11 Terrace Place
Brooklyn, NY 11218BBL 3-00895-7503Map
Owner of record: Unavailable Owner
11 Terrace Place is a condominium built in 2006 in Brooklyn, 11218. It has 18 residential units across 3 floors. The owner of record is Unavailable Owner. HPD has recorded 37 housing violations here, most recently on July 16, 2026. 25 of the 37 most recent violations are still open.
- HPD violations
- 37
- DOB violations
- 6
- ECB violations
- 7
- HPD complaints
- 83
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 37
- ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox ,missing sign, at public hall, 1st story
Jul 16, 2026
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing kickstand door stops installed at exterior side of the south entrance door to vestibule at public hall, 1st story
Jul 16, 2026
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing kickstand door stops installed at interior side of the north entrance door to rear yard, at public hall, 1st story
Jul 16, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at the front entrance to building , 1st story
Jul 16, 2026
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 16, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings ,missing sign,
Jul 16, 2026
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jul 16, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 16, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the bags with garbages at the building front entrance, in the front south outer sections yard
Jul 16, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Open — Nov sent out
Show 27 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing kickstand door stops installed at vestibule door,
Dec 26, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Dec 26, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 26, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 19, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 19, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 28, 2016
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 3e, 3rd story, 1st apartment from west at north
Sep 24, 2011 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department west wall in the 1st room from east at south located at apt 3e, 3rd story, 1st apartment from north at east
Sep 22, 2011 · Apt 3E
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color sheetrock at ceiling in the 1st room from east at north located at apt 3e, 3rd story, 1st apartment from north at east
Sep 22, 2011 · Apt 3E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st bedroom from east at south located at apt 3e, 3rd story, 1st apartment from south at west
Aug 20, 2011 · Apt 3E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at center located at apt 3e, 3rd story, 1st apartment from south at west
May 29, 2011 · Apt 3E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 3e, 3rd story, 2nd apartment from south at west
May 26, 2011 · Apt 3E
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 3e, 3rd story, apartment at north
Apr 7, 2011 · Apt 3E
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective located at apt 3e, 3rd story, apartment at north
Apr 7, 2011 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Apr 7, 2011
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at south wall 4 square feet at basement
Apr 7, 2011
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from east located at apt 3e, 3rd story, 1st apartment from west at north
Apr 1, 2011 · Apt 3E
Open — Nov sent out - BHazardous
Replace with new the missing metal flashing at north / west courner of roof
Apr 1, 2011
Open — Nov sent out - BHazardous
Properly repair the broken or defective window casing in the 1st room from east located at apt 3a, 3rd story, 1st apartment from south at west
Apr 23, 2009 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair the broken or defective window casing in the 2nd room from east at south located at apt 3a, 3rd story, 1st apartment from south at west
Apr 23, 2009 · Apt 3A
Open — Nov sent out
DOB building violations · 6
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed
ECB violations · 7
- Non-hazardous
Approved plans not available for insp.
Dec 14, 2006 · Penalty $500
Resolve - Non-hazardous
Work w/o permit. hazardous noted:at time of insp pre demo insp initialnoted: 3rd fl demo started to second fl no permits issued as per dob records initial insp on above date to take place. remedy:obtain permits
May 22, 2006
Resolve - Hazardous
Failure to remove glass. noted:at time of insp demo work in progress bldg partially down to 2nd fl glass was not removed from almost every single openning as per code. remedy:stop all work, remove all glass
May 10, 2006 · Penalty $500
Resolve - Hazardous
Job site fence defective. noted:at time of insp demo work in progress bldg partially down to 1st fl job site is not enclosed from all side as per code at east side of job site a fence per code was never install
May 10, 2006 · Penalty $500
Resolve - Hazardous
No sidewalk shed. noted:at time of insp demo work in progress bldg to be demolished stands at approx 30' the distance from the bldg to the inner edge of the sidewalk is approx 9' sidewalk shed was never
May 10, 2006 · Penalty $2,000
Resolve - Hazardous
Failure to safeguard public and property. noted:at time of insp demo work in progress at south side of job sitealong terrace fl debris was viewed on sidewalk (glass, brick etc). the debris was falling from
May 10, 2006 · Penalty $1,500
Resolve - Hazardous
Work w/o a permit. noted:at time of insp demo work in progress bldg partially down to 1st fl dob records shows no permit that was obtained for the work at above site the only permit on site per# 30214793z-01dm
May 10, 2006 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Jun 20, 2026 · Apt BLDG
Close - Plumbing
Water supply
Dec 26, 2024 · Apt 1B
Close - Paint/plaster
Wall
Sep 21, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Sep 21, 2011 · Apt 3E
Close - Paint/plaster
Wall
Sep 21, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Sep 21, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Sep 21, 2011 · Apt 3E
Close - Paint/plaster
Wall
Sep 20, 2011 · Apt 3E
Close - Paint/plaster
Wall
Sep 20, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Sep 20, 2011 · Apt 3E
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Sep 20, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Sep 20, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Aug 17, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Aug 17, 2011 · Apt 3E
Close - Plumbing
Water-leaks
Aug 17, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Aug 17, 2011 · Apt 3E
Close - Plumbing
Water-leaks
Aug 17, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Aug 16, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Aug 16, 2011 · Apt 3E
Close - Plumbing
Water-leaks
Aug 16, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Aug 16, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Aug 16, 2011 · Apt 3E
Close - Plumbing
Water-leaks
Aug 16, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Aug 15, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Aug 15, 2011 · Apt 3E
Close - Plumbing
Water-leaks
Aug 15, 2011 · Apt 3E
Close - Plumbing
Water-leaks
Aug 15, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Aug 14, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Aug 14, 2011 · Apt 3E
Close - Plumbing
Water-leaks
Aug 14, 2011 · Apt 3E
Close - Plumbing
Water-leaks
Aug 14, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Jul 12, 2011 · Apt 3E
Close - Paint/plaster
Wall
Jul 12, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Jul 12, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Jul 12, 2011 · Apt 3E
Close - Plumbing
Water-leaks
Jul 12, 2011 · Apt 3E
Close - General
Ventilation system
Jul 12, 2011 · Apt 3E
Close - Plumbing
Water-leaks
Jul 10, 2011 · Apt 3E
Close - Plumbing
Water-leaks
Jul 10, 2011 · Apt 3E
Close - Plumbing
Water-leaks
Jul 6, 2011 · Apt 3E
Close - Plumbing
Water-leaks
Jul 6, 2011 · Apt 3E
Close - Paint/plaster
Wall
Jul 6, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Jul 6, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Jul 6, 2011 · Apt 3E
Close - Paint/plaster
Wall
Jul 6, 2011 · Apt 3E
Close - Plumbing
Water-leaks
Jul 2, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Jul 2, 2011 · Apt 3E
Close - Paint/plaster
Wall
Jul 2, 2011 · Apt 3E
Close - Plumbing
Water-leaks
Jul 2, 2011 · Apt 3E
Close - Paint/plaster
Ceiling
Jul 2, 2011 · Apt 3E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RD)
- Year built
- 2006
- Floors
- 3
- Residential units
- 18
- Building area
- 19,145 ft²
- Lot area
- 12,888 ft²
- Zoning
- R5
- Community board
- 307
- Council district
- 39
- Block / lot
- 895 / 7503
- Assessed value
- $1,585,648
- Landmark / historic district
- No
HPD registration #380309, last renewed Aug 2, 2022.
Questions about 11 Terrace Place
Who owns 11 Terrace Place?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 11 Terrace Place have violations?
Yes. NYC HPD has recorded 37 housing violations at this property.
Is 11 Terrace Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 11 Terrace Place built?
City records list 2006 as the year it was built.
How many apartments are in 11 Terrace Place?
It has 18 residential units and 48 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.