Violations at 739 6 Avenue
Brooklyn, NY 11215 · BBL 3-00900-0001 · Back to the property
HPD housing violations
26 HPD violations, newest first.
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Nov 29, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story
Nov 29, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 29, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 29, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Nov 29, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Nov 29, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Nov 29, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from east at south located at apt 3f, 3rd story, 2nd apartment from east at south
Nov 29, 2025 · Apt 3F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from east at north located at apt 3f, 3rd story, 2nd apartment from east at south
Nov 29, 2025 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective hinges at door in the entrance located at apt 3f, 3rd story, 2nd apartment from east at south
Nov 29, 2025 · Apt 3F
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the north wall in the 2nd room from east located at apt 3f, 3rd story, 2nd apartment from east at south
Nov 29, 2025 · Apt 3F
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at all walls and ceiling at basement
Nov 26, 2025
Open — Defect letter issued - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 3, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 20, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 18, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 5, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 5, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 28, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 12, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 1, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 6, 2015
Closed — Violation dismissed
DOB building violations
4 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Construction other optional
C-construction other optional
Dec 6, 2005
Dob violation - dismissed
ECB violations
6 ECB violations, newest first.
- Class - 1
Failure to provide unobstructed exit passageway.observed 2 newly created fire escape extensions at either end of original fire escape.prior windows have been sealed shut.newly installed windows lead to fire esc
Mar 6, 2023 · Penalty $1,250
Resolve - Class - 1
Work without a permit.observed newly created extensions approx 6ft long added to each end of the existing fire escape at exp4.no permits on file with the department for this work.remedy:obtain permit.
Mar 6, 2023
Resolve - Class - 1
Falsifying doc lmp # 2361 came to inspect gas piping in cellar and boiler room as per ll 152 multiple dwelling law and found several areas of gas piping with illegal fittings and pipe not supported well; howeve
Oct 22, 2021
Resolve - Class - 1
I observed in cellar and boiler room area newly installed gas piping with new fittings and fresh sealant and no permits on file and no testing which therefore no proper gas authorizations and certifications wer
Oct 22, 2021 · Penalty $5,000
Resolve - Class - 1
I observed in cellar and boiler room area newly installed gas piping and fittings and new sealant and work was performed 100% and no permits on file at time of inspection, obtain permit
Oct 22, 2021 · Penalty $1,250
Resolve - Class - 1
I observed in cellar and boiler room newly installed gas piping and fittings and no permits on file; therefore no proper testing was performed on gas line at time of inspection, perform test
Oct 22, 2021 · Penalty $2,500
Resolve