Violations at 523 51 Street
Brooklyn, NY 11220 · BBL 3-00792-0056 · Back to the property
HPD housing violations
47 HPD violations, newest first.
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the foyer located at apt 6, 3rd story, 1st apartment from north at east
Jan 8, 2026 · Apt 6
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective door frame to entrance in the 1st room from north at east located at apt 6, 3rd story, 1st apartment from north at east
Jan 8, 2026 · Apt 6
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6, 3rd story, 1st apartment from north at east
Jan 8, 2026 · Apt 6
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 6, 3rd story, 1st apartment from north at east
Jan 8, 2026 · Apt 6
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at wash basin and bathtub in the bathroom located at apt 6, 3rd story, 1st apartment from north at east
Jan 8, 2026 · Apt 6
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of door with key operated lock installed, preventing entrance to fire escape room in the 1st room from north at east located at apt 3c, 3rd story, 1st apartment from north at east
Oct 14, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counterbalance at lower sash window in the 1st room from north at east located at apt 3c, 3rd story, 1st apartment from north at east
Oct 14, 2024 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [ latch set] at the front entrance to building, , 1st story
Apr 9, 2024
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Apr 9, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles, in the 1st room from east at south located at apt 1a, 1st story, 1st apartment from south at west
Apr 9, 2024 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 1a, 1st story, 1st apartment from west at north
Sep 5, 2023 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Sep 5, 2023 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 2 sq ft at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Sep 5, 2023 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood flooring near window in the 1st room from north at east located at apt 1a, 1st story, 1st apartment from south at west
Aug 29, 2023 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Aug 29, 2023 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx. 2 sq.ft at north wall in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Aug 29, 2023 · Apt 1A
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at west stack building front at fire escape, 3rd story
Jun 28, 2023
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at west stack building front at fire escape, 2nd story
Jun 28, 2023
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 3rd sty at fire escape at front of building
Jun 20, 2023
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 2nd sty at fire escape at front of building
Jun 20, 2023
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1a, 1st story, 4th apartment from south at west
Apr 10, 2021 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1a, 1st story, apartment at west
Apr 10, 2021 · Apt 1A
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 2, 2020
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Oct 2, 2020
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Oct 2, 2020
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 2, 2020
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 2, 2020
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Oct 2, 2020
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 2, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 1a, 1st story, 1st apartment from south at west
Oct 2, 2020 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance window lower sash in the 1st room from north at west located at apt 1a, 1st story, 1st apartment from south at west
Oct 2, 2020 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Oct 2, 2020 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl foor tiles in the 1st room from north located at apt 1a, 1st story, 1st apartment from south at west
Oct 2, 2020 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling approximately 2 sq ft in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Oct 2, 2020 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Oct 2, 2020 · Apt 1A
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 3rd story balcony at building front stack at fire escape
May 23, 2020
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Mar 6, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Mar 6, 2020
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wooden sub-floor in the private hallway located at apt 1a, 1st story, 1st apartment from south at west
Mar 6, 2020 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Properly secure the loose electrical outlet north wall in the kitchen located at apt 1a, 1st story, apartment at west
Nov 26, 2018 · Apt 1A
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1a, 1st story, apartment at west
Nov 26, 2018 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tile in the 4th room from north located at apt 1a, 1st story, apartment at west
Nov 26, 2018 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective wood floor in the private hallway located at apt 1a, 1st story, apartment at west
Nov 26, 2018 · Apt 1A
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required, light fixture present
Feb 22, 2014
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt 1a, 1st story, apartment at west
Apr 1, 2013 · Apt 1A
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1a, 1st story, apartment at west
Apr 1, 2013 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 1a, 1st story, apartment at west
Apr 1, 2013 · Apt 1A
Closed — Violation dismissed
DOB building violations
5 DOB violations, newest first.
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations
1 ECB violations, newest first.
- Hazardous
19b,6b
Jul 22, 2003 · Penalty $800
Resolve