249 18th Street
Brooklyn, NY 11215BBL 3-00873-0075Map
Owner of record: 247 18 Street LLC
249 18th Street is an elevator apartment building built in 2024 in Brooklyn, 11215. It has 5 residential units. The owner of record is 247 18 Street LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 0
- ECB violations
- 26
- HPD complaints
- 0
Available now in this building
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 0
No DOB violations on record
ECB violations · 26
- Class - 2
Observed pipe scaffold fully planked at multiple at multiple levels, instead of the required 1 level max planked at a time. cross braces substituted for guardrails & toe-boards. cross braces not adequately inst
Dec 12, 2024 · Penalty $625
Resolve - Class - 1
Bc 3314.4. supported pipe scaffold not maintained as per code, observed active scaffold at exp#1&3 not as per code, scaffold missing guardrail system, loose planks, planks not tied down, worker sitting on loose
Oct 29, 2024 · Penalty $5,000
Resolve - Class - 2
Observed sidewalk shed in place at exp#1, upon review the approved sidewalk shed drawings, observed drawings call for sidewalk to extend to cover the area above adjacent building exp#2 including beams, corrugat
Oct 29, 2024 · Penalty $625
Resolve - Class - 1
Bc 3307.5 watchperson and flagperson. observed delivery operations in process with roadway and sidewalk fully closed for traffic and pedestrians with no flag person or warning sign in place to direct the traffi
Oct 29, 2024 · Penalty $5,000
Resolve - Class - 2
Observed excessive debris throughout all the floor, debris consisting of wood, garbage bags, plywood, and other debris and materials. this condition pose a tripping hazard, fire hazard and rodent infestation. s
Oct 29, 2024 · Penalty $1,250
Resolve - Class - 1
Bc3307.2 failure to comply with dot regulations. observed delivery operation in process with roadway and sidewalk fully enclosed for traffic and pedestrians and no warning signs. upon review dot permit#a63 stat
Oct 29, 2024 · Penalty $5,000
Resolve - Class - 1
Observed active delivery operations and exterior work using supported pipe scaffold, upon inspection observed pre-shift safety meeting provided was inadequately communicated. pre-shift was typical for each day
Oct 29, 2024 · Penalty $5,000
Resolve - Class - 1
Observed active brick hoisting operations using pully system consisting of a plastic bucket, rope attached around shoring post between elevator shaft walls. upon request from pm, competent person and superinten
Oct 29, 2024 · Penalty $2,500
Resolve - Class - 1
Miscellaneous violations. bc3307.2 failure to comply with dot regulations. observed delivery operation in process with roadway and sidewalk fully enclosed for traffic and pedestrians and no warning signs. upon
Oct 29, 2024 · Penalty $5,000
Resolve - Class - 1
Miscellaneous violations. bc 3307.5 watchpersons and flagperson. observed delivery operations in process with roadway and sidewalk full closed for traffic and pedestrians with no flag person or warning sign in
Oct 29, 2024 · Penalty $5,000
Resolve
Show 16 more ↓
- Class - 1
Miscellaneous violations. bc 3314.4. supported pipe scaffold not maintained as per code, observed active scaffold at exp #1 and 3 not as percode, scaffold missing guardrail system, loose planks, planks not tied
Oct 29, 2024 · Penalty $5,000
Resolve - Class - 1
Failure to maintain/display on site documents required by bc chapter 33. observed active brick hoisting operations using pully system consisting of a plastic bucket, rope attached around shoring post between el
Oct 29, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. observed excessive debris throughout all the floor debris consisting of wood, garbage bags, plywood, and other debris and materials. this cond
Oct 29, 2024 · Penalty $1,250
Resolve - Class - 1
Failure to communicate required information to workers during pre-shift safety meeting. observed active delivery operations and exterior work using supported pipe scaffold, upon inspection observed pre-shift sa
Oct 29, 2024 · Penalty $5,000
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. observed sidewalk shed in place at exp #1, upon review the approved sidewalk shed draawings, observed drawings call for sidew
Oct 29, 2024 · Penalty $1,250
Resolve - Class - 2
No en drawing approved from dob provided in the job site at the time of inspection., maintain/display required documents; please go to https://www1.nyc.gov/site/buildings/codes/energy-conservation-code.page and
Aug 8, 2024 · Penalty $1,250
Resolve - Class - 1
Bc3309.17 inadequate site specific engineered enclosure systems. observed engineered enclosure system installed not as per code. missing wire scree. wire screen must be #16 steel wire, backed by debris netting.
Aug 1, 2024 · Penalty $5,000
Resolve - Class - 1
Observed site specific engineered enclosure systems and scaffold installed not as per approved drawings. observed multiple levels planked with osha planks, drawings call for only 1 level planked. this condition
Aug 1, 2024 · Penalty $2,500
Resolve - Class - 2
Bc 3301.2. failure to safeguard adjacent property. observed evidence of falling debris and materials on adjacent building exp#4 on 2nd floor setback. observed no safety measures in place ( caz/ohp) to protect a
Jul 3, 2024 · Penalty $2,500
Resolve - Class - 2
Bc 3309.1 protection required. observed inadequate roof protection for adjoining property exp#2, observed missing parapet protection, missing ac equipment protection, missing bulkhead protection. this condition
Jul 3, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to provide special inspection of concrete placement tr1. as noted: at time of inspection for an active construction site failure to provide special inspection of concrete placement cart in place for the
Jun 27, 2024 · Penalty $2,500
Resolve - Class - 2
Work not conform to approved construction documents and for approved amendments: as noted at time of inspection for an active job site observed at 1st to the roof the opening for the elevator door was wide then
Jun 27, 2024 · Penalty $3,125
Resolve - Class - 1
Failure to maintain building in code compliant manner.on 5/5/17 at approx 2:00pm i observed in apt 206 gas flexible price in the cabinet,apt 209 a new gas hvac system installed with prohibited material for the
May 5, 2017 · Penalty $1,000
Resolve - Class - 1
Faiilure to have new or altered plumbing system tested on 5/5/17 at approx 2:00pm i observed in apts 201,206,208,209,305,308, and 309 gas piping and fittings installed without no gas test performed under dob re
May 5, 2017 · Penalty $1,000
Resolve - Class - 1
Gas being supplied to building without inspection and certification bydob.on 05/5/17 at approx 2:00pm i observed in apts 201,206,208,209,305,308,and 309 gas piping installation supplying gas without no inspecti
May 5, 2017 · Penalty $1,000
Resolve - Class - 1
Work without a permit.on 5/5/17 at approx 2:00pm i observed in apts 201,206,208,209,308,309 gas piping and gas fittings installed supplying gas stores.apt 206 gas piping installed for a new after apt 209 new ga
May 5, 2017 · Penalty $1,600
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2024
- Floors
- —
- Residential units
- 5
- Building area
- 7,585 ft²
- Lot area
- 2,555 ft²
- Zoning
- R6A
- Community board
- 307
- Council district
- 39
- Block / lot
- 873 / 75
- Assessed value
- $517,500
- Landmark / historic district
- No
Questions about 249 18th Street
Who owns 249 18th Street?
The owner of record in NYC Department of City Planning PLUTO data is 247 18 Street LLC.
Does 249 18th Street have violations?
NYC HPD has no housing violations on record for this property.
Is 249 18th Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 249 18th Street built?
City records list 2024 as the year it was built.
How many apartments are in 249 18th Street?
It has 5 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.