270 19 Street
Brooklyn, NY 11215BBL 3-00885-0027Map
Owner of record: 1828 Richmond Terrace, LLC
270 19 Street is a walk-up apartment building built in 2022 in Brooklyn, 11215. It has 4 residential units across 4.5 floors. The owner of record is 1828 Richmond Terrace, LLC. HPD has recorded 12 housing violations here, most recently on May 8, 2026. 2 of the 12 most recent violations are still open.
- HPD violations
- 12
- DOB violations
- 1
- ECB violations
- 12
- HPD complaints
- 4
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 12
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Jul 3, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 3, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jul 3, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 3, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jul 3, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jul 3, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2, 2nd story, 1st apartment from south at west
Jul 3, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges. at public hall, 1st story
Jul 3, 2024
Closed — Violation closed
Show 2 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at window recess in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from south at west
Jul 3, 2024 · Apt 2
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Jul 3, 2024 · Apt 2
Open — Notice of issuance sent to tenant
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 31, 2017
Dob violation - dismissed
ECB violations · 12
- Class - 2
Observed failure to maintain/construct fence at exposure#1&3obtain relevent d.o.b and d.o.t permits; construct and maintain fence
Jun 29, 2023
Resolve - Class - 2
At time of inspection of an active jobsite, i observed a supported scaffold installed at exposure 3 with missing stacking pins, mismatched scaffold frames, no debris netting, planks not tied down, and inadequat
Feb 2, 2023 · Penalty $625
Resolve - Class - 2
At time of inspection of an active jobsite, i observed that there was no overhead protection at the rear of exposure 2 and 4 for the adjacent properties. upon review of the site safety plan, i discovered that o
Feb 2, 2023
Resolve - Class - 1
At the time of my inspection, of a proposed 4 story new building, in the foundation phase, observed means of egress and ingress provided does not meet code specifications, ladder is not tall enough to give 3 ru
Jul 19, 2022 · Penalty $2,500
Resolve - Class - 1
At the of time of inspection, observed an excavation at exposure # 4 work not conforming to approved lagging details, drawings do not give detail on how to close off lagging at exposure # 4, stop all work provi
Jul 19, 2022 · Penalty $625
Resolve - Class - 1
At time of inspection i observed concrete truck parked on the sidewalk obstructing the pedestrian access way during construction operation upon requesting for dot permits obtain to obstruct and block the sidewa
Jul 6, 2022 · Penalty $2,500
Resolve - Class - 1
At time of inspection i observed concrete truck parked on the sidewalk blocking the pedestrian during construction operation, inspection reveals there was no flagmen in place to direct and control pedestrian t
Jul 6, 2022 · Penalty $2,500
Resolve - Class - 2
Maintenance of project information panels.note:at time of inspection of non active jobsite observed project information panel at exp #1 no maintained not completely legible obscured by multiple unlawful marking
Apr 1, 2022
Resolve - Class - 2
Temporary construction equipemnt on site expired permit(jobsite fence)noted:at time of demo-monitoring upon review in bis/dob new observed jobsite fence expired on 09/12/18 .renew permit
Jan 30, 2019
Resolve - Class - 2
Work w/out a permit, expired permit, noted: a check of dept records, @ time of insp, indicates that the fence permit expired on 7/23/2017. rem: renew permit.
Aug 2, 2017 · Penalty $400
Resolve
Show 2 more ↓
- Class - 1
Failure to provide required notification prior to the commencement of demolition. noted: a check of dept records at time of inspection,indicated that notification was not given. remedy: notify the dept.
Mar 3, 2017 · Penalty $1,200
Resolve - Non-hazardous
Ocupancy contary to that allowed by building dept. records. two familyoccupied as three family with occupancy cellar at time of inspection. remedy;discontinue illegal occupancy and obtain a new cofo only if fea
Jul 29, 1993 · Penalty $350
Resolve
Complaints
- Paint/plaster
Window/frame
Jul 1, 2024 · Apt 2
Close - Unsanitary condition
Pests
Jul 1, 2024 · Apt 2
Close - Paint/plaster
Window/frame
Jun 14, 2024 · Apt 2
Close - Unsanitary condition
Pests
Jun 14, 2024 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 2022
- Floors
- 4.5
- Residential units
- 4
- Building area
- 5,056 ft²
- Lot area
- 2,504 ft²
- Zoning
- R6B
- Community board
- 307
- Council district
- 39
- Block / lot
- 885 / 27
- Assessed value
- $715,500
- Landmark / historic district
- No
HPD registration #391137, last renewed Jan 29, 2026.
Questions about 270 19 Street
Who owns 270 19 Street?
The owner of record in NYC Department of City Planning PLUTO data is 1828 Richmond Terrace, LLC.
Does 270 19 Street have violations?
Yes. NYC HPD has recorded 12 housing violations at this property.
Is 270 19 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 270 19 Street built?
City records list 2022 as the year it was built.
How many apartments are in 270 19 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.