roofy

Violations at 348 22 Street

Brooklyn, NY 11215 · BBL 3-00900-0034 · Back to the property

HPD housing violations

27 HPD violations, newest first.

  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 1, 2026

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 3, 2024

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 20, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 20, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 22, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 6, 2021

    Closed — Violation dismissed
  • CImmediately hazardous

    Arrange and make self-closing the doors vestibule door , 1st story

    Oct 2, 2020

    Open — Nov sent out
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story

    Oct 2, 2020

    Open — Nov sent out
  • CImmediately hazardous

    Arrange and make self-closing the doors in the entrance located at apt 1r, 1st story, 1st apartment from east at south

    Oct 2, 2020 · Apt 1R

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Oct 2, 2020 · Apt 1R

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Oct 1, 2018

    Closed — Violation dismissed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Oct 1, 2018

    Closed — Violation dismissed
  • CImmediately hazardous

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at or near mail boxes at public hall, 1st story

    Jul 26, 2018

    Open — Nov certified late
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing sign at public hall, 1st story

    Jul 26, 2018

    Closed — Violation dismissed
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jul 26, 2018

    Closed — Violation dismissed
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jul 26, 2018

    Closed — Violation dismissed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jul 26, 2018

    Closed — Violation dismissed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 26, 2018

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 6, 2015

    Closed — Violation dismissed
  • ANon-hazardous

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partitions erected at 3rd story obstructing access to public hall bulkhead at public hall, 3rd story

    Jun 26, 2013

    Open — Nov sent out
  • IInformation / order

    Above premises have been vacant and untenanted except for caretaker for 60 days or more, and cannot be reoccupied until a new certificate of occupancy has been obtained. premises have been vacant since ...

    May 28, 2012

    Open — First no access to re- inspect violation
  • CImmediately hazardous

    Remove the illegal fastening eye and hasp capable of being padlocked at bulkhead door at public hall, 3rd story

    Sep 11, 2009

    Open — First no access to re- inspect violation
  • BHazardous

    Properly repair the broken or defective counter balance at upper and lower window sashes in the kitchen located at apt 3f, 3rd story, 1st apartment from north at east

    Sep 11, 2009 · Apt 3F

    Open — First no access to re- inspect violation
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 3f, 3rd story, 1st apartment from east at south

    Aug 3, 2009 · Apt 3F

    Open — First no access to re- inspect violation
  • BHazardous

    Arrange and make self-closing the doors bulkhead door to roof

    Jul 22, 2009

    Open — First no access to re- inspect violation
  • BHazardous

    Properly repair with similar material the broken or defective tin metal ceiling in the kitchen located at apt 3f, 3rd story

    Jul 22, 2009 · Apt 3F

    Open — First no access to re- inspect violation
  • BHazardous

    Replace with new the broken or defective lower window sash interior glass pane in the kitchen located at apt 3f, 3rd story

    Jul 22, 2009 · Apt 3F

    Open — First no access to re- inspect violation

DOB building violations

1 DOB violations, newest first.

  • Construction other optional

    C-construction other optional

    Jun 13, 2003

    Dob violation - active

ECB violations

2 ECB violations, newest first.

  • Class - 3

    Failure to maintain bldg wall inthat at front facade, there is an approx. 3' long step crack running from the top of 3rd flr window to underneath metal cornice.remedy:make all necessary repairs immediately.main

    Sep 26, 2009 · Penalty $500

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner. noted: at front of building above entrance door,2nd & 3rd flr windows cracking & seperation have occupied. also at apt 3f cracks throughout ceiling & near

    Jul 23, 2009 · Penalty $1,000

    Resolve