5120 6 Avenue
Brooklyn, NY 11220BBL 3-00800-0145Map
Owner of record: Great Eastern Barry LLC
5120 6 Avenue is a mixed residential and retail building built in 1931 in Brooklyn, 11220. It has 2 residential units across 3 floors. The owner of record is Great Eastern Barry LLC. HPD has recorded 9 housing violations here, most recently on March 6, 2013. 9 of the 9 most recent violations are still open.
- HPD violations
- 9
- DOB violations
- 29
- ECB violations
- 26
- HPD complaints
- 8
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 9
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Mar 6, 2013 · Apt 3
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Mar 6, 2013
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Mar 6, 2013 · Apt 3
Open — Nov sent out - CImmediately hazardous
Replace the broken or defective wash basin in the bathroom located at apt 3, 3rd story, 1st apartment from west at north
Mar 6, 2013 · Apt 3
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Mar 6, 2013 · Apt 3
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective mortise lock at the entrance door to building at public hall, 1st story
Nov 9, 2012
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood frame around door at the building entrance , 1st story
Nov 9, 2012
Open — Nov sent out - ANon-hazardous
Refit door at the building entrance , 1st story
Nov 9, 2012
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at building entrance door , 1st story
Jan 4, 2009
Open — Nov sent out
DOB building violations · 29
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Construction other optional
Borough commissioner has ordered all work stopped under application #321578495 on 6/2/22 due to construction superintendent withdrawal.
Jun 6, 2022
Dob violation - dismissed - Construction other optional
Borough commissioner has ordered all work stopped under application #321578495 on 6/2/22 due to construction superintendent withdrawal
Jun 6, 2022
Dob violation - dismissed - Construction other optional
Stop all work immediately except to make site safe contact the borough comm. office at 718 802-3677
Sep 17, 2021
Dob violation - dismissed - Construction other optional
Stop all work immediately except to make site safe contact the borough commissioner's office at 718 802-3677
Sep 17, 2021
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 22, 2021
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Construction other optional
Stop all work except to make site safety contact dept of bldgs 718 802-3685
Oct 3, 2019
Dob violation - dismissed - Construction other optional
Stop all work except to make site safe contact dept. of bldgs. at 718 802-3685
Oct 3, 2019
Dob violation - dismissed
Show 19 more ↓
- Plumbing none
The department of buildings intends to revoke all plumbing work under permit number 321578495 due to master plumber license revocation lmp number 2084 stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit
May 2, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Construction other optional
Comply with vacate order
Nov 2, 2018
Dob violation - active - Construction other optional
C-construction other optional
Oct 19, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed
ECB violations · 26
- Class - 2
Failure to safeguard all persons & property affected by construction operations. noted- at first floor level: observed an elderly woman sitting on a chair in the middle of the active 1st flr construction site w
Apr 14, 2023
Resolve - Class - 1
Bc3301.2 failure to institute & maintain safety equipment measures.note:at the time of inspection i observed there was inadequate egress/ingress to work area rear yard which creates a hazardous & unsafe conditi
Dec 3, 2020 · Penalty $2,500
Resolve - Class - 2
Construction superintendent failed to perform duties as per rule.the following hazardous conditions&stopwork order were observed&issued on this date.(1)construction super has not signed log or has been on site
Dec 3, 2020 · Penalty $5,000
Resolve - Class - 1
Permit holder failed to ensure workers receive safety orientation.@time of inspection of 3story alteration construction site in progress upon request for site safety orientation for workers they were unable to
Dec 3, 2020 · Penalty $1,250
Resolve - Class - 1
Bc3301.6.design,sizes&capacity of materials,structures temp construction&equipment.note-@time of inspection i observed work platform in rearyard made of wood.upon request for design drawings for platform none w
Dec 3, 2020 · Penalty $2,500
Resolve - Class - 2
Work without permit.at time of inspection observed construction fence erected in the rear of existiong building at the above address.the fencce is not maintained and supported in compliance with applicable code
Oct 18, 2019 · Penalty $620
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#3533488z issued on 10/20/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit @ 2nd fl etc,no record of permit.
May 1, 2019
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35314833y issued on 10/19/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for failure to provide pr
Mar 13, 2019 · Penalty $625
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35334882l issued on 10/20/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit. remedy: comply w/comm's order &/or file a c
Mar 5, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35334883k issued on 10-20-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner.
Mar 5, 2019 · Penalty $625
Resolve
Show 16 more ↓
- Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35314833y issued on 10/19/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for not providing protect
Jan 22, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35334883k issued on 10/20/18 & to file a certificate of cor rection pursuant to 28-201 and 1rcny 102-01.for:failure to maintain re
Jan 8, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35355644x issued on 10/20/18 and to file a certificate of correction pursuant to 28-201 and 1rcny 102-01.for:occupancy contrary at
Jan 8, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation #35314833y issued on 10/19/18 and to file a certification of correction pursuant to 28-201.1 and 1rcny 102-01.note:no document file
Dec 11, 2018 · Penalty $625
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35334883k issued on 10-20-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner. remedy: comp
Nov 27, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violatioin #35355644x issued on 10/20/18 and file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.occupancy contrary to tha
Nov 27, 2018 · Penalty $1,250
Resolve - Class - 1
Work w/o permit. noted:at 2nd fl residential unit:front a full height partition and closet installed creating:2 sro units separate and apartfrom dwelling unit. remedy:obtain all permits or restore premises to p
Oct 20, 2018 · Penalty $1,600
Resolve - Class - 1
Occupancy contrary to that allowed by the c of o or building dept records. at the time of inspection it was observed that premises legally approved for 2 family. now premises has 2 family w/ 3 additional sro cr
Oct 20, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in a code compliant manner. noted fire escape installed at rear-drop ladder does not reach ground rendering theappurtenance useless and hazardous if attempted as means of emergency
Oct 20, 2018 · Penalty $3,125
Resolve - Class - 2
3301.7:no monitoring reports.at time of inspection i requested for motitoring reports after the contractor excavated at the rear yard and they did not have the, at job site as required by code.comply with code.
Oct 19, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to safeguard all person sand property affected by construction operations.at time of inspection observed that the contractor excavted at the rear side and the fire escape ladder did not have ladning cre
Oct 19, 2018 · Penalty $10,000
Resolve - Class - 1
Failure to provide protection at sides of excavation. observed:contractor doing foundation work under valid permit#321578495 and approved set of drawings dated(5/10/18). in accordance w/ drawings sde-100.00&fo-
Oct 19, 2018 · Penalty $5,000
Resolve - Class - 1
Work does not conform to approved construction documents.at time of inspection observed an active construction site with foundation work in progress at the rear yard,during inspection noted that there is no soe
Oct 19, 2018 · Penalty $2,500
Resolve - Class - 1
Construction supertendent failed to perform duties per code.at time of inspection observed several violating conditions(1)work does not conform plans (2)no monitoring reports(3)no rule 52(4) no fire escape for
Oct 19, 2018 · Penalty $10,000
Active - Class - 1
No rule 52,at time of inspection after search at the bis system noted that the contractor did not notify the department within 24-48 hours of the start of excavation as required by code.comply with code
Oct 19, 2018 · Penalty $2,500
Active - Class - 1
Failure to provide unobstructed exit passageway. observed: at 3 story building on rear of laundromat at exp #3 work in progress under valid permit #321528495 for horizontal extension from cellar to 3rd fl. cont
Oct 3, 2018 · Penalty $312
Resolve
Complaints
- Electric
Lighting
Sep 22, 2015 · Apt BLDG
Close - Heating
Heat related
Jul 27, 2013 · Apt NA
Close - Heating
Heat related
Mar 5, 2013 · Apt 3
Close - Heating
Heat related
Nov 4, 2012 · Apt NA
Close - General
Doors
Nov 4, 2012 · Apt 3
Close - Heating
Heat related
Nov 1, 2012 · Apt 3
Close - Heating
Heat related
Dec 31, 2009 · Apt 3
Close - Electric
Electric-supply
Jul 20, 2009 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 2
- Building area
- 3,621 ft²
- Lot area
- 1,675 ft²
- Zoning
- R6A
- Community board
- 307
- Council district
- 38
- Block / lot
- 800 / 145
- Assessed value
- $114,600
- Landmark / historic district
- No
Questions about 5120 6 Avenue
Who owns 5120 6 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Great Eastern Barry LLC.
Does 5120 6 Avenue have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 5120 6 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 5120 6 Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 5120 6 Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.