286 19 Street
Brooklyn, NY 11215BBL 3-00885-0036Map
Owner of record: 19 Street Bk LLC
286 19 Street is a walk-up apartment building built in 1931 in Brooklyn, 11215. It has 6 residential units across 3 floors. The owner of record is 19 Street Bk LLC. HPD has recorded 96 housing violations here, most recently on May 1, 2026. 2 of the 50 most recent violations are still open.
- HPD violations
- 96
- DOB violations
- 5
- ECB violations
- 1
- HPD complaints
- 79
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 96
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system no information at public hall, 1st story
Mar 10, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing metal hook and eye at vestibule at public hall, 1st story
Mar 10, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 28, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 22, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots and bricks on 2nd story balcony at building front
Aug 4, 2020
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 1st story
Sep 30, 2019
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Sep 30, 2019
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1f, 1st story, apartment at north
Apr 22, 2019 · Apt 1F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire rated ceiling at cellar
Feb 27, 2019
Open — Not complied with
Show 40 more ↓
- BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... on south wall / 4 square feet / in the bathroom located at apt 2f, 2nd story, apartment at east
Oct 20, 2018 · Apt 2F
Open — Defect letter issued - ANon-hazardous
Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also door chain guard in the entrance located at apt 2f, 2nd story, apartment at east
Oct 20, 2018 · Apt 2F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 2f, 2nd story, apartment at east
Oct 20, 2018 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2f, 2nd story, apartment at east
Oct 20, 2018 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2f, 2nd story, apartment at east
Oct 20, 2018 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain glazing at bathtub in the bathroom located at apt 2f, 2nd story, apartment at east
Oct 20, 2018 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile floor in the kitchen located at apt 2f, 2nd story, apartment at east
Oct 20, 2018 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at cellar
Jan 9, 2018
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective - in the entrance located at apt 3r, 3rd story, apartment at west
Jan 9, 2018 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3r, 3rd story, apartment at west
Jan 9, 2018 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east
Jan 9, 2018 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair the broken or defective bell and return buzz system from street entrance to located at apt 3r, 3rd story
Oct 13, 2017 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 2f, 2nd story, apartment at north
Aug 14, 2017 · Apt 2F
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of excessive storage of material obstructing access to fire escape window in the 1st room from north at east located at apt 2f, 2nd story, apartment at north
Aug 14, 2017 · Apt 2F
Closed — Violation closed - ANon-hazardous
Refit upper and lower sashes at 2nd window from east at south in the 4th room from north at east located at apt 1r, 1st story, 1st apartment from east at south
Jun 3, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly secure the loose light fixture at ceiling in the foyer located at apt 1r, 1st story, 1st apartment from east at south
Jun 3, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 1r, 1st story, 1st apartment from east at south
Jun 3, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Replace with new the missing lock at 2nd window from east at south in the 4th room from north at east located at apt 1r, 1st story, 1st apartment from east at south
Jun 3, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balances at lower sash at window in the 4th room from north at west located at apt 1r, 1st story, 1st apartment from east at south
Jun 3, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly secure the loose all hinges at door in the 4th room from north at west located at apt 1r, 1st story, 1st apartment from east at south
Jun 3, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 4th room from north at west located at apt 1r, 1st story, 1st apartment from east at south
Jun 3, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the foyer located at apt 1r, 1st story, 1st apartment from east at south
Jun 3, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Jun 3, 2017 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposing electrical wires at ceiling in the foyer located at apt 1r, 1st story, 1st apartment from east at south
Jun 3, 2017 · Apt 1R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Jun 3, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Jun 3, 2017 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective inoperative bell and buzzer return intercom system at building front entrance to system in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Jun 3, 2017 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Jun 3, 2017 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north at west located at apt 1r, 1st story, 1st apartment from east at south
Jun 3, 2017 · Apt 1R
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 6, 2015
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles on the east and south walls in the bathroom located at apt 3f, 3rd story, apartment at north
Feb 9, 2012 · Apt 3F
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north at west located at apt 3f, 3rd story, apartment at north
Feb 9, 2012 · Apt 3F
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north at east located at apt 3f, 3rd story, apartment at north
Feb 9, 2012 · Apt 3F
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective marble saddle at entrance in the bathroom located at apt 3f, 3rd story, apartment at north
Feb 9, 2012 · Apt 3F
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2f, 2nd story, apartment at north
Feb 9, 2012 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair the broken or defective lower sash counter balances on both windows in the 1st room from north at east located at apt 2f, 2nd story, apartment at north
Feb 9, 2012 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the 2nd room from north located at apt 2f, 2nd story, apartment at north
Feb 9, 2012 · Apt 2F
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 1f, 1st story, apartment at north
Feb 9, 2012 · Apt 1F
Closed — Violation closed - BHazardous
Properly repair the broken or defective upper and lower sashs at the window in the kitchen located at apt 3f, 3rd story, apartment at north
Feb 9, 2012 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair the broken or defective wood cabinet north wall in the kitchen located at apt 1-r, 1st story, apartment at south
May 24, 2001 · Apt 1-R
Closed — Violation closed
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Construction other optional
Stop all work contyact the borough commissioner at 718 802-3677
Feb 17, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Mar 27, 1989
Dob violation - dismissed
ECB violations · 1
- Class - 2
No chimney clean out, excessive oil residue under burner, lwc blow down not piped correctly, exposed wiring, debis in boiler room, no remote switch, boiler room door not self closing. correct violating conditio
Sep 19, 2022 · Penalty $1,562
Resolve
Complaints
- Unsanitary condition
Mold
Jul 10, 2025 · Apt 2F
Close - Heat/hot water
Entire building
Mar 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2024 · Apt BLDG
Close - Flooring/stairs
Stairs
Nov 13, 2024 · Apt 3A
Close - Heat/hot water
Entire building
Mar 9, 2024 · Apt BLDG
Close - Water leak
Heavy flow
Oct 18, 2023 · Apt 2F
Close - Door/window
Door
Oct 18, 2023 · Apt 2F
Close - Water leak
Slow leak
Oct 18, 2023 · Apt 2F
Close - Unsanitary condition
Mold
Oct 18, 2023 · Apt 2F
Close - Electric
Outlet/switch
Oct 18, 2023 · Apt 2F
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
May 21, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 15, 2020 · Apt 1F
Close - Heat/hot water
Apartment only
Nov 24, 2020 · Apt 1F
Close - Heat/hot water
Apartment only
Nov 23, 2020 · Apt 2R
Close - Heat/hot water
Apartment only
Nov 18, 2020 · Apt 2R
Close - Water leak
Heavy flow
Apr 17, 2019 · Apt 1F
Close - Heat/hot water
Apartment only
Mar 20, 2019 · Apt 1F
Close - Heat/hot water
Apartment only
Mar 13, 2019 · Apt 1F
Close - Heat/hot water
Entire building
Feb 2, 2019 · Apt 1F
Close - Heat/hot water
Entire building
Feb 2, 2019 · Apt 1F
Close - Appliance
Electric/gas range
Oct 15, 2018 · Apt 2F
Close - Flooring/stairs
Floor
Oct 15, 2018 · Apt 2F
Close - Unsanitary condition
Mold
Oct 15, 2018 · Apt 2F
Close - Flooring/stairs
Floor
Sep 17, 2018 · Apt 2F
Close - Appliance
Electric/gas range
Sep 17, 2018 · Apt 2F
Close - Unsanitary condition
Mold
Sep 17, 2018 · Apt 2F
Close - Flooring/stairs
Floor
Jul 5, 2018 · Apt 2F
Close - Unsanitary condition
Mold
Jul 5, 2018 · Apt 2F
Close - Heat/hot water
Entire building
Mar 21, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2017 · Apt 3R
Close - General
Janitor/super
Oct 13, 2017 · Apt 3R
Close - General
Cooking gas
Sep 27, 2017 · Apt BLDG
Close - General
Cooking gas
Sep 27, 2017 · Apt 3R
Close - General
Bell/buzzer/intercom
Sep 27, 2017 · Apt 3R
Close - Paint/plaster
Ceiling
May 26, 2017 · Apt 1R
Close - General
Bell/buzzer/intercom
May 26, 2017 · Apt 1R
Close - Water leak
Slow leak
May 26, 2017 · Apt 1R
Close - Door/window
Window frame
May 26, 2017 · Apt 1R
Close - Paint/plaster
Wall
May 26, 2017 · Apt 1R
Close - Door/window
Window frame
May 26, 2017 · Apt 1R
Close - Electric
Lighting
May 26, 2017 · Apt 1R
Close - Paint/plaster
Ceiling
May 26, 2017 · Apt 1R
Close - Heat/hot water
Apartment only
May 26, 2017 · Apt 1R
Close - Unsanitary condition
Sewage
May 26, 2017 · Apt 1R
Close - Water leak
Slow leak
Mar 7, 2017 · Apt 1F
Close - Safety
Window guard broken/missing
Apr 19, 2016 · Apt 2F
Close - Safety
Window guard broken/missing
Apr 19, 2016 · Apt 2F
Close - Heat/hot water
Entire building
Feb 20, 2016 · Apt 2F
Close - Heat/hot water
Entire building
Feb 20, 2016 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,800 ft²
- Lot area
- 2,504 ft²
- Zoning
- R6B
- Community board
- 307
- Council district
- 39
- Block / lot
- 885 / 36
- Assessed value
- $859,500
- Landmark / historic district
- No
HPD registration #336404, last renewed Oct 9, 2025.
Questions about 286 19 Street
Who owns 286 19 Street?
The owner of record in NYC Department of City Planning PLUTO data is 19 Street Bk LLC.
Does 286 19 Street have violations?
Yes. NYC HPD has recorded 96 housing violations at this property.
Is 286 19 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 286 19 Street built?
City records list 1931 as the year it was built.
How many apartments are in 286 19 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.