643 5th Avenue
Brooklyn, NY 11215BBL 3-00879-0007Map
Owner of record: Wan Long Realty LLC
643 5th Avenue is an elevator apartment building built in 2022 in Brooklyn, 11215. It has 21 residential units across 7 floors. The owner of record is Wan Long Realty LLC. HPD has recorded 30 housing violations here, most recently on March 25, 2004. 30 of the 30 most recent violations are still open.
- HPD violations
- 30
- DOB violations
- 7
- ECB violations
- 19
- HPD complaints
- 13
Available now in this building
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 30
- ANon-hazardous
Refit window front west rear room, east window 2nd story apt.
Mar 25, 2004
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling center north west room, 2nd story apt #1. er-1
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling bathroom 2nd story apt #1. er-1
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Replace with new the missing window pane lower sash front southwest room, 2nd story apt. #1. er-1
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet bathroom 2nd story apt. #1. er-1
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Provide gas to stove kitchen, 2nd story apt. #1. er-1
Mar 24, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling of center southroom--2nd story apt.
Mar 24, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling of 2nd sty. public hall
Mar 24, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling of kitchen 2nd story apt.
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color bathroom ceiling at 2nd story apt.
Mar 24, 2004
Open — Nov sent out
Show 20 more ↓
- CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiing at 1st room off kitchen at north 2nd story apt.
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling at 2nd story public hall.
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Replace with new the missing window glass front room south lower sash center window at 2nd story apt.
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Replace with new the missing window glass front room north lower sash at 2nd story apt.
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures kitchen and wash basin at 2nd story apt.
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures kitchen and wash basin at bathroom 2nd story apt.
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range kitchen, 2nd story apt. er-1
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures kitchen and bathroom, 2nd story apt. er-1
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures kitchen and bathroom, 2nd story apt. er-1
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective rotted support posts main beam cellar center. er-1
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet bathroom, 2nd story apt. 1.
Mar 24, 2004
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceilings 2nd story apt throughout.
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Replace with new the missing window pane lower sash front north west room, 2nd story apt. #1. er-1
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Abate the nuisnace consisting of rodents 2nd story apt.
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures kitchen and bathroom 2nd story apt.
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures kitchen range at 2nd story apt.
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures kitchen and bathroom fixtures including water closet 2 story apt. er-1.
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures kitchen and bathroom fixtures 2 story apt. er-1.
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet 2nd story apt er-2.
Mar 24, 2004
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling throu-out 2nd story apt #2
Jul 10, 2003
Open — Nov sent out
DOB building violations · 7
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Construction other optional
Stop all work except to make site safe
Apr 6, 2021
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 8, 1991
Vp*-violation unserved ecb- dismissed
ECB violations · 19
- Class - 2
Failure to install/maintain supported scaffold as per code: it was observed supported pipe scaffold at exp.2 - missing toe boards, missing guardrails, platforms not tied down and not fully planked with loose ne
Aug 30, 2023
Resolve - Class - 2
At inspection, it was observed: failure to maintain safe operations xiao song wang was observed on the leading edge of the balcony at the 3rd floor not tied down and no guard rails system at the balcony exposi
Aug 30, 2023 · Penalty $5,000
Resolve - Class - 2
At inspection, it was observed: sidewalk shed at exposure-1 and upon request for the letter of installation and letter of periodic re-inspection after 6- months none was available or presented contrary to code.
Aug 30, 2023 · Penalty $1,250
Resolve - Class - 2
At inspection, it was observed: as per bc 3307.6.4.2.2 & 3307.6.5.5 storage on sidewalk shed and cleaning was contrary to above codes provisions drawing presented did not shown mangled debris and carcass of sca
Aug 30, 2023 · Penalty $2,400
Resolve - Class - 1
Observed 1 mean egress on the main floor (ground level) which is contrary to the site safety plan that states "2 means of egress o is to be maintained at all times. this condition presents a trapped hazard for
Apr 13, 2023
Resolve - Class - 2
Observed general contractor failed to provide valid dot permits for roadway occupancy at exposure #1, this is a clear violation and is not in compliance w/ code.cease all occupancy of roadway at exposure #1 or
Apr 13, 2023
Resolve - Class - 1
Observed scaffold not inspected, built or maintained per code, inadequate housekeeping no daily removal of garbage & accumulation & storage of combustibles, standing water in elevator shaft, unlawful occupancy
Apr 13, 2023
Resolve - Class - 2
Observed excessive materials stored on sidewalk shed and has not been removed daily as required. this condition is a clear violation and is not in compliance w/ sections 3307.6.4.2.2 & 3307.6.5.5 of the buildin
Apr 13, 2023
Resolve - Class - 2
Observed supp scaff not erected per plan 28-105.12.2, maintained per code 3314.4.8, free of debris 3314.4.4.5, having proper connections per manu specs 3314.13.2 7 & improperly tied to structure 3314.6. also no
Apr 13, 2023 · Penalty $625
Resolve - Class - 2
No dot permits, loads imposed letter (sws), access agreement letter for 641 5th ave, daily inspection for supported scaffold, install letters for supported scaffold or the sidewalk shed was provided at the ti
Apr 13, 2023
Resolve
Show 9 more ↓
- Class - 1
3304.8 & 3304.14.2 failure to drain construction site of standing water.as noted:at time of inspection at active jobsite for proposed 7 story building observed aprox 5-6 ft of ground water at cellar level at el
Jan 19, 2023 · Penalty $625
Resolve - Class - 1
Failure to maintain adequate housekeeping not pursuant to subsection.as noted:at time of inspection at active jobsite for proposed 7 story building observed at fl #1 at exp #1 grade level heaps of garbage place
Jan 19, 2023 · Penalty $625
Resolve - Class - 1
Work afterhours without variance. at time of inspection i observed afterhours work being performed throughout entire jobsite without gc having an afterhours variance., obtain after hours variance
Dec 3, 2022
Resolve - Class - 2
Work does not conform to approved construction docuemnts & or approved amendments.as noted:at time of inspection on active construction site 7 story new building rebar placement work at floor #2 observed at exp
Oct 13, 2022 · Penalty $3,125
Resolve - Class - 1
Failure to obtain license to enter adjoining property. observed underpinning operation of adjoining property at exp#3. upon request for license agreement to enter adjoining property at exp#3, none were provided
Sep 1, 2022 · Penalty $2,500
Resolve - Class - 2
Work not conforming to soe plan. observed utility pole at corner of exp#3 and exp#4 imbedded into concrete and sitting on metal beam. upon review of soe and ssp plans provided on site, there is no indication of
Aug 31, 2022 · Penalty $3,125
Resolve - Class - 2
Observed # of soldier piles installed at rear of exposure #2 does not conform to # of piles on plan page soe 104.00. also, approached pit is missing at excavated area at underpinning pit greater than 6ft @ expo
Jul 15, 2022
Resolve - Non-hazardous
Occupancy contrary to that allowed by dept. records store converted to restaurant food & drink service without a certificate of occupancy. 2k4 being 2 story store + dwelling above. remedy: discontinue illegal u
Oct 8, 1991 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain defect is two rotted lf beam at first sty north/eas/ corner loose and missing plaster at secont sty south sectioncenter room no. wall missing and loose ceiling plast. over stairs
Aug 2, 1988 · Penalty $200
Resolve
Complaints
- Heating
Heat related
Apr 16, 2007 · Apt 2FL
Close - Heating
Heat related
Apr 15, 2007 · Apt 2FL
Close - Heating
Heat related
Feb 11, 2007 · Apt 2
Close - General
Windows
Feb 11, 2007 · Apt 2FL
Close - Plumbing
Radiator
Feb 11, 2007 · Apt 2FL
Close - Heating
Heat related
Feb 11, 2007 · Apt 2FL
Close - Paint/plaster
Wall
Feb 11, 2007 · Apt 2FL
Close - General
Floor
Feb 11, 2007 · Apt 2FL
Close - Heating
Heat related
Apr 5, 2006 · Apt 2FL
Close - Electric
Bell-buzzer/intercom
Apr 5, 2006 · Apt 2FL
Close
Show 3 more ↓
- Appliance
Electric/gas range
Nov 24, 2005 · Apt 2FL
Close - Heating
Heat related
Nov 24, 2005 · Apt 2FL
Close - General
Windows
Nov 24, 2005 · Apt 2FL
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Nov 21, 2025 | Non-market transfer | Rentals - elevator apartments | 22 |
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2022
- Floors
- 7
- Residential units
- 21
- Building area
- 25,489 ft²
- Lot area
- 5,017 ft²
- Zoning
- R6A
- Community board
- 307
- Council district
- 39
- Block / lot
- 879 / 7
- Assessed value
- $2,495,250
- Landmark / historic district
- No
Questions about 643 5th Avenue
Who owns 643 5th Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Wan Long Realty LLC.
Does 643 5th Avenue have violations?
Yes. NYC HPD has recorded 30 housing violations at this property.
Is 643 5th Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 643 5th Avenue built?
City records list 2022 as the year it was built.
How many apartments are in 643 5th Avenue?
It has 21 residential units and 22 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.