Violations at 4916 6 Avenue
Brooklyn, NY 11220 · BBL 3-00784-0043 · Back to the property
HPD housing violations
The newest 50 of 119 HPD violations. The city keeps the complete history.
- BHazardous
Properly repair or replace the broken or defective intercom from building entrance to apt #: 3a. in the entire apartment located at apt 3a, 1st story, 2nd apartment from west at north
May 4, 2026 · Apt 3A
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 3a, 1st story, 2nd apartment from east at south
May 8, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective cracked cement spalling at parapit wall above 4th window from west at south at building front , 4th story
Sep 23, 2024
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at window recess at 1st and 2nd window from east at south in the 3rd room from north at east located at apt 3c, 3rd story, 2nd apartment from east at south
Sep 23, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak over the window recess at 1st and 2nd window from east at south in the 3rd room from north at east located at apt 3c, 3rd story, 2nd apartment from east at south
Sep 23, 2024 · Apt 3C
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective cracked cement spalling at parapit wall above 4th window from west at south at building front , 4th story
Sep 23, 2024
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 4b, 2nd story, 1st apartment from north at east
Feb 9, 2024 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall (near floor) in the bathroom located at apt 4b, 2nd story, 1st apartment from north at east
Feb 9, 2024 · Apt 4B
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective counter-balances at lower sash of window at east wall in the 1st room from east at north located at apt 4b, 2nd story, 1st apartment from north at east
Feb 9, 2024 · Apt 4B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). misiing located at apt 1d, 4th story, 2nd apartment from north at east
Feb 2, 2024 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 1d, 4th story, 2nd apartment from north at east
Feb 2, 2024 · Apt 1D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the bathroom located at apt 1c, 3rd story, 2nd apartment from north at east
Jan 26, 2024 · Apt 1C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroom located at apt 1c, 3rd story, 2nd apartment from north at east
Jan 26, 2024 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4a, 1st story, 1st apartment from west at north
Jan 26, 2024 · Apt 4A
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4a, 1st story, 1st apartment from west at north
Jan 26, 2024 · Apt 4A
Open — Defect letter issued - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4b, 2nd story, 1st apartment from north at east
Jan 26, 2024 · Apt 4B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at north wall approx 3 sq ft and west wall approx 6 sq ft in the bathroom located at apt 4b, 2nd story, 1st apartment from north at east original violation 16144338 issued 28-jul-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jul 28, 2023 · Apt 4B
Open — Defect letter issued - BHazardous
Trace and repair the source and abate the visible mold condition... inside closet approx 6 sq ft in the bathroom located at apt 3b, 2nd story, 2nd apartment from south at west original violation 16138513 issued 28-jul-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jul 28, 2023 · Apt 3B
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 5th room from east located at apt 3a, 1st story, 2nd apartment from south at west
Jul 28, 2023 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of a padlocked installed at gate at fire passage way
Jul 28, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door to rear yard at public hall, 1st story
Jul 28, 2023
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Jul 28, 2023
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling at public hall, 4th story
Jul 28, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the bulkhead ceiling , 4th story
Jul 28, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling on bulkhead , 4th story
Jul 28, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 3d, 4th story, 2nd apartment from south at west
Jul 28, 2023 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 5th room from east located at apt 3d, 4th story, 2nd apartment from south at west
Jul 28, 2023 · Apt 3D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 4th story, 2nd apartment from south at west
Jul 28, 2023 · Apt 3D
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wooden base cabinet at west wall in the kitchen located at apt 3d, 4th story, 2nd apartment from south at west
Jul 28, 2023 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 3d, 4th story, 2nd apartment from south at west
Jul 28, 2023 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the foyer located at apt 3d, 4th story, 2nd apartment from south at west
Jul 28, 2023 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective sagged flooring in the 1st room from east at north located at apt 1d, 4th story, 2nd apartment from north at east
Jul 28, 2023 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective sagged flooring in the private hallway located at apt 1d, 4th story, 2nd apartment from north at east
Jul 28, 2023 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 3c, 3rd story, 2nd apartment from south at west
Jul 28, 2023 · Apt 3C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3c, 3rd story, 2nd apartment from south at west
Jul 28, 2023 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 4c, 3rd story, 1st apartment from north at east
Jul 28, 2023 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling near to window in the 2nd room from east located at apt 1c, 3rd story, 1st apartment from north at east
Jul 28, 2023 · Apt 1C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical light switch on east wall in the 1st room from east at north located at apt 4b, 2nd story, 1st apartment from north at east
Jul 28, 2023 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 4b, 2nd story, 1st apartment from north at east
Jul 28, 2023 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at south located at apt 4b, 2nd story, 1st apartment from north at east
Jul 28, 2023 · Apt 4B
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in wash basin wasteline in the bathroom located at apt 4b, 2nd story, 1st apartment from north at east
Jul 28, 2023 · Apt 4B
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective caulking around bathtub in the bathroom located at apt 4b, 2nd story, 1st apartment from north at east
Jul 28, 2023 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroom located at apt 4b, 2nd story, 1st apartment from north at east
Jul 28, 2023 · Apt 4B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at north wall approx 3 sq ft and west wall approx 6 sq ft in the bathroom located at apt 4b, 2nd story, 1st apartment from north at east
Jul 28, 2023 · Apt 4B
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3b, 2nd story, 2nd apartment from south at west
Jul 28, 2023 · Apt 3B
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3b, 2nd story, 2nd apartment from south at west
Jul 28, 2023 · Apt 3B
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair or replace the broken or defective door peephole in the entrance located at apt 3b, 2nd story, 2nd apartment from south at west
Jul 28, 2023 · Apt 3B
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective mortise lockest in the entrance located at apt 3b, 2nd story, 2nd apartment from south at west
Jul 28, 2023 · Apt 3B
Open — First no access to re- inspect violation - ANon-hazardous
Refit the entry door in the bathroom located at apt 3b, 2nd story, 2nd apartment from south at west
Jul 28, 2023 · Apt 3B
Open — First no access to re- inspect violation
DOB building violations
29 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations
6 ECB violations, newest first.
- Class - 1
Failure to comply w/the comm's order contained in summons/vio#35446362l issued on 01/07/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit,at cellar level. remedy: comply w
Aug 24, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35446362l issued on 01/07/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit at cellar level. remedy: comply w
Jun 22, 2021 · Penalty $6,250
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#35446362l issued on 1/7/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work witout permit at th
Feb 22, 2021 · Penalty $2,500
Resolve - Class - 1
Work w/o a permit. failure to comply w/the comm's order contained in summons/vio#035446362l issued on 1/7/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &
Oct 5, 2020 · Penalty $2,500
Active - Class - 1
Work without a permit.note:at cellar level erected full height partitions creating rooms.installed water and waste lines for three (3)pc bathroom.installed unpermitted gas line.rem:obtain permit.
Jan 7, 2020 · Penalty $2,500
Resolve - Class - 2
B265 as per class 2 (b265) 28-303.7 failure to file a complete boilerinspection report as per dob records. submit a current bo9 report.
Feb 2, 2017 · Penalty $500
Active