1713 8 Avenue
Brooklyn, NY 11215BBL 3-00876-0003Map
Owner of record: 1713 Equities LLC
1713 8 Avenue is an office building built in 1930 in Brooklyn, 11215. The owner of record is 1713 Equities LLC. HPD has recorded 14 housing violations here, most recently on December 29, 2025. 9 of the 14 most recent violations are still open.
- HPD violations
- 14
- DOB violations
- 28
- ECB violations
- 16
- HPD complaints
- 17
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door to roof
Dec 29, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door to stairway at public hall, 1st story
Dec 29, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door at public hall, 1st story
Dec 29, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch assembly at building entrance door at public hall, 1st story
Dec 29, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective latch assembly at bldg front entrance door
Nov 14, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Nov 14, 2025
Open — Not complied with - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story
Nov 14, 2025
Open — Not complied with - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 14, 2025
Open — Not complied with - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Nov 14, 2025
Open — Not complied with - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Nov 14, 2025
Open — Not complied with
Show 4 more ↓
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Nov 14, 2025
Open — Not complied with - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all walls and ceilings throughout in the entire apartment located at apt 1i, 1st story, 1st apartment from north at east
Oct 21, 2025 · Apt 1I
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 9, 2025
Open — Not complied with - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Oct 9, 2025
Open — Not complied with
DOB building violations · 28
- High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Construction other optional
Damage observed on exp#3 wall during 7/11/25 site visit cracks, settlement & loose bricks pose hazard to life & property. remedy: retain nys rdp for weekly inspections & monitoring. submit plan & baseline by 8/8/25. email reports to cse
Jul 31, 2025
Dob violation - dismissed - Construction other optional
.vio25-50508
Jul 2, 2025
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed
Show 18 more ↓
- High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 5, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 5, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 2, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 1, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - dismissed
ECB violations · 16
- Class - 2
Gc fail to file certificate of correction with dob. no corrective measures on records for violation# 39542099z issued 07/08/2025.
Sep 2, 2025 · Penalty $1,250
Resolve - Class - 2
Gc fail to file certificate of correction with dob. no corrective measures on records for violation# 39542092x issued 07/08/2025.
Sep 2, 2025 · Penalty $1,250
Resolve - Class - 1
Exterior wall at exp3 not in conformance with plans. observed exposed wall and plumbing at exp#3 at existing window openings. upon review of approved plans, it was observed that plans call for 13 out of 16 exis
Jul 8, 2025 · Penalty $2,500
Resolve - Class - 1
Observed exterior wall at exp#3 not maintained as per code. observed multiple loose bricks hanging on wall and bricks that already fell onto adjacent property. also, observed excessive cracks throughout wall. c
Jul 8, 2025 · Penalty $2,500
Resolve - Class - 2
Failure to provide adequate overhead protection to adjacent property 451 18 st during construction operations. observed masonry brick debris and construction debris at rear yard of adjacent property without ade
Jun 24, 2025 · Penalty $2,500
Resolve - Class - 2
At time of inspection observed adjustable suspended scaffold in place & installed at roof level with clamps attached to parapet. upon review department of records no notification for suspended scaffold observed
Apr 2, 2025 · Penalty $2,500
Resolve - Class - 1
Gc failure to comply with stop work order reference # 3989585. observed roof level bulkhead completed while on a stop work order. stop all work under permit# b01055195-i1-gc.
Mar 19, 2025 · Penalty $12,500
Resolve - Class - 1
Building under alteration observed active construction site, proposed conversion of commercial building to 4- story 29 units residential (more 50 percent of area is affected). i asked multiple workers on each
Feb 3, 2025 · Penalty $10,000
Resolve - Class - 1
At time of inspection observed adjacent building 1711 8 avenue fire escape drop ladder landing onto/behind construction fence onto construction site.; bc3301.2, comply with code
Jan 19, 2025 · Penalty $5,000
Resolve - Class - 2
At time of inspection observed ahv work in process 4 construction workers working on site. no ahv permit found on dob record. stop all ahv work., obtain after hours variance
Jan 19, 2025 · Penalty $625
Resolve
Show 6 more ↓
- Class - 1
At the time of the inspection, the contractor failed to safeguard the neighbor's property. at exposure 3 of the building, there is a window that was broken, and a piece of glass fell onto the neighbor's propert
Jan 14, 2025
Resolve - Class - 2
After hours stop work order issued due to 5 workers observed pouring concrete footings and other construction operations along exposure 4 interior wall. no after hours variance obtained job# b01055195, obtain a
Jan 7, 2025 · Penalty $1,250
Resolve - Class - 1
Observed at exposure#3 construction operations have affected neighboring(451 18 street) property. construction debris falling in rear yard with no over head protection., safeguard public and property; provide p
Jan 3, 2025
Resolve - Class - 1
Wwop, observed plumbing work in progress wihtout a plumbing permit. also a vertical crack observed at exposure#3., obtain permit
Jan 3, 2025
Resolve - Class - 2
A8 failure to maintain building in a code compliant manner two pieces of sheet metal at roof level of 4 story loft building are loose defective, repair and/or replace
Mar 5, 2023 · Penalty $1,562
Resolve - Non-hazardous
73x 73)restore to service for complete inspection or file for removal.
Sep 22, 1999 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Apartment only
Mar 2, 2026 · Apt 1C
Close - Plumbing
Water supply
Jan 31, 2026 · Apt BLDG
Close - Door/window
Window pane
Oct 20, 2025 · Apt 1I
Close - Unsanitary condition
Pests
Oct 20, 2025 · Apt 1I
Close - Electric
Power outage
Oct 20, 2025 · Apt 1I
Close - Unsanitary condition
Pests
Oct 20, 2025 · Apt 1I
Close - Paint/plaster
Wall
Oct 18, 2025 · Apt 1L
Close - Electric
Power outage
Oct 18, 2025 · Apt 1L
Close - Electric
Power outage
Oct 17, 2025 · Apt 1L
Close - Door/window
Window frame
Oct 17, 2025 · Apt 1L
Close
Show 7 more ↓
- Electric
Power outage
Oct 14, 2025 · Apt 1L
Close - Door/window
Window pane
Oct 14, 2025 · Apt 1L
Close - Unsanitary condition
Pests
Oct 14, 2025 · Apt 1L
Close - Unsanitary condition
Pests
Oct 14, 2025 · Apt 1L
Close - Heat/hot water
Entire building
Mar 19, 2024 · Apt BLDG
Close - Water leak
Slow leak
Sep 5, 2019 · Apt 10
Close - Unsanitary condition
Mold
Sep 5, 2019 · Apt 10
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O5)
- Year built
- 1930
- Floors
- 3.25
- Residential units
- —
- Building area
- 12,000 ft²
- Lot area
- 5,008 ft²
- Zoning
- R5B
- Community board
- 307
- Council district
- 39
- Block / lot
- 876 / 3
- Assessed value
- $1,309,050
- Landmark / historic district
- No
Questions about 1713 8 Avenue
Who owns 1713 8 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1713 Equities LLC.
Does 1713 8 Avenue have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 1713 8 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1713 8 Avenue built?
City records list 1930 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.