Violations at 5103 5 Avenue
Brooklyn, NY 11220 · BBL 3-00800-0009 · Back to the property
HPD housing violations
The newest 50 of 168 HPD violations. The city keeps the complete history.
- BHazardous
Properly repair or replace the broken or defective electrical outlet at south and west wall in the 1st room from east at north located at apt 1b, 2nd story, 1st apartment from east at south
Oct 12, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at north, east and south wall in the 1st room from east at south located at apt 1b, 2nd story, 1st apartment from east at south
Oct 12, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 2nd story, 1st apartment from east at south
Oct 12, 2026 · Apt 1B
Open — Civ14 mailed - CImmediately hazardous
Properly repair or replace the broken or defective counter balance at lower sash 2nd window from north at east, in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling, east and south walls, in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance at lower sash 1st window from south at west, in the 5th room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor tiles, in the 5th room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood baseboard at north wall, in the 5th room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the north, west and south walls, in the 5th room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood threshold at the entrance in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles, in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood jambs, casing and stool at 2nd window from south at west, in the 5th room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood jambs and stool at 1st window from south at west, in the 5th room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood baseboard at west wall, in the 5th room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at the ceiling, north, south and west walls, in the 5th room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles, in the foyer located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and south wall, in the foyer located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective glass plan at the wood casement window in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling, east, south, west and north walls, in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly secure the loose washbasin in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles, in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east and south walls, in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles, in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles, in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective connection the waste line at sink in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink, in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective rubber gaskets at upper and lower refrigerator doors in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the south and north walls, in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story
Oct 27, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Oct 27, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Oct 27, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 27, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story
Oct 27, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 27, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Oct 27, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at bulkhead door at public hall, 3rd story
Oct 27, 2025
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Jul 25, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower window sash spring balance at the 1st window from west at north in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from east at south
Jul 25, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from east at south
Jul 25, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower window sash spring balance at the 2nd window from east at south in the 3rd room from north at east located at apt 2, 2nd story, 1st apartment from east at south
Jul 25, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from north at east located at apt 2, 2nd story, 1st apartment from east at south
Jul 25, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ceramic tiles at the west wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Jul 25, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door at the east wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Jul 25, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jul 25, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from east at south
Jul 25, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower window sash spring balance at the north wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from east at south
Jul 25, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jul 25, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Jul 25, 2025 · Apt 2
Open — Nov sent out
DOB building violations
12 DOB violations, newest first.
- Construction other optional
Additional information/exp1&4 walls severely cracked,bulging, compromised.temp shorng/bracng installed under emergency work order ownr to rtain nyspe to sbmt weekly monitorng plan w/crack/optical monitorng plan to feu.sbmt proposd monitorng plan
Oct 24, 2025
Dob violation - active - Immediate emergency anythingoptional
Immediately braced the exterior exposure 1 wall along 51 street at 2nd floor to roof (approx 50 lf in width) and the exposure 4 wall along 5 ave at 2nd floor to roof (approx 38 lf in width)
Jul 2, 2025
Dob violation - dismissed - Construction other optional
1stfl cast iron column sdwlk vault@exp1(5th ave)w/steel beam corroded/ compromised.front apts@2ndfl (1a)&3rdl (2a)compromised,including 1stfl commercial space.immed comply w/commissioner's order #342068 (050525feu30702pn) required stabilization wrk continue daily under nyse sprvsn
May 22, 2025
Dob violation - active - Construction other optional
Cast iron column at 1/4 corner leaning.exp1 masonry wall crckd thruout @1stfl to 3rdfl load bearng exp1 wall cmpromisd@1st thru 3rdflrs@apt1a (2ndfl)&2a(3rdfl) sdlk vault@exp4alng 5thave cmprmsd.ownr to immed rtain rtain gc to 1.immed instll/extnd sdwlk shed alng exp1@51st alng full width of bldg,2.instll cnstrctn fnce
May 5, 2025
Dob violation - active - Construction other optional
1stfl cast iron column sdwlk vault@exp1(5th ave)w/1stfl steel beam corroded/compromised.front apts@2ndfl(1a)&3rdfl (2a)compromised, includng 1stfl commercial space.ownr to rtain nyspe&gc reg w/dob to immed 1.temp shore bldg frm cellar to roof@apts 1a&2a,&below 2ndfl exp 1&4 spandrels
May 5, 2025
Dob violation - active - Construction other optional
Partial vacate/failure to maintain bldg in safe condition.exp1.4 cast iron column leaning@1stfl exp1 load bearng wall crckdthroughout 1st thry 3rdfl.exp4 sdwlk vault cmprmsd w/steel [email protected] to rtain nyspe to eval ent bldg&file rpair dwgs w/dob bldg to be perm rpaird undr prmt strtng by 6/9/25&cmpltd/sgn
May 5, 2025
Dob violation - active - Construction other optional
Structural stability inspection at the cellar & 1st floor commercial s pace. please submit enginners report by monday april 21st to include d etails of the shoring & a letter of omission owner to hire nyspe to submit report to ert [email protected] gov by monday april 21st addressing condition with plans & photos
Apr 18, 2025
Dob violation - active - Construction other optional
Structural stability inspection at the cellar and 1st floor commercia l space level-as per feu, it is recommende to be partially vacated due to a structural stability partial vacate for floor 1 & cellar
Apr 18, 2025
Dob violation - active - Construction other optional
Emergency work ordr.per engneer report by tt dated 5/17/23,exp1 brck crckd out&bulgng out @1st thru 3rd flrs near exp1/4 crnrbrck pier @ cellar settled apprx4 in. portions of bldg unsfe&requires.ownr to rtain nys pe&gc to immed:1.intall sdwalk shed along exp1@51,as req'd, 2.instll bldg shorng/bracng,as req'd und
May 22, 2023
Dob violation - active - Construction other optional
On 51 street (north east facade) there are major step cracks at first floor and second to third floors.
May 11, 2023
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations
11 ECB violations, newest first.
- Class - 2
At the time of inspection, observed the sidewalk shed not maintained in a safe condition. the pedestrian walkway was obstructed by an unauthorized enclosed structure, stored materials, and unauthorized electric
Jul 28, 2026 · Penalty $2,400
Active - Class - 2
At the time of my inspection of a 3 story building, i observed sidewalk shed in place at exposure #1 and 4 with a valid permit expiration date 04-18-2026 and with the fallowing objection inoperable light bulbs.
Mar 19, 2026
Resolve - Class - 2
At time of inspection in response to complaint i observed underside of sidewalk shed a not illuminated as per 3307.6.4.8. this creates a hazardous condition for public walking underneath while dark and not bein
Feb 25, 2026
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments. sidewalk shed has pipe scaffolding above which is contrary to plans stated on job #b01223072-i1-sh, conform work to approved
Oct 29, 2025 · Penalty $2,530
Active - Class - 1
Work without a permit. pipe scaffolding exceeds over 40' which requires work permit., obtain permit
Oct 29, 2025 · Penalty $12,500
Active - Class - 1
Failure to maintain building in code compliant manner. at exposure 1 at 51st street their are major step cracks in facade wall in between the 2nd and 3rd floor., repair and/replace
Oct 29, 2025 · Penalty $2,500
Active - Class - 2
Atoi observed at apt 1a removal of lath and plaster in living room area interior walls apx 20x6 feet also removal of fire stopping material in ceiling between apartment 1a and 2a. no change to partitions, elect
May 13, 2025 · Penalty $1,280
Active - Class - 1
Failure to safeguard all persons and properly affected by constructionoperations. at time of inspection i observed fire escape opening in sidewalk shed obstructed with wood board blocking fire escape ladder fro
Oct 31, 2024
Resolve - Class - 1
On 51 street (north east facade) there are major step cracks at first floor and second to third floors., maintain exterior building wall; provide protection for public and make all necessary repairs.
May 11, 2023 · Penalty $2,500
Active - Class - 2
36
Jun 29, 2020
Resolve - Class - 1
50a. (50a)-no work permit filed with d.o.b.for the gas fired weil mclam boiler.
Jun 29, 2020
Resolve