Violations at 314 58 Street
Brooklyn, NY 11220 · BBL 3-00854-0012 · Back to the property
HPD housing violations
12 HPD violations, newest first.
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling. and south wall at public hall, 1st story
Oct 8, 2023
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Oct 8, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and south wall at public hall, 1st story
Oct 8, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
Oct 8, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story
Oct 8, 2023
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective bell buzzer from building front to west wall in the foyer located at apt 4f, 4th story, 1st apartment from west at north
Oct 8, 2023 · Apt 4F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4f, 4th story, 1st apartment from west at north
Oct 8, 2023 · Apt 4F
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing metal tread 14th up from bottom 2nd story balcony fire escape at front
Apr 5, 2016
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)
Jan 15, 2016
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of house hold items at public hall, 4th story
Feb 25, 2013
Closed — Violation closed - BHazardous
Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof .. at public hall, 4th story
Feb 25, 2013
Closed — Violation closed - CImmediately hazardous
Fire escape defective. properly secure metal tread 2nd 3ed and 10th up 2nd to 3rd sty balcony front er1
Oct 19, 1999
Open — Nov sent out
DOB building violations
7 DOB violations, newest first.
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Zoning none
Z-zoning none
Nov 14, 1989
Dob violation - active - Zoning none
Z-zoning none
Nov 14, 1989
Dob violation - active - Zoning none
Z-zoning none
Nov 14, 1989
Dob violation - active - Zoning none
Z-zoning none
Nov 14, 1989
Dob violation - active
ECB violations
4 ECB violations, newest first.
- Non-hazardous
Having a sign extending above the ground floor ceilling (or more than 20 ft. above the curb level, whichever is less). remedy: remove illegal signage.
Feb 7, 2003
Resolve - Non-hazardous
Having a prohibited advertising sign in r-6 district. remedy: remove illegal signage.
Feb 7, 2003
Resolve - Non-hazardous
Having installed a sign without a permit. remedy; remove illegal work.
Feb 7, 2003 · Penalty $400
Resolve - Non-hazardous
45-tankless water heater a-head leaking
Aug 19, 1998 · Penalty $180
Resolve