Violations at 517 49 Street
Brooklyn, NY 11220 · BBL 3-00775-0080 · Back to the property
HPD housing violations
15 HPD violations, newest first.
- CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130f in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Dec 8, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 1b, 1st story
Oct 21, 2016 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Refit upper and lower sash windows in the 4th room from east located at apt 1b, 1st story, apartment at south
Oct 21, 2016 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor covering in the 4th room from north located at apt 1b, 1st story, 1st apartment from north at east
Sep 29, 2016 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor covering in the kitchen located at apt 1b, 1st story, 1st apartment from north at east
Sep 29, 2016 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood sub floor in the kitchen located at apt 1b, 1st story, 1st apartment from north at east
Sep 29, 2016 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Refit 2 windows at south wall in the 4th room from north located at apt 1b, 1st story, 1st apartment from north at east
Sep 29, 2016 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective sliding closet doors at 2 closets at west wall in the 1st room from north located at apt 1b, 1st story, 1st apartment from north at east
Sep 29, 2016 · Apt 1B
Closed — Violation closed - ANon-hazardous
Refit closet door in the 1st room from north located at apt 1b, 1st story, 1st apartment from south at west
Sep 26, 2016 · Apt 1B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 1st room from east located at apt 2d, 2nd story, 1st apartment from west at north
Jul 25, 2016 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from west at north
Jul 25, 2016 · Apt 2D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from west at north
Jul 25, 2016 · Apt 2D
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallway located at apt 2d, 2nd story, 1st apartment from west at north
Jul 25, 2016 · Apt 2D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from west at north
Jul 25, 2016 · Apt 2D
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 18, 2015
Closed — Violation dismissed
DOB building violations
1 DOB violations, newest first.
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations
No ECB violations on record