roofy

Violations at 338 21 Street

Brooklyn, NY 11215 · BBL 3-00898-0031 · Back to the property

HPD housing violations

The newest 50 of 86 HPD violations. The city keeps the complete history.

  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 1, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at public hall at boiler room, 1st story

    Mar 18, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective bell buzzer from building front to east wall in the foyer located at apt 3r, 3rd story, 2nd apartment from south at west

    Mar 18, 2026 · Apt 3R

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3r, 3rd story, 2nd apartment from south at west

    Mar 18, 2026 · Apt 3R

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 2nd apartment from south at west

    Mar 18, 2026 · Apt 3R

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st dumb waiter from east at south wall in the kitchen located at apt 2r, 2nd story, 2nd apartment from south at west

    Mar 17, 2026 · Apt 2R

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall, 1st window frame from south at west wall in the kitchen located at apt 2r, 2nd story, 2nd apartment from south at west

    Mar 17, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective electrical light fixture at ceiling in the 1st room from east located at apt 2r, 2nd story, 2nd apartment from south at west

    Mar 17, 2026 · Apt 2R

    Open — Nov sent out
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west

    Mar 17, 2026 · Apt 2R

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective spring balance at lower sash window at east 1 in the 1st room from east located at apt 2r, 2nd story, 2nd apartment from south at west

    Mar 17, 2026 · Apt 2R

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ' east wall, ceiling in the kitchen located at apt 2r, 2nd story, 2nd apartment from south at west

    Mar 17, 2026 · Apt 2R

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st dumb waiter from east at south wall in the kitchen located at apt 2r, 2nd story, 2nd apartment from south at west

    Mar 17, 2026 · Apt 2R

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall, 1st window frame from south at west wall in the kitchen located at apt 2r, 2nd story, 2nd apartment from south at west

    Mar 17, 2026 · Apt 2R

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from east, the 4th room from east located at apt 2r, 2nd story, 2nd apartment from south at west

    Mar 17, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective bell buzzer from building front to north wall, in the foyer located at apt 2r, 2nd story, 2nd apartment from south at west

    Mar 17, 2026 · Apt 2R

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the east wall, ceiling in the kitchen located at apt 2r, 2nd story, 2nd apartment from south at west

    Mar 17, 2026 · Apt 2R

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west

    Mar 17, 2026 · Apt 2R

    Open — Nov sent out
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west

    Mar 17, 2026 · Apt 2R

    Closed — Violation closed
  • ANon-hazardous

    Properly secure the loose electrical ceiling light fixture in the 1st room from east located at apt 2r, 2nd story, 2nd apartment from south at west

    Mar 17, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective lower lsash counter balance spring, first window from north at east in the 1st room from east located at apt 2r, 2nd story, 2nd apartment from south at west

    Mar 17, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective at building front leading to the west wall in the foyer located at apt 4r, 4th story, 2nd apartment from south at west

    Mar 16, 2026 · Apt 4R

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4r, 4th story, 2nd apartment from south at west

    Mar 16, 2026 · Apt 4R

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4r, 4th story, 2nd apartment from south at west

    Mar 16, 2026 · Apt 4R

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair or replace the broken or defective spring balances at lower window sasg at fire escape window in the kitchen located at apt 4r, 4th story, 2nd apartment from south at west

    Mar 16, 2026 · Apt 4R

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4r, 4th story, 2nd apartment from south at west

    Mar 16, 2026 · Apt 4R

    Closed — Violation closed
  • CImmediately hazardous

    Provide ready access to buildings heating system boiler room door locked at cellar at boiler room

    Mar 12, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 1st story, 2nd apartment from south at west

    Mar 12, 2026 · Apt 1R

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the kitchen located at apt 4r, 4th story, 2nd apartment from south at west original violation 18523619 issued 22-dec-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Dec 22, 2025 · Apt 4R

    Open — First no access to re- inspect violation
  • BHazardous

    Properly repair or replace the broken or defective bell buzzer from building entrance to apartment at east wall in the foyer located at apt 4r, 4th story, 2nd apartment from south at west

    Dec 22, 2025 · Apt 4R

    Open — Nov certified late
  • CImmediately hazardous

    Provide ready access to buildings heating system locked door at basement at boiler room

    Dec 22, 2025

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4r, 4th story, 2nd apartment from south at west

    Dec 22, 2025 · Apt 4R

    Open — Nov certified late
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4r, 4th story, 2nd apartment from south at west

    Dec 22, 2025 · Apt 4R

    Open — Nov certified late
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the kitchen located at apt 4r, 4th story, 2nd apartment from south at west

    Dec 22, 2025 · Apt 4R

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4r, 4th story, 2nd apartment from south at west

    Dec 22, 2025 · Apt 4R

    Open — Nov certified late
  • CImmediately hazardous

    Properly repair or replace the broken or defective counter balance at lower sash window in the kitchen located at apt 4r, 4th story, 2nd apartment from south at west

    Dec 22, 2025 · Apt 4R

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4r, 4th story, 2nd apartment from south at west

    Dec 22, 2025 · Apt 4R

    Closed — Violation closed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 6, 2025

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 26, 2024

    Closed — Violation dismissed
  • CImmediately hazardous

    Correct failure to notify occupants and/or to investigate lead-based paint hazards.

    Sep 13, 2024 · Apt 3L

    Open — Nov sent out
  • CImmediately hazardous

    Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Sep 13, 2024 · Apt 3L

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3r, 3rd story, 2nd apartment from east at south

    Jun 28, 2024 · Apt 3R

    Closed — Violation closed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jun 10, 2024

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective ceiling light fixture, in the middle sections, at public hall, 3rd story

    Jun 10, 2024

    Open — Nov sent out
  • BHazardous

    Remove all encumbrances consisting of helmet ,storage box, free standing on the floor, at public hall, 3rd story

    Jun 10, 2024

    Open — Nov sent out
  • BHazardous

    Remove all encumbrances consisting of kids scooter overlapped on radiator, on the floor, at public hall, 2nd story

    Jun 10, 2024

    Open — Nov sent out
  • CImmediately hazardous

    M/d law abate the nuisance consisting of cast iron radator free standing on the floor, at public hall, 2nd story

    Jun 10, 2024

    Closed — Violation closed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jun 10, 2024

    Open — Nov sent out
  • BHazardous

    Remove all encumbrances consisting of baby carriage free standing on the floor , at public hall, 1st story

    Jun 10, 2024

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 3, 2024

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 20, 2023

    Closed — Violation dismissed

DOB building violations

11 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - active

ECB violations

1 ECB violations, newest first.

  • Class - 2

    Weilmclain steam boiler has poor flame from oil burner+spill switch is incorrect+chimney door inoperable+waste oil in boiler room+storage@oil tank+missing antisyphon valve;correct violation+submit certificate o

    May 12, 2025 · Penalty $6,250

    Active