Violations at 515 49 Street
Brooklyn, NY 11220 · BBL 3-00775-0082 · Back to the property
HPD housing violations
The newest 50 of 52 HPD violations. The city keeps the complete history.
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame in the entrance located at apt 1b, 1st story, 2nd apartment from north at east
Sep 16, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Replace with new the missing marble saddle at entrance in the bathroom located at apt 1b, 1st story, 2nd apartment from north at east
Sep 16, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly secure the loose medicine cabinet at west wall in the bathroom located at apt 1b, 1st story, 2nd apartment from north at east
Sep 16, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1b, 1st story, 2nd apartment from north at east
Sep 16, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1b, 1st story, 2nd apartment from north at east
Sep 16, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective grout at wall tiles in the bathroom located at apt 1b, 1st story, 2nd apartment from north at east
Sep 16, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1b, 1st story, 2nd apartment from north at east
Sep 16, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1b, 1st story, 2nd apartment from north at east
Sep 16, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 2nd apartment from north at east
Sep 16, 2026 · Apt 1B
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1b, 1st story, 2nd apartment from north at east
Sep 16, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 2nd apartment from north at east
Sep 16, 2026 · Apt 1B
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective spring balance lower sash window in the bathroom located at apt 1b, 1st story, 2nd apartment from north at east
Sep 16, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 20, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 10, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 22, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 22, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 6, 2021
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing mortidr lockset at door in the entrance located at apt 4b, 4th story, 1st apartment from north at east
Apr 22, 2019 · Apt 4B
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 4b, 4th story, 1st apartment from north at east
Apr 22, 2019 · Apt 4B
Open — Nov certified late - ANon-hazardous
Provide a screen for non wired glass at bulkhead at public hall, 4th story
Apr 22, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 22, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 22, 2019
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Apr 22, 2019
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective intercom in the foyer located at apt 4b, 4th story, 1st apartment from north at east
Apr 22, 2019 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of a free standing cast iron radiator at floor at public hall, 3rd story
Apr 22, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 15, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 6, 2015
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south
Jan 21, 2009 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from west at north wall in the 4th room from north located at apt 1b, 1st story, 1st apartment from west at north
Nov 16, 2008 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at west wall in the private hallway located at apt 1b, 1st story, 1st apartment from west at north
Nov 16, 2008 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st radiator from west at north wall in the 3rd room from north located at apt 1b, 1st story, 1st apartment from west at north
Nov 16, 2008 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) east wall, west wall, 1st window frame from west at north wall in the kitchen located at apt 1b, 1st story, 1st apartment from west at north
Nov 16, 2008 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) 1st radiator from west at north wall, 1st riser from west at north wall in the kitchen located at apt 1b, 1st story, 1st apartment from west at north
Nov 16, 2008 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st riser from south at west wall, 2nd riser from south at west wall, 1st window frame from north at east wall in the bathroom located at apt 1b, 1st story, 1st apartment from west at north
Nov 16, 2008 · Apt 1B
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the private hallway located at apt 1b, 1st story, 1st apartment from west at north
Nov 16, 2008 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, west wall, east wall, north wall, ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from west at north
Nov 16, 2008 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at north wall, baseboard at east wall, baseboard at west wall in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
May 11, 2006 · Apt 1A
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
May 11, 2006 · Apt 1A
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at north wall, baseboard at east wall, baseboard at west wall, 1st radiator from west at north wall in the 3rd room from north located at apt 1a, 1st story, 1st apartment from west at north
May 11, 2006 · Apt 1A
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at north wall, baseboard at east wall, 1st window frame from west at north wall in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Apr 14, 2006 · Apt 1A
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Apr 14, 2006 · Apt 1A
Open — First no access to re- inspect violation - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling east room 4 sty northeast apt 4b er1 97013476 , section '' ''
Jul 29, 1997 · Apt 4B
Open — First no access to re- inspect violation - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint north wall east room 4 sty northeast apt 4b er1 97013476 , section '' ''
Jul 29, 1997 · Apt 4B
Open — First no access to re- inspect violation - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint east wall east room 4 sty northeast apt 4b er1 97013476 , section '' ''
Jul 29, 1997 · Apt 4B
Open — First no access to re- inspect violation - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling center room 4 sty northeast apt 4b er1 97013476 , section '' ''
Jul 29, 1997 · Apt 4B
Open — First no access to re- inspect violation
DOB building violations
4 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active
ECB violations
No ECB violations on record