Violations at 328 21 Street
Brooklyn, NY 11215 · BBL 3-00898-0023 · Back to the property
HPD housing violations
2 HPD violations, newest first.
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed
DOB building violations
7 DOB violations, newest first.
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2020
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job #321189682 due to contractor withdrawal
Aug 19, 2020
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job #321189682 due to contractor withdrawal
Aug 19, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 7, 2020
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jul 7, 2020
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Construction other optional
Emerg wrk.construct site for new bldg job#321189682.during excav&under pinning the ext wall of adj bldg 326 21 street displaced&cracks noted at front&rear.remedy:immed backfill along the wall of 326 21 street& install temp bracing under direct&continuous supervision of pe.file for permit no later than 10/1/18
Sep 24, 2018
Dob violation - dismissed
ECB violations
17 ECB violations, newest first.
- Class - 1
Work does not conform to approved construction documents.at time of inspection proposed 4 story nb observed supported scaffold on top of swsboth of them does not conform to apporved construction documents.remed
Jul 27, 2020 · Penalty $6,250
Resolve - Class - 2
Work does not conformed to (sws plans).noted at time of inspection of an none active jobsite observed sidewalk shed erected under permit#b00171231-11-sh and odes not conformed to plans section eq-103.00.shows t
Feb 13, 2020 · Penalty $5,000
Resolve - Class - 2
Jobsite fence not constructed or not maintain pursuant to subsection. noted: at time of inspection at an none active jobsite. observed jobsite fence not maintain at exp#1 out of plum & leaning inwards.
Feb 13, 2020 · Penalty $1,030
Resolve - Class - 2
Failure to safe guard all persons or property affected bu constructionas noted:@ time of insp @ an active const site,metal deck on fl #2,observed at expt #4,adjoining property courtyard kids swimming pools chai
Aug 27, 2019 · Penalty $5,000
Resolve - Class - 1
Sec. 3301.13.13 failure to provide adequate job site logs. at the timeof my swo re-inspection planed 4 sty nb,1 sty level work in progress. at the time of my arrival upon request for job site logs,provided at
Aug 15, 2019
Resolve - Class - 1
Failure to provide const super as required by code. at the time of my swo re-inspection,proposed 4 sty nb,1 sty level work in progress. upon request for const super job logs providsed by const super mr. michael
Aug 15, 2019
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons violation #39002916m issued on 5/14/19 and to file a cert.of correctionpursuant to 28-201.1 and 1rcny 102-01.failure to safeguard all persons
Jul 15, 2019 · Penalty $625
Resolve - Class - 1
Severe cracking observed at adj property at 330 21 street along exp 3/4 exterior walls, in stairwell, and in rear mech. room due to construction., safeguard public and property; stop all work. provide licensed
May 14, 2019 · Penalty $1,250
Resolve - Class - 2
Bc 3301.7 failure to provide p.e approved design drawings for install dowel bar from foundation wall to slab details. as noted:at time of inspection on an active construction site observed at exposure#2,foundat
Mar 28, 2019
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35355140m issued on 8/30/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. note:no document file for
Oct 29, 2018
Resolve - Class - 1
Failure to protect adjoining structures during excavation operations. at the time of my inspection it was observed a construction site w/ underpining work and excavations w/ cracks observed at adjoining propert
Aug 31, 2018 · Penalty $5,000
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments. at the time of my inspections it was observed on construction site that (filed) conditions did not match approved plans soe 0
Aug 31, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to provide maintain display onsite documents required by chapter 33. at the time of my inspection it was observed that there was no site safety plan onsite or provided during inspection for new building
Aug 31, 2018 · Penalty $625
Resolve - Class - 1
Potential hazard-proposed nb is a 4story under construction job#321189682. during the soe work, adjacent property has been damaged and stability has been compromised. potential hazard has been identified. bc 33
Aug 31, 2018
Resolve - Class - 1
Failure to safeguad all persons and property affected by construction operations.noted:permises proposed 4-story under construction site with active permit#321189682-fo-nb.at the time of inspection.i observed f
Aug 30, 2018 · Penalty $10,000
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection.noted:i observed at time of inspection,the jobsite fence to be missing the 12'x 12'viewing port w/plexi-glass or other non-frangible material.
Nov 25, 2017
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation #35355140m issued on 08/30/18 and to file a certification of correction pursuant to 28-201.1 and 1rcny 102-01.note:no doc filed for
Dec 11, 2008
Resolve