roofy

Violations at 523 49 Street

Brooklyn, NY 11220 · BBL 3-00775-0075 · Back to the property

HPD housing violations

The newest 50 of 70 HPD violations. The city keeps the complete history.

  • CImmediately hazardous

    Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story

    Aug 14, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance door

    Aug 14, 2026

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall stairs, 2nd story

    Jun 2, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall stairs, 2nd story

    Jun 2, 2026

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door , 3rd story

    Jun 2, 2026

    Closed — Violation closed
  • BHazardous

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at bulkhead , 3rd story

    Jun 2, 2026

    Open — Nov sent out
  • BHazardous

    Remove all encumbrances consisting of household items at public hall stairs, 3rd story

    Jun 2, 2026

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 3rd story

    Jun 2, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story

    Jun 2, 2026

    Closed — Violation closed
  • BHazardous

    Repair the roof so that it will not leak over the ceiling at public hall, 3rd story

    Jun 2, 2026

    Open — Nov sent out
  • BHazardous

    Remove all encumbrances consisting of household items at public hall, 2nd story

    Jun 2, 2026

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 2nd story

    Jun 2, 2026

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 1st story

    Jun 2, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic floor tile at public hall, 1st story

    Jun 2, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch at building entrance door , 1st story

    Jun 2, 2026

    Closed — Violation closed
  • ANon-hazardous

    Properly repair with similar material the broken or defective masonry stucco at south exterior wall at 3rd story

    Jun 2, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair or replace the broken or defective lower sash counter balance at 2nd window from east at south in the 6th room from north located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at secondary egress at north in the 6th room from north located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective all electrical outlets at west wall in the 6th room from north located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling in the 6th room from north located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 6th room from north located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective vinyl floor in the kitchen located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective mechanical air vent at ceiling in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective upper sash glass pane at window at east in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective reglaze enamel porcelain at bathtub in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • CImmediately hazardous

    Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at east wall in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly secure the loose washbasin in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the foyer located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at . in the entrance located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • ANon-hazardous

    Properly repair or replace the broken or defective mechanical stopper at bathtub in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north

    Jun 2, 2026 · Apt 2R

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch set at building entrance door

    May 31, 2026

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story

    May 31, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story

    May 31, 2026

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 2nd apartment from north at east

    May 31, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 2nd apartment from north at east

    May 31, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2r, 2nd story, 2nd apartment from north at east

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective sloping wood floor in the kitchen located at apt 2r, 2nd story, 2nd apartment from north at east

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective outlet south wall in the entire apartment located at apt 2r, 2nd story, 2nd apartment from north at east

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective outlet at north wall in the entire apartment located at apt 2r, 2nd story, 2nd apartment from north at east

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet fill valve in the bathroom located at apt 2r, 2nd story, 2nd apartment from north at east

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective mechanical vent at ceiling in the bathroom located at apt 2r, 2nd story, 2nd apartment from north at east

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at north wall in the entrance located at apt 2r, 2nd story, 2nd apartment from north at east

    May 31, 2026 · Apt 2R

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 2r, 2nd story, 2nd apartment from north at east

    May 31, 2026 · Apt 2R

    Open — Nov sent out

DOB building violations

1 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed

ECB violations

No ECB violations on record