roofy

Violations at 5723 5 Avenue

Brooklyn, NY 11220 · BBL 3-00848-0001 · Back to the property

HPD housing violations

The newest 50 of 72 HPD violations. The city keeps the complete history.

  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway , the bathroom , the 1st room from east at north located at apt 4b, 2nd story, 1st apartment from north at east

    Jul 7, 2026 · Apt 4B

    Open — Nov sent out
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4b, 2nd story, 1st apartment from north at east

    Jul 7, 2026 · Apt 4B

    Open — Nov sent out
  • CImmediately hazardous

    Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 4b, 2nd story, 1st apartment from north at east

    Jul 7, 2026 · Apt 4B

    Open — Not complied with
  • ANon-hazardous

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    May 13, 2026

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective door knob at south entrance door to the roof, at 1st public hall bulkhead from north, 3rd story

    May 13, 2026

    Closed — Violation closed
  • BHazardous

    Remove all encumbrances consisting of household articles at the intermediate landing, at public hall stairs, 3rd story

    May 13, 2026

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective latchset assembly of the pull handle at south entrance door to vestibule, at public hall, 1st story

    Mar 9, 2026

    Open — False certification
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch set assembly at the south entrance to vestibule , at public hall, 1st story

    Mar 9, 2026

    Closed — Violation closed
  • CImmediately hazardous

    Provide ready access to buildings heating system locked door at basement at boiler room

    Dec 27, 2025

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4b, 2nd story, 1st apartment from east at south

    Dec 27, 2025 · Apt 4B

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide adequate supply of hot water for the fixtures at kitchen and bathroom in the entire apartment located at apt 4b, 2nd story, 1st apartment from east at south

    Dec 15, 2025 · Apt 4B

    Closed — Violation dismissed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of key operated lock at door to fire escape in the 1st room from east at south located at apt 1c, 1st story, 1st apartment from south at west

    Nov 11, 2025 · Apt 1C

    Closed — Violation closed
  • BHazardous

    Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 4b, 2nd story, 1st apartment from north at east

    Nov 1, 2025 · Apt 4B

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 3c, 3rd story, 1st apartment from east at south

    Oct 26, 2025 · Apt 3C

    Closed — Violation dismissed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 4b, 2nd story, 1st apartment from north at east original violation 17764456 issued 17-mar-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Mar 17, 2025 · Apt 4B

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 4b, 2nd story, 1st apartment from north at east

    Mar 17, 2025 · Apt 4B

    Closed — Violation closed
  • CImmediately hazardous

    Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 4b, 2nd story, 1st apartment from north at east

    Mar 17, 2025 · Apt 4B

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4b, 2nd story, 1st apartment from north at east

    Mar 17, 2025 · Apt 4B

    Closed — Violation dismissed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 4b, 2nd story, 1st apartment from north at east

    Mar 17, 2025 · Apt 4B

    Closed — Violation closed
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4b, 2nd story, 1st apartment from north at east

    Mar 17, 2025 · Apt 4B

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide ready access to buildings heating system door lock at boiler room

    Mar 11, 2025

    Closed — Violation dismissed
  • BHazardous

    Repair the roof so that it will not leak over ceiling in the private hallway located at apt 1c, 3rd story, 1st apartment from west at north

    Mar 11, 2025 · Apt 1C

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the private hallway located at apt 1c, 3rd story, 1st apartment from west at north

    Mar 11, 2025 · Apt 1C

    Closed — Violation closed
  • BHazardous

    Repair or replace the smoke detector missing in the entire apartment located at apt 1c, 3rd story, 1st apartment from west at north

    Mar 11, 2025 · Apt 1C

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1c, 3rd story, 1st apartment from west at north

    Mar 11, 2025 · Apt 1C

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the kitchen located at apt 1c, 3rd story, 1st apartment from west at north

    Mar 11, 2025 · Apt 1C

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 4b, 2nd story, 1st apartment from east at south original violation 17734153 issued 04-mar-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Mar 4, 2025 · Apt 4B

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 4b, 2nd story, 1st apartment from east at south

    Mar 4, 2025 · Apt 4B

    Closed — Violation closed
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4b, 2nd story, 1st apartment from east at south

    Mar 4, 2025 · Apt 4B

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4b, 2nd story, 1st apartment from east at south

    Mar 4, 2025 · Apt 4B

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, south wall and ceiling in the bathroom located at apt 4b, 2nd story, 1st apartment from east at south

    Mar 4, 2025 · Apt 4B

    Closed — Violation closed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 4b, 2nd story, 1st apartment from east at south

    Mar 4, 2025 · Apt 4B

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing the doors that is missing or defective hinges at door in the entrance located at apt 4b, 2nd story, 1st apartment from east at south

    Sep 18, 2024 · Apt 4B

    Closed — Violation closed
  • BHazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 4b, 2nd story, 1st apartment from east at south

    Sep 18, 2024 · Apt 4B

    Closed — Violation closed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 3, 2024

    Closed — Violation dismissed
  • BHazardous

    Remove all encumbrances consisting of household items

    Dec 23, 2023

    Closed — Violation closed
  • CImmediately hazardous

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story

    Nov 4, 2023

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 4b, 2nd story, 1st apartment from east at south

    Nov 4, 2023 · Apt 4B

    Closed — Violation closed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1c, 3rd story, 1st apartment from south at west

    Jun 29, 2023 · Apt 1C

    Closed — Violation closed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 20, 2023

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt aa, 2nd story, 1st apartment from south at west

    Dec 14, 2022 · Apt AA

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 4b, 2nd story, 1st apartment from north at east

    Dec 14, 2022 · Apt 4B

    Closed — Violation dismissed
  • BHazardous

    M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from east at south located at apt 4b, 2nd story, 1st apartment from north at east

    Dec 14, 2022 · Apt 4B

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide ready access to buildings heating system boiler room door locked at boiler room

    Dec 14, 2022

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the kitchen located at apt 4b, 2nd story, 1st apartment from north at east

    Dec 14, 2022 · Apt 4B

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 18, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 18, 2022

    Open — Violation will be reinspected
  • BHazardous

    Remove all encumbrances consisting of household items at public hall, 1st story

    Nov 6, 2021

    Closed — Violation closed
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Nov 6, 2021

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at west wall at public hall, 2nd story

    Nov 6, 2021

    Closed — Violation closed

DOB building violations

8 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed

ECB violations

1 ECB violations, newest first.

  • Class - 2

    No spill switch, incorrect combustion air, no remote switch and discharge pipe threaded. correct violating conditions and sumbit a certificate of correction

    Jul 13, 2022

    Resolve