roofy

Violations at 558 50 Street

Brooklyn, NY 11220 · BBL 3-00792-0024 · Back to the property

HPD housing violations

The newest 50 of 63 HPD violations. The city keeps the complete history.

  • BHazardous

    Properly repair the source and abate the evidence of a water leak at the west wall, south wall, and the ceiling in the 5th room from north located at apt 3b, 3rd story, 1st apartment from south at west

    Sep 14, 2026 · Apt 3B

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, south wall, and the ceiling in the 5th room from north located at apt 3b, 3rd story, 1st apartment from south at west

    Sep 14, 2026 · Apt 3B

    Open — Nov sent out
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at the ceiling in the bathroom located at apt 3b, 3rd story, 1st apartment from south at west

    Sep 14, 2026 · Apt 3B

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 3b, 3rd story, 1st apartment from south at west

    Sep 14, 2026 · Apt 3B

    Open — Nov sent out
  • BHazardous

    Remove all encumbrances consisting of bicycle at lower intermediate landing, at public hall stairs, 1st story

    Jul 31, 2025

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 4a, 4th story, 1st apartment from north at east

    Feb 3, 2025 · Apt 4A

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 4a, 4th story, 1st apartment from north at east

    Feb 3, 2025 · Apt 4A

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west

    Jan 30, 2025 · Apt 2C

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west

    Jan 30, 2025 · Apt 2C

    Closed — Violation dismissed
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on 2nd story balcony stack from north at west exterior wall at west yard at fire escape

    Mar 22, 2023

    Closed — Violation dismissed
  • BHazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at front yard

    Mar 22, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 22, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... approximately 4 square feet at ceiling in the bathroom located at apt 3b, 3rd story, 1st apartment from south at west

    Feb 23, 2021 · Apt 3B

    Closed — Violation closed
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3b, 3rd story, 1st apartment from south at west

    Feb 23, 2021 · Apt 3B

    Closed — Violation dismissed
  • ANon-hazardous

    Properly secure the loose electric outlet at south wall in the 3rd room from east located at apt 3b, 3rd story, 1st apartment from west at north

    Jul 20, 2020 · Apt 3B

    Closed — Violation closed
  • ANon-hazardous

    Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also missing chain guard in the entrance located at apt 3b, 3rd story, 1st apartment from west at north

    Jul 20, 2020 · Apt 3B

    Closed — Violation closed
  • BHazardous

    Provide support brackets for air conditioner on 2nd, 3rd and 4th stories at east exterior wall of building (front of building)

    Jul 20, 2020

    Closed — Violation closed
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items on 2nd and 4th story balconies at west stack (rear yard)

    Jul 20, 2020

    Closed — Violation closed
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items on 3rd story balcony at east stack (front of building)

    Jul 20, 2020

    Closed — Violation closed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of key operated lock installed at door leading to room with fire escape window in the 1st room from east at north located at apt 2a, 2nd story

    Jul 20, 2020 · Apt 2A

    Closed — Violation dismissed
  • BHazardous

    Fire escape defective. replace with new the broken, defective and/or missing bolts at welded treads at 7th and 8th up from bottom, of 2nd story balcony, at building front at fire escape

    Apr 2, 2020

    Closed — Violation closed
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items on the 2nd story balcony, north exterior wall at fire escape

    Feb 14, 2020

    Closed — Violation closed
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Feb 14, 2020

    Closed — Violation dismissed
  • BHazardous

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at building front stack

    Jan 1, 2020

    Closed — Violation dismissed
  • BHazardous

    Replace with new the missing vestibule door at public hall, 1st story

    Dec 4, 2019

    Closed — Violation closed
  • CImmediately hazardous

    Properly repair the broken or defective lock assembly at front entrance door to building , 1st story

    Dec 4, 2019

    Closed — Violation closed
  • BHazardous

    Replace with new the missing vestibule door at public hall, 1st story

    Nov 19, 2019

    Closed — Violation closed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Nov 19, 2019

    Closed — Violation dismissed
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12. at public hall

    Jan 22, 2019

    Closed — Violation closed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Nov 11, 2018

    Closed — Violation dismissed
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at wall at public hall, 1st story

    Nov 11, 2018

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the kitchen located at apt 1d, 1st story, 1st apartment from south at west

    Apr 24, 2017 · Apt 1D

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the bathroom located at apt 1d, 1st story, 1st apartment from south at west

    Apr 24, 2017 · Apt 1D

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak ceiling and west wall in the kitchen located at apt 1d, 1st story, 1st apartment from south at west

    Apr 24, 2017 · Apt 1D

    Closed — Violation closed
  • CImmediately hazardous

    Properly repair the source and abate the evidence of a water leak ceiling and east wall in the bathroom located at apt 1d, 1st story, 1st apartment from south at west

    Apr 24, 2017 · Apt 1D

    Closed — Violation closed
  • BHazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the inner court at east

    Jul 2, 2015

    Closed — Violation closed
  • BHazardous

    Replace with new the broken or defective rubber gasket at refrigerator in the kitchen located at apt 3b, 3rd story, 1st apartment from south at west

    May 16, 2015 · Apt 3B

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective pilot light at gas range in the kitchen located at apt 3b, 3rd story, 1st apartment from south at west

    May 16, 2015 · Apt 3B

    Closed — Violation closed
  • ANon-hazardous

    Properly repair with similar material the broken or defective wood floor throughout in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west

    May 16, 2015 · Apt 3B

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling and all walls at closet aprox = 10 sq ft in the 2nd room from north located at apt 3b, 3rd story, 1st apartment from south at west

    Aug 7, 2013 · Apt 3B

    Closed — Violation closed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north

    Mar 26, 2013 · Apt 3A

    Closed — Violation closed
  • CImmediately hazardous

    Provide ready access to buildings heating system locked boiler room at cellar

    Jan 10, 2010

    Closed — Violation closed
  • BHazardous

    M/d law abate the nuisance consisting of concealed water leak at ceiling in the bathroom located at apt 2c, 2nd story, 2nd apartment from south at west

    Dec 2, 2009 · Apt 2C

    Closed — Violation closed
  • BHazardous

    Abate the nuisance consisting of mice .. in the entire apartment located at apt 1d, 1st story, 1st apartment from south at west

    Nov 5, 2009 · Apt 1D

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 1d, 1st story, 1st apartment from south at west

    Nov 5, 2009 · Apt 1D

    Closed — Violation closed
  • BHazardous

    Replace with new the broken or defective upper and lower window sash counter balances at 1 story intermediate landing at public hall, 1st story

    May 6, 2009

    Closed — Violation closed
  • CImmediately hazardous

    Provide ready access to buildings heating system locked door to boiler room

    Apr 16, 2009

    Closed — Violation closed
  • BHazardous

    Arrange and make self-closing the doors :apt door in the entrance located at apt 1d, 1st story, 1st apartment from east at south

    Mar 17, 2009 · Apt 1D

    Closed — Violation closed
  • ANon-hazardous

    Refit window sashes in the entire apartment located at apt 1d, 1st story, 1st apartment from east at south

    Mar 17, 2009 · Apt 1D

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective counterbalance at all upper and lower sashes [total 5 windows] in the entire apartment located at apt 1d, 1st story, 1st apartment from east at south

    Mar 17, 2009 · Apt 1D

    Closed — Violation closed

DOB building violations

12 DOB violations, newest first.

  • Immediate emergency anythingoptional

    Install approximately 52 linear ft of sidewalk shed along exposure 1 and continue the sidewalk shed wrapround to exposure 4 for approx 10 linear ft, for a total of approx 62 linear ft. the sidewalk shed be fully decked & sheeted tight to the facade of the property. the side walk shed at expo 4 shall fully cover & protect the building entrance

    Dec 24, 2025

    Dob violation - dismissed
  • Construction other optional

    4 story nfp building with several exterior defects that include step cracks at parapet wall level, decorative stone missing section of stone at 3 locations.

    Dec 23, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 8, 1996

    Vp*-violation unserved ecb- dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active

ECB violations

4 ECB violations, newest first.

  • Class - 1

    At the time of inspection, observed exposed uncapped sidewalk shed bolts accessible to pedestrians, posing a contact injury hazard. this condition violates bc 3307.6.5.6. provide caps or other suitable protecti

    Oct 27, 2026 · Penalty $1,250

    Active
  • Class - 2

    At the time of inspection, observed a sidewalk shed in place. upon inspection, the required sidewalk shed parapet information panel was not provided, contrary to bc 3301.9.2. failure to provide the required sid

    Oct 27, 2026 · Penalty $1,250

    Active
  • Class - 1

    4 story nfp building with several exterior defects that include step cracks at parapet wall level, decorative stone missing section of stone at 3 locations., repair and/replace

    Dec 1, 2025 · Penalty $2,500

    Active
  • Class - 2

    Failure to file required annual boiler inspection reports for low-pressure boiler 30000026769y0002 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo

    May 28, 2025 · Penalty $312

    Active