Violations at 4922 6 Avenue
Brooklyn, NY 11220 · BBL 3-00784-0047 · Back to the property
HPD housing violations
29 HPD violations, newest first.
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
Sep 8, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story
Sep 8, 2025
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 4th story
Sep 8, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Nov 28, 2022 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Nov 28, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Nov 28, 2022 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north
Jan 20, 2022 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar
Jan 20, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north
Jan 20, 2022 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from east at north, the 3rd room from east at north, the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Sep 18, 2016 · Apt 3C
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches located at apt 3c, 3rd story, 1st apartment from south at west
Sep 18, 2016 · Apt 3C
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice located at apt 3c, 3rd story, 1st apartment from south at west
Sep 18, 2016 · Apt 3C
Closed — Violation closed - BHazardous
Repair or replace the smoke detector inoperative located at apt 3c, 3rd story, 1st apartment from south at west
Sep 18, 2016 · Apt 3C
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative located at apt 3c, 3rd story, 1st apartment from south at west
Sep 18, 2016 · Apt 3C
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches located at apt 3c, 3rd story, 1st apartment from south at west
Sep 18, 2016 · Apt 3C
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice located at apt 3c, 3rd story, 1st apartment from south at west
Sep 18, 2016 · Apt 3C
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical light fixture at ceiling in the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Sep 18, 2016 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; located at apt 3c, 3rd story, 1st apartment from south at west
Sep 18, 2016 · Apt 3C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak , east wall in the bathroom located at apt 3c, 3rd story, 1st apartment from south at west
Sep 18, 2016 · Apt 3C
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 6, 2015
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective mortise lock and assembly in the entrance located at apt 3c, 3rd story, 1st apartment from west at north
Aug 24, 2015 · Apt 3C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3c, 3rd story, 1st apartment from west at north
Apr 24, 2015 · Apt 3C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3c, 3rd story, 1st apartment from west at north
Apr 24, 2015 · Apt 3C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west 1 window in the 1st room from north at west located at apt 3c, 3rd story, 1st apartment from west at north
Apr 24, 2015 · Apt 3C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood sil at north 2 window in the 1st room from north at west located at apt 3c, 3rd story, 1st apartment from west at north
Apr 24, 2015 · Apt 3C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 3c, 3rd story, 1st apartment from west at north
Apr 24, 2015 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; located at apt 3c, 3rd story, 1st apartment from west at north
Apr 24, 2015 · Apt 3C
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes at 3rd story east balcony at front of the building
Jan 14, 2015
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required , light fixture present
Aug 18, 2014
Closed — Violation closed
DOB building violations
3 DOB violations, newest first.
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations
1 ECB violations, newest first.
- Class - 2
Weilmclain egh-125 not operational. correct violating condition & submit a certificate of correction.
Dec 6, 2022
Resolve