roofy

Violations at 327 59 Street

Brooklyn, NY 11220 · BBL 3-00854-0064 · Back to the property

HPD housing violations

47 HPD violations, newest first.

  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at ceiling rear at cellar

    Sep 1, 2023

    Open — Invalid certification
  • BHazardous

    Properly repair with similar material the broken or defective fire retardant material at ceiling at rear at cellar

    Sep 1, 2023

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the smoke detector missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east

    Sep 1, 2023 · Apt 3R

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east

    Sep 1, 2023 · Apt 3R

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east

    Sep 1, 2023 · Apt 3R

    Closed — Violation dismissed
  • BHazardous

    Properly secure the loose wood handrail at public hall, 1st story

    Sep 1, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at south wall at public hall, 1st story

    Sep 1, 2023

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective fire retardant material at south wall at public hall, 1st story

    Sep 1, 2023

    Closed — Violation dismissed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 2nd room from north located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Open — Invalid certification
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, east wall, 1st window frame from west at north wall in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Open — Invalid certification
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st door frame from south at west wall in the foyer located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Open — Invalid certification
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Open — Invalid certification
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Open — Invalid certification
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 1, 2019

    Open — Invalid certification
  • CImmediately hazardous

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system - missing at public hall, 1st story

    Oct 1, 2019

    Open — Invalid certification
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Oct 1, 2019

    Open — Invalid certification
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box - missing at public hall, 1st story

    Oct 1, 2019

    Open — Invalid certification
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Oct 1, 2019

    Closed — Violation dismissed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Oct 1, 2019

    Closed — Violation dismissed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... (approx. 10 sq ft) at ceiling, north wall, south wall, east wall, 1st door frame from south at west wall in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at north wall, south wall, east wall, 1st door frame from south at west wall in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Open — Invalid certification
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall, south wall in the foyer located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall, ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Open — Invalid certification
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Open — Invalid certification
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Open — Invalid certification
  • CImmediately hazardous

    Arrange and make self-closing the doors .. in the entrance located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Open — Invalid certification
  • BHazardous

    Repair or replace the smoke detector miissing located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Open — Invalid certification
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). - missing located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Open — Invalid certification
  • BHazardous

    Properly repair the broken or defective bell system from building street entrance door to foyer located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Open — Invalid certification
  • ANon-hazardous

    Replace with new the broken or defective cover plate for electric light switch at west wall in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north

    Oct 1, 2019 · Apt 3R

    Closed — Violation dismissed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... approx. 1 sq.ft. at upper north wall in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north original violation 13303618 issued 26-sep-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Sep 26, 2019 · Apt 3R

    Open — First no access to re- inspect violation
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; missing stops and oneway srews on air conditiner in the 1st room from north located at apt 3r, 3rd story, 1st apartment from west at north

    Sep 26, 2019 · Apt 3R

    Open — Invalid certification
  • CImmediately hazardous

    Remove the illegal fastening eye and hook capable of being padlocked at scuttle door to roof at public hall, 3rd story

    Sep 26, 2019

    Open — Invalid certification
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Sep 26, 2019

    Closed — Violation dismissed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 26, 2019

    Closed — Violation dismissed
  • CImmediately hazardous

    Arrange and make self-closing the doors .. in the entrance located at apt 3r, 3rd story, 1st apartment from west at north

    Sep 26, 2019 · Apt 3R

    Open — Invalid certification
  • BHazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north

    Sep 26, 2019 · Apt 3R

    Open — Invalid certification
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north

    Sep 26, 2019 · Apt 3R

    Open — Invalid certification
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... approx. 1 sq.ft. at upper north wall in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north

    Sep 26, 2019 · Apt 3R

    Closed — Violation closed
  • BHazardous

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 2nd room from north located at apt 3r, 3rd story, 1st apartment from west at north

    Sep 26, 2019 · Apt 3R

    Open — Invalid certification
  • BHazardous

    Repair or replace the smoke detector missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north

    Sep 26, 2019 · Apt 3R

    Open — Invalid certification
  • ANon-hazardous

    Properly repair the broken or defective bell buzzer system in the entrance located at apt 3r, 3rd story, 1st apartment from west at north

    Sep 26, 2019 · Apt 3R

    Closed — Violation dismissed
  • BHazardous

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)

    Jan 15, 2016

    Closed — Violation closed
  • BHazardous

    Arrange and make self-closing the doors .. in the entrance located at apt 2, 2nd story

    Sep 12, 2013 · Apt 2

    Closed — Violation closed
  • CImmediately hazardous

    Remove the illegal fastening cosisting of double cylinder key opperated lock in the entrance located at apt 2, 2nd story

    Sep 12, 2013 · Apt 2

    Closed — Violation dismissed
  • BHazardous

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate : illegal gate at window leading to the fire escape in the 4th room from north located at apt 2, 2nd story, 1st apartment from west at north

    Jul 9, 2013 · Apt 2

    Open — Not complied with

DOB building violations

No DOB violations on record

ECB violations

1 ECB violations, newest first.

  • Class - 1

    Work w/o a permit.at time of inspection, at 4th floor apt. 7 public hallway, drywall partition & electric wiring work in progress,in an (xxxxxx) multiple dwelling, w/o permits.obtain permits for construction &

    Feb 21, 2019 · Penalty $1,250

    Resolve