,when request was made for plans for the construction fence competent pers
Dec 18, 2019
Resolve - Class - 1
Failure to institute/maintain safety equiptment measures or temporary construction-no guard rails.at time of inspection on an active nb construction site,notice at each elevator opening contractor fail to maint
Dec 18, 2019 · Penalty $2,500
Resolve - Class - 1
Owner failed to ensure workers completed required training and have onsite.at time of inspection on an active 5 story nb construction site,notice that the owner failed to ensure that each construction/demolitio
Dec 18, 2019
Resolve - Class - 1
Failure to conduct daily presift safety meeting aon site as per code.at time of inspection on an active 5 story nb construction site when the competent person on site was asked if daily preshift safety meetings
Dec 18, 2019 · Penalty $5,000
Resolve - Class - 1
Contractor failed to ensure workers completed required training and have on site.at time of inspection on an active 5 story nb construction site,notice theat the contractor failed to ensure that each constructi
Dec 18, 2019
Resolve - Class - 1
Sec. 3301.2 failure to maintain(missing compactor doors). at time of inspection of new 5 sty bldg active jobsite. i observed on each floor missing compactor doors. this condition creates a hazard of constructio
Jun 18, 2019 · Penalty $625
Resolve
Show 12 more ↓
- Class - 2
Sec. 3301.2 signs(missing)at time of inspection of new 5 sty bldg active jobsite. i observed on each floor missing signs,exit,floor,no smoking. remedy: provide & maintain adequate signs.
Jun 18, 2019
Resolve - Class - 2
Work does not conform to approved construction documents &/or approved amendments. as noted: @ time of insp @ an active construction site. observed exp#2,#4, fl #1 to fl #5, steel staircase, landing matel deck
Jun 13, 2018 · Penalty $625
Resolve - Class - 1
Work w/o a permit. note: at the time of my inspection of a 5 sty bldg at roof level,construction work in progress. i observed sprinkler system partially erected from 1st to 5th floor level in stairway & on inte
Mar 13, 2018 · Penalty $800
Resolve - Class - 1
Sec. 3314.4.4.5 dislodgement. note: at the time of my inspection of a 5 sty bldg at roof level,construction work in progress. i observed debris & material(loose)that consist of bricl,metal,buckers that was susc
Mar 13, 2018 · Penalty $2,500
Resolve - Class - 1
Sec. 3314.8.2 debris netting. note: at the time of my inspection of a 5 sty bldg at roof level,construction work in progress. i observed netting on supported scaffold was loose & did not fully enclosed supporte
Mar 13, 2018 · Penalty $2,500
Resolve - Class - 2
Sec. 1rcny 3301-02(c) construction superntendent failed to perform duties as per rule. on this date hazardous conditions & stop work order was observed & issued to this construction site. 1)no safety measures
Mar 13, 2018 · Penalty $5,000
Resolve - Class - 2
Failure to safeguard all public & property affected by construction operation. note: at the mtime of my inspection of a 5 sty bldg at roof level,construction work in progress. i observed that there were no over
Mar 13, 2018
Resolve - Class - 2
Failure to provide approved/accepted plans construction documents at jobsite at time of inspection. note: at the time of my inspection of a 5 sty bldg at roof level,construction work in progress. i observed app
Mar 13, 2018
Resolve - Class - 1
Failure to safeguard. noticed at time of inspection incident/accident. worker fell approx 9feet down in height while unloading plywood on top of 1st fl decking. worker did not have harness or lifeline & no safe
Jun 23, 2017 · Penalty $8,000
Resolve - Class - 1
Bc3301.8.1 tampering of evidence of an accident on construction site prohibited. noticed at time of inspection worker fell 9 feet off 1st floor deck while unloading plywood. all first floor decking was remove
Jun 23, 2017 · Penalty $8,000
Resolve - Class - 2
Sec. 1704.1 misc violation. failure to file a special inspection statement of responsibility prior to permit issuance & prior to start of work under special inspection req. as noted: at time of inspection on an
Oct 28, 2016 · Penalty $400
Resolve - Class - 2
Job site fence. at time of inspection observed that the job site fencewas not maintained as per code,fence out of plumb & leaning into sidewalk,creating a hazard for oedestrians at exp#1. remedy: maintain jobsi
Oct 3, 2016
Resolve
Complaints
- Unsanitary condition
Pests
Aug 15, 2025 · Apt 113
Close - Unsanitary condition
Pests
Nov 2, 2024 · Apt IDK
Close - Heating
Heat related
Nov 24, 2006 · Apt 1
Close - Heating
Heat related
Nov 23, 2006 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H3)
- Year built
- 2017
- Floors
- 5
- Residential units
- —
- Building area
- 17,896 ft²
- Lot area
- 7,512 ft²
- Zoning
- M1-2
- Community board
- 307
- Council district
- 38
- Block / lot
- 914 / 24
- Assessed value
- $3,226,500
- Landmark / historic district
- No
HPD registration #813410, last renewed May 1, 2014.
Questions about 646 39 Street
Who owns 646 39 Street?
The owner of record in NYC Department of City Planning PLUTO data is C. H 39 Realty LLC.
Does 646 39 Street have violations?
Yes. NYC HPD has recorded 24 housing violations at this property.
Is 646 39 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 646 39 Street built?
City records list 2017 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.