1901 10 Avenue
Brooklyn, NY 11215BBL 3-00890-0001Map
Owner of record: 1901 Tenth Avenue LLC
1901 10 Avenue is an elevator apartment building built in 2019 in Brooklyn, 11215. It has 27 residential units across 3 floors. The owner of record is 1901 Tenth Avenue LLC. HPD has recorded 3 housing violations here, most recently on April 17, 2024. 1 of the 3 most recent violations are still open.
- HPD violations
- 3
- DOB violations
- 0
- ECB violations
- 16
- HPD complaints
- 14
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 3
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 8 sq. ft at north wall in the 2nd room from east at south located at apt 4c, 3rd story, 3rd apartment from east at south original violation 16405944 issued 16-nov-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Nov 16, 2023 · Apt 4C
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 8 sq. ft at north wall in the 2nd room from east at south located at apt 4c, 3rd story, 3rd apartment from east at south
Nov 16, 2023 · Apt 4C
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 16
- Class - 2
Bc3301.1.3-failure to ptovide manufacturer specificatiosn at time of inspection proposed 3 story new building observed active cosnbtrcution site compettent person on site at exp#3 or second floor observed ancho
Jun 5, 2020
Resolve - Class - 1
Failure to comply with manufacturer specifications.at the time of inspection of a 4 stoyr nb observed supported pipe scaffold at exp #4 installed not as per manufacturer specifications.observed cut frames at sc
Mar 5, 2020
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.at time of inspection on an active job site nb 4 story,i observed several balconies access with np caz sign,guardrails or caution
Jan 2, 2020
Resolve - Class - 2
Work does not conform to approved plans. noted:at time of inspection the detail for the cut pipe frames that are installed on the balconies at exposure#1,#2,and #4 is not in compliance w/ approved drawings. sto
Sep 16, 2019
Resolve - Class - 2
The installed windows on basement & 1st. floor with u-factor: u-0.29(casement) & u-0.28(fixed) contrary to u-0.26 indicated on window schedules on page a501.00 & on comchek on page en004.00. it is permitted to
Aug 2, 2019
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements.at the time of inspection i observed proposed 11 story nb complete to roof with ongoing activity present.i also observed contractor failed to m
Jul 22, 2019
Resolve - Class - 1
Bc3301.7 no design drawings. at time of inspection in response to complaint #3710950 observed worker on unsafe platform at the 2nd story level. the platform had not guardrails or toeboards and was not fully
Jul 12, 2019 · Penalty $2,500
Resolve - Class - 1
Inadequate perimeter guardrail system. at the time of my inspection of4 sty nb at 3rd elevation/2nd fl deck. i observed the window opening protection is constructed from metal studs & not frm dimensional lumber
Jun 20, 2019
Resolve - Class - 2
Work does not conform to approved construction documents-site safety plan. at the time of my inspection of a 4 sty nb at 3rd elevation/2nd fl deck,upon review of ssp,job site does not reflect. the bldg is above
Jun 20, 2019 · Penalty $625
Resolve - Class - 2
Failure to institute safety measures. no handrails. at the time of my inspection of 4 sty nb at 3rd elevation/2nd second floor deck,i observed workers 5 working on the q decking upon(reaching)the stairs to get
Jun 20, 2019 · Penalty $625
Resolve
Show 6 more ↓
- Class - 2
Construction superintendent failed to perform duties. at the time of my inspection of a 4 sty nb at 3rd elevation/2nd floor deck. i observedthe following conditoins,the site does not reflect the site safety pla
Jun 20, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to provide approved plans. on an energy compliance inspection i observed construction work without having approved plans., provide approved /accepted construction documents; please go to https://www1.ny
Jun 11, 2019
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection.atthe time of inspection i observed at a demolition job site construction fence unstable and out of plumb leaning towards pedestrian walkway a
May 22, 2018
Resolve - Class - 1
Bc3303.5.1 removal of combustible waste material. noted: i observed, at time of inspection, a pile of combustible debris approx. 2ft high by 6ft wide by 10ft long consisting of wood, 5 gal cans, cardboard boxes
Apr 14, 2018 · Penalty $625
Resolve - Hazardous
Failure to maintain exterior bldg wall.defect noted along entire facade and parapet walls.buldging brick leaning and loose and missing mortar.remedy:make all necessary repairs/maintain bldg wall
Apr 20, 2004 · Penalty $2,000
Resolve - Hazardous
Failure to maintain exterior bldg wall defect is entire facades from 10 ave side 19 st side defective brick work has numerous of cracks display cements party out of plumb loose mortar remedy make a safe obtain
Oct 23, 2003 · Penalty $800
Resolve
Complaints
- Heat/hot water
Apartment only
Feb 28, 2026 · Apt 1D
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 1E
Close - Water leak
Heavy flow
Dec 21, 2023 · Apt 3G
Close - Plumbing
Basin/sink
Dec 21, 2023 · Apt 3G
Close - Unsanitary condition
Mold
Dec 21, 2023 · Apt 3G
Close - General
Janitor/super
Dec 21, 2023 · Apt 3G
Close - Unsanitary condition
Mold
Dec 21, 2023 · Apt 3G
Close - Water leak
Heavy flow
Dec 21, 2023 · Apt 3G
Close - Unsanitary condition
Mold
Nov 10, 2023 · Apt 4C
Close - Heat/hot water
Apartment only
Jan 15, 2023 · Apt 1A
Close
Show 4 more ↓
- Plumbing
Water supply
Jan 15, 2023 · Apt 4C
Close - Unsanitary condition
Mold
Apr 26, 2022 · Apt 1B
Close - Door/window
Window frame
Apr 26, 2022 · Apt 1B
Close - Door/window
Window frame
Apr 26, 2022 · Apt 1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2019
- Floors
- 3
- Residential units
- 27
- Building area
- 24,864 ft²
- Lot area
- 15,025 ft²
- Zoning
- R5
- Community board
- 307
- Council district
- 39
- Block / lot
- 890 / 1
- Assessed value
- $2,549,700
- Landmark / historic district
- No
HPD registration #390890, last renewed Oct 30, 2025.
Questions about 1901 10 Avenue
Who owns 1901 10 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1901 Tenth Avenue LLC.
Does 1901 10 Avenue have violations?
Yes. NYC HPD has recorded 3 housing violations at this property.
Is 1901 10 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1901 10 Avenue built?
City records list 2019 as the year it was built.
How many apartments are in 1901 10 Avenue?
It has 27 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.